A folding door that arrives on site is not the end of the job. For Santerson Wood Veneer Folding Doors, the difference between a clean handover and weeks of snag lists is decided months earlier, in how delivery and installation are planned together. Because these doors are made to measure for each project, the opening, the frame, the hardware and the site sequence all have to agree before anything is shipped.
Why Made-to-Measure Doors Need Earlier Planning Than Standard Joinery
Wood veneer folding doors are configured per project: dimensions, panel layout and finish are specified for the space rather than picked from a stock size. That single fact changes the whole programme. There is no substitute batch to draw from the warehouse, so a measurement error or a late change of opening does not delay one door — it delays a production run that has already been cut.
The practical consequence is simple: door specification should be locked at the point when wall build-ups, floor finishes and ceiling levels are settled, not after. If the finished floor level or the wall thickness is still moving, the opening size is still moving too, and a made-to-measure order cannot follow a moving target.
Santerson Wood Veneer Folding Doors — made to measure, with layout and finish specified per project.
Step 1: Fix the Opening Before Anything Is Released
The most common avoidable problem on a folding door package is a dimensional conflict between the design drawing and the built opening. Work through these checks with the site team, not only from drawings:
- Finished versus structural dimensions. Record opening width and height to the finished face — after plaster, tiling, flooring and skirting — because folding door leaves are made to the clear opening, not the blockwork.
- Wall build-up and headroom. Confirm what sits above the opening. A track needs a continuous, structurally sound fixing line; insulated stud walls, bulkheads and services in the ceiling void all affect how the track is supported.
- Floor threshold condition. Decide whether the bottom guide is recessed into the floor or surface-fixed. Recessed guides must be set while the screed is still wet, which puts them far ahead of the door delivery date.
- Panel layout and stacking direction. Where the folded stack parks affects wall returns, switch plates, radiator positions and furniture layouts. Agree it on plan before the drawing is signed off.
- Adjacent trades. Electricians, plasterers and flooring contractors all need the door schedule early, because their settings depend on the leaf thickness and the track line.
Step 2: Group Doors With the Rest of the Interior Package
Folding doors rarely travel alone on a project. In villa and hospitality fit-outs they sit alongside wardrobes, panelling, cabinetry and other joinery in the same veneer or coordinating tone. Ordering the Windows and Doors package together with the related interior finishes keeps batch matching manageable and puts one production window across several trades.
It also simplifies freight. Consolidating doors, joinery and Interior Fixtures into shared containers means fewer separate consignments to track, fewer clearance events, and a site sequence you can actually plan around. Splitting the door order from the rest of the joinery usually means two delivery windows and two sets of access arrangements.
Step 3: Plan Freight Around Site Readiness, Not Production Dates
SANTERSON's Furniture Logistics and Door-to-door Delivery service covers freight forwarding by sea, air and rail, packaging and container loading, customs paperwork and shipment tracking. That scope helps, but a delivery date is only useful if the building is ready to receive it. Before booking transport, confirm with your own team:
- A dry, secure storage area. Veneered leaves cannot sit in an unenclosed space awaiting a trade. Storage must be indoors, level and off the ground.
- Access for the delivery vehicle. Check vehicle size, gate widths, lift capacity and any stair or narrow-corridor route to the room where the doors are installed.
- A named receiving contact. Someone has to sign, check quantities against the packing list and report any damage on the day, while the claim window is open.
- Import arrangements for your country. Duties, Incoterms, insurance and clearance responsibilities should be settled in your own contract terms rather than assumed from marketing material.
Step 4: Receiving and Inspection on the Day
Inspection is where most installation problems get caught cheaply. On arrival, keep the packaging intact until each leaf is checked, then record:
- Panels against the door schedule — number of leaves per opening, sizes, hinge and handle side, stacking direction.
- Finish condition on both faces, with particular attention to edges and corners of veneered leaves.
- Hardware sets against the packing list: track, leaves, guides, handles, locks or pulls, and adjustment pieces.
- Veneer tone across all leaves for one opening, checked side by side in daylight before anything is fixed.
Photograph any damage on the packaging and on the leaf before signing. A dated photo with the consignment reference gives both your supplier and your insurer something to work with; a clean signature closes that option.
Step 5: Installation Sequencing With Other Trades
Folding doors are a finishing trade. Install them after wet work, flooring and ceiling lines are complete, and before final decoration of the leaves themselves if touch-in is planned on site. The sequence that usually works:
- Openings handed over with confirmed finished dimensions and levels.
- Track line and any recessed guide set in place, checked for level and support.
- Leaves hung, adjusted for parallel closing and smooth travel along the full track.
- Handles, pulls and any lock hardware fitted and tested through several complete cycles.
- Protection applied to the leaves, then final decoration touch-in around the frame.
Where on-site fixing is part of the package, Furniture Installation and After-sales Support covers installation, inspection and snagging. Confirm in advance who supplies local labour for your project, what scope the site guidance includes, and which items are inspected at handover — availability of installers in a given country varies by project and should be agreed in writing rather than assumed.
Step 6: Handover Checklist That Prevents Snag Disputes
Walk every opening with the site supervisor and sign off item by item. A short, consistent checklist keeps the record clear:
| Check | What good looks like |
|---|---|
| Travel | Leaves fold and unfold without binding or dragging across the whole track. |
| Closure | Meeting stiles close flush; no visible gap along the closing line. |
| Alignment | Leaves parallel when closed; no twist across the opening. |
| Hardware | Handles, pulls and locks operate smoothly and are firmly fixed. |
| Finish | Veneer faces free of marks, with tone consistent within each opening. |
| Documentation | Door schedule, spare-parts list and the agreed after-sales terms filed together. |
Common Failure Points and How to Avoid Them
Ordering against unfinished levels
If the finished floor level moves after the order, the leaf heights no longer suit the opening. Freeze levels in writing before release.
Splitting one opening across two shipments
Partial releases create matching and timing problems for a single set of leaves. Keep each opening's package together in one consignment.
No storage plan at site
Veneered leaves damaged in storage are the most expensive category of avoidable loss, because replacement restarts a made-to-measure run.
Track fixed to an unsupported line
A track fixed into background that was never designed to carry it will sag under repeated use. Confirm the fixing substrate when the opening is handed over.
Bringing It Together
Delivery and installation planning for made-to-measure folding doors is mostly a sequencing discipline: fix the openings, group the doors with the rest of the joinery package, ship to site readiness rather than to production dates, inspect on arrival, install after wet work and hand over against a written checklist. Santerson's Turnkey Interior Project Solutions span design coordination through production, logistics and installation support, which means the same team can be involved from specification to handover — provided your project brief sets out opening conditions, site readiness dates and local labour responsibilities clearly.
For a project enquiry, send the door schedule, drawings and finished levels with your request so that sizing, freight and installation can be planned as one package rather than three separate problems. If openings are still open to change, flag that in the enquiry — it is cheaper to adjust a drawing than a production run.