A door quotation rarely fails because of the veneer. It fails because the opening, the swing direction and the hardware set were left open, so three suppliers quote three different doors and none of the prices can be compared. If you are sourcing Santerson Wood Veneer Hinged Doors for a villa or apartment package, the request for quote (RFQ) is where the scope gets fixed. Below is the information list we use on our own door projects, and what each line changes in the final number.
Why the RFQ format matters for veneer doors
Wood veneer hinged doors sit in the middle of the door range. The leaf is built to a project size and finished with a veneer and lacquer that has to match the wall panelling, the wardrobe fronts and the joinery around it. Our product pages describe these doors as configurable: finish, layout and dimensions are specified per space, and the configuration includes made-to-measure sizing plus material and finish options. That is exactly why an enquiry such as "20 hinged doors, oak, please quote" cannot be answered with a usable price.
A single project usually mixes two or three door types from the same family. A bedroom corridor may take Santerson Flush Hinged Doors where the leaf sits flush with the wall surface, and the same veneer on a conventional hinged leaf elsewhere. Each type has its own frame detail, so each needs its own line in the RFQ with its own dimensions.
The eight items every door RFQ must carry
1. Door schedule: one row per opening
Send a schedule rather than a drawing mark-up alone. For each opening give the room name, the reference number on your drawings, the quantity, and whether the door is single or double leaf. If you are working from a Windows and Doors scope that also includes sliding, pocket and folding leaves, keep the hinged doors in their own table so the frame and hardware logic does not get mixed.
2. Opening size versus leaf size, and which one you are giving us
State the width and height you measured, say whether that is the structural opening or the finished opening, and give the floor finish build-up so the threshold gap can be set. For made-to-measure work we confirm dimensions and the selected specification for each project before production starts; a dimension given without a reference point is not a dimension.
3. Wall construction and frame condition
Tell us what the door sits in: masonry, light-gauge steel stud, timber stud, or an existing frame being replaced. Give the wall thickness including plasterboard and finish, because that sets the casing and architrave width. Where the design calls for a concealed or flush detail, note it — Santerson Decorative Concealed Doors and flush hinged leaves are framed differently from a standard cased door.
4. Swing hand, hinge side and number of hinges
Mark left-hand or right-hand against the elevation you attach. State the hinge count and whether concealed or visible hinges are required, since a flush detail usually drives the hinge choice. This is a manufacturing dimension, not an installer preference — getting it wrong after production means replacement, not adjustment.
5. Veneer species, cut, grain direction and sheen
Name the veneer and, where appearance matters, the cut and grain run. Give the sheen level for the lacquer and whether the surface is matte or high gloss. Where the door has to match existing joinery, send the physical sample rather than a colour name; photographs do not carry grain or sheen reliably.
6. Hardware set and pre-machining
List the lock body type, handle size, whether the leaf is machined for an electronic lock, and any kickplate, viewer or acoustic seal. If you intend to supply your own hardware, say so in the RFQ and give us the template drawings early.
7. Matching items in the same veneer
If the same veneer also appears on wall panelling, wardrobe fronts or cabinetry, put those items in the enquiry. Batching them with the doors keeps the veneer lot and the lacquer batch consistent across the package.
8. Delivery terms and site conditions
Give the delivery address, the Incoterm you want quoted, and any site constraints such as lift dimensions or a storage area. Our logistics service covers freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery, so the destination and access details belong in the RFQ from day one.
Door schedule template you can paste into your enquiry
| Field | What to write | Why it changes the price |
|---|---|---|
| Ref / room | Drawing number and room name | Ties the door to one elevation, avoids wrong swing hand |
| Quantity | Per opening, per door type | Batching same-spec leaves reduces tooling and veneer waste |
| Opening W x H | Structural or finished opening, stated clearly | Sets leaf size, frame build and threshold gap |
| Wall thickness | Including board and finish | Sets casing depth and architrave width |
| Swing hand | LH / RH against the attached elevation | Hinge and lock machining, fixed at production |
| Veneer + sheen | Species, cut, matte or gloss, sample reference | Veneer lot and lacquer batch matching across the package |
| Hardware | Lock type, handles, concealed hinges, electronic lock | Machining detail and hardware supply responsibility |
| Delivery | Address, Incoterm, site access | Packaging, freight mode and container loading plan |
What we send back in the quotation
A complete RFQ lets us return a quotation you can actually compare line by line. Expect the leaf and frame specification restated in words, the finish system named, the hardware list separated from the door price, the packaging description, and the freight option you asked for. Where our interior design service is involved, drawings and production coordination run ahead of the order, so the quotation reflects a confirmed detail rather than an assumption.
Questions worth asking before you place the order
- Which veneer lot will this batch come from, and can the wall panels be ordered from the same lot?
- Is the frame shown in your detail a concealed frame or a cased frame, and which architrave profile goes with it?
- What is machined at the factory versus what is cut on site for the lock and hardware?
- How are leaves protected for ocean freight, and what spare parts are supplied with the order?
- Who carries out installation, and how are snags recorded at handover?
RFQ readiness check
- Every opening has a size, a swing hand and a wall thickness.
- Each door type is quoted as its own line item.
- Veneer species and sheen are named, with a sample reference.
- Hardware responsibility — ours or yours — is stated per door type.
- Delivery address, Incoterm and site access are included.
Putting the whole package in one enquiry
Doors rarely travel alone on a villa or hotel fit-out. When the same project also needs Wood Veneer Panels, wardrobe fronts or kitchen cabinetry, send those schedules with the door schedule. A single enquiry across the timber elements lets one factory keep the veneer and lacquer consistent, and gives you one production and shipping plan instead of four. That is what our Turnkey Interior Project Solutions service is built around: consultation, design and planning, production, logistics, installation and after-sales.
Send us your door schedule
Attach the schedule, the elevations and the finish sample, and we will quote each opening against the specification you have given. Contact PHILLIP on +86-13928214007 or santerson@qq.com, or use our contact page. Enquiries receive a response within 24 hours, Monday to Saturday, 8:00 AM to 6:00 PM GMT+8.