A door schedule that arrives after the joinery package is signed off is one of the most common and most expensive coordination problems on a villa or boutique-hotel fit-out. By the time someone remembers the bedroom and bathroom doors, the wall panelling, wardrobes and veneer finishes have already been specified, and the openings are left to be matched to whatever is available. This article sets out how to carry Santerson Decorative Interior Doors through a whole-project materials schedule from the first space-planning stage to handover, so the doors sit in the same line item group as everything else they have to blend with.
Why decorative interior doors belong in the materials schedule, not the trades list
On most project schedules, wall finishes, cabinetry and joinery are listed early because they drive long-lead production. Doors are often left to a separate trade package and priced late. For a standard off-the-shelf leaf that is manageable. For a decorative door whose panel profile, veneer species and finish have to read as one surface with the surrounding panelling, it is not: the door becomes a custom item that has to be produced in the same batch and to the same reference sample as the joinery.
The Decorative Interior Doors line sits within the wider Interior Doors collection and is supplied made to measure, with material and finish options and a layout tailored to the project. Its close relatives in the same range — Santerson Flush Interior Doors for minimal-reveal openings and Santerson Wood Veneer Hinged Doors where grain matching is the priority — are scheduled the same way. That configurability is exactly what makes these doors schedule-friendly, but only if their line items are created at the same moment as the wall and cabinet items they pair with.
Step 1 — Group the doors with the finishes they must disappear into
Before quantities, group the door schedule by the surrounding condition rather than by room number. On a typical villa or hospitality floor this gives you three working groups:
- Panelled and veneered walls. Doors here are specified against the same veneer and lacquer reference as Wood Veneer Panels, so the leaf reads as a continuation of the wall.
- Built-in joinery and wardrobe runs. Bedroom and dressing-room openings sit against Built-in Furniture line items, where reveal sizes, door thickness and handle choice are shared decisions.
- Plain painted or textured wall conditions. Standard hinged leaves can be scheduled separately here, because the matching requirement is colour and sheen rather than grain.
Where a door has to sit inside a panelling run with no visible frame, that opening should be raised as an integrated detail during design coordination instead of being solved on site. Integrated Door & Paneling is the product line to reference in that case, and it belongs in the same schedule section as the panelling itself. Concealed variants such as Santerson Handleless Concealed Doors need the same early treatment, because a handleless detail changes both the leaf preparation and the ironmongery allowance.
Step 2 — Set out what each door line item must record
A materials schedule row for a made-to-measure decorative door needs more than a code and a quantity. The fields below are the ones that prevent a re-order later in the programme.
| Schedule field | What to record | Why it matters late in the job |
|---|---|---|
| Opening size and tolerance | Finished opening width and height, floor finish build-up, and the assumed gap at the threshold | Doors are made to measure; a slab or screed change after the door order is fixed is the most frequent cause of rework. |
| Leaf style and collection | Hinged, sliding, pocket, folding or concealed, plus the named collection | The hardware set and wall buildup follow from this choice, not the other way round. |
| Finish reference | The veneer species, lacquer or paint reference, cross-referenced to the wall or cabinet item it matches | Two batches of "oak, matt" will not match unless both are called against one approved sample. |
| Ironmongery allowance | Hinge type and count, lock prep, handle or handleless detail | Concealed and flush details have to be prepped in the leaf at production, not cut on site. |
| Wall interface | Architrave, shadow gap, or frameless flush detail, with the party responsible for each side | Ambiguity here turns into a variation between the door supplier and the wall contractor. |
| Delivery sequence | The batch order and site delivery window relative to wet trades and flooring | Decorative leaves arriving before the wet trades finish get damaged in storage; arriving after, they stall handover. |
Step 3 — Coordinate doors with the fit-out items that share their finishes
The doors that cause the most coordination work are the ones whose neighbours are also custom. Kitchens, wardrobes and vanities are usually produced from the same material palette, so a single approved finish board should govern all of them.
- Kitchen cabinetry. A pantry or utility door at the end of a run of Custom Built-in Kitchen Cabinets should be called against the cabinet door front, not the wall.
- Wardrobe fronts. Where a wardrobe uses hinged fronts, the room door and the wardrobe front are best ordered together so grain direction and sheen are set once.
- Bathroom fit-out. En-suite entrances abut tiled and panelled conditions; the reveal and threshold detail should be agreed with the Bathroom Sanitary Fixtures layout before tiling is set out.
- Flooring transitions. Engineered Wood Flooring changes level at thresholds; door undersides have to be dimensioned against the finished floor, so flooring and doors should be scheduled in the same section.
Step 4 — Approve one physical reference before releasing quantities
For a decorative door programme, sample approval is the gate that protects everything downstream. A practical sequence:
- Issue the door schedule with collections named and finish references cross-referenced to wall and joinery items.
- Request a maker's sample of the leaf profile and finish, plus the ironmongery prep detail for one representative opening.
- Sign off that sample against the panelling and cabinet samples in one place, under one approval date.
- Release quantities by group — panelled conditions first, joinery-adjacent openings second, plain wall conditions third.
Dimensions and selected specifications for each project should be confirmed at release. Where a door type repeats across floors, it is worth noting explicitly that the schedule assumes consistent finished floor levels; if they differ, the opening sizes are not interchangeable even when the design intent is identical.
Step 5 — Put delivery and installation into the same row
Made-to-measure doors arrive as a batch that has to be kept together on site. Two scheduling habits prevent most damage: number every leaf against its schedule code, and sequence delivery after the wet trades and floor finishes in that zone are complete. Where the project is being supplied internationally, Furniture Logistics and Door-to-door Delivery — packing, container loading and the delivery window — should be planned against the same programme used for the joinery package, so the doors and the cabinetry land together rather than months apart.
The Furniture Installation and After-sales Support stage is where snags on reveals, alignment and ironmongery are closed out. Recording the door schedule codes on the snag list — rather than room numbers — makes it straightforward to trace a replacement part later.
A short checklist for the next schedule revision
- Doors grouped by wall and joinery condition, not by room number.
- Every matching door called against a named finish reference shared with its neighbour.
- Integrated panel-and-door openings raised as design-coordination items, not site solutions.
- One signed sample covering leaf profile, finish and ironmongery prep before quantities are released.
- Delivery windows tied to the joinery package and to completed wet trades.
If your project needs the door schedule developed alongside cabinetry, panelling and other fit-out items, send us the drawings and finish intent and we will return a coordinated schedule with made-to-measure configurations for review. Talk to our project team about Turnkey Interior Project Solutions.