Closet sliding panels look simple on a drawing and complicated on site. One panel short, one track out of line, one finish sample that never reached the trades, and a tidy joinery package turns into reorders and a delayed handover. Because Santerson Closet Sliding Panels are made to measure for each space, quantity planning and product coordination have to be settled before production starts, not after the panels arrive. This guide walks through how buyers, contractors and designers scope a panel order so the count, sizes, finishes and hardware all agree with the drawings they were taken from.

Start From Openings, Not Panel Counts

The most common quantity error is counting panels straight off an elevation. A wardrobe wall drawn as four equal leaves may need six narrower leaves once the ceiling line, skirting, architrave or a services run is measured on site. Sliding panels sit inside or in front of an opening, and their width is set by the clear opening plus the overlap each leaf needs to cover the adjacent one.

For every closet position, record three numbers before you specify anything else:

  • The clear structural opening — width, height and depth, measured at head, middle and sill, because rarely is a wall square.
  • The finished floor and finished ceiling levels, including the thickness of plasterboard, render, tiles or flooring that has not been installed yet.
  • The obstruction list: downlights, air grilles, curtains, door handles, corner returns, skirting and any pipe or switch plate in the panel path.

Send those measurements together with the marked-up drawings rather than a single room dimension. Made-to-measure panels are cut to the file you provide, so an ambiguous note comes back as a made-to-measure problem on site.

How Panel Quantity Is Actually Set

Panel count follows from three decisions, and each one changes the order:

DecisionWhat it changes in the quantity list
Track layout — single, double or stacked tracksA double track that lets two leaves pass each other needs more panels than a single track where every leaf stops at its neighbour. Count the leaves the track can carry, not just the ones visible in the render.
Panel width and leaf overlapNarrower leaves mean more units, more hardware sets and more handling. Wider leaves reduce count but need stronger track and more clearance to operate.
Access requirementA closet that must open fully needs every leaf to stack clear of the opening. If the stacking zone is too short, add a return track or split the run — both change quantities.

When you write the bill of quantities, list panels per opening with its own line item and reference number. A single "closet panels, 24 off" line hides which room each panel belongs to, and that is exactly what installers need on the day.

Coordinating the Panel Range With Adjacent Products

Closet panels rarely sit alone. In villa and apartment fit-outs the same wall assembly usually meets a wardrobe carcass, an internal door, a storage wall and sometimes a room divider, and all of them have to share a finish, a shadow gap and a track detail. Coordinating them in one order rather than three is what keeps colour and grain consistent.

Where the closet face continues into a larger storage run, Santerson Sliding Storage Panels can carry the same leaf language across the wall while giving open shelving and drawer zones behind. Where the intent is a glazed or mirrored front instead of a solid panel, the Glass Sliding Door Wardrobes range covers the same made-to-measure principle with glass fronts. If the closet also acts as a room divider, Santerson Partition Sliding Systems is the position to check early, because partition tracks carry different loading and floor-clearance requirements than a closet front.

Order finish samples for every panel line in the project at the same time. Panels from separate orders can be the same named finish and still read differently once they are side by side under site lighting.

Hardware, Track and Site Preparation

Quantity planning fails most often on the small parts. For each opening confirm with the factory:

  • Track type and length, whether it is surface mounted or recessed, and who supplies it — panel supplier, joinery contractor or the site carpenter.
  • Hanging hardware per leaf, including rollers, floor guides and bump stops, plus spares for the highest-traffic closets.
  • Load path: what the head track is fixed to. Timber noggin, steel backing or a reinforced substrate has to be drawn and installed before the ceiling closes.
  • Floor detail: whether a bottom guide or threshold is required, and how it meets the finished floor level and any underfloor heating.

Put these items on the same drawing sheet as the panel schedule. A site team that can see the fixing substrate, the track section and the panel edge detail on one sheet does not have to guess, and guessing is what produces call-backs.

A Practical Release Sequence

For multi-unit work — apartment floors, villa groups, hotel guest rooms — release the order in a sequence that protects the programme:

  • Round 1, survey. Verify openings on site after wet trades and floor finishes are set. Send marked-up dimensions with the obstruction list.
  • Round 2, approval panel. Have one complete opening produced and shipped first: one leaf of each finish, the track, the hardware. Fit it, sign it off, keep it as the site reference.
  • Round 3, batch release. Release remaining openings in delivery batches that match the install sequence, labelled by room number rather than by purchase order line.

The approval panel costs a little more and saves a great deal. It settles overlap, shadow gap, handle position and finish before thirty identical closets are in production.

What to Send With the Enquiry

A complete enquiry shortens the quotation loop from several rounds to one. Include:

DocumentPurpose
Room-by-room panel scheduleOpening reference, quantity of leaves, leaf width and height, track arrangement.
Elevations with levelsFixing substrate, ceiling and finished floor levels, stacking zones.
Finish scheduleNamed finish per opening, sample reference, gloss level, edge treatment.
Site conditions noteAccess for delivery, storage area, lift dimensions, installation window.
Delivery planBatch sequence by room, port or site destination, Incoterms agreed.

SANTERSON works as a manufacturer and one-stop supplier for furniture and building materials, so panel orders can be placed alongside the joinery, doors, flooring and fixtures they meet on site. That is where coordination pays: Custom & OEM Service covers bespoke sizes and finishes for the panel fronts, Logistics & Door-to-Door Delivery handles freight and packaging to site, and Installation & After-sales Support covers fitting and snag resolution. For a project that already has several of these elements open, the Turnkey Solutions scope keeps the panel schedule in step with the rest of the fit-out.

Before You Sign Off the Quantity List

  • Does every opening reference on the schedule match a marked-up drawing?
  • Is the leaf count consistent with the track arrangement and the stacking zone shown?
  • Are spares listed for rollers and guides on high-use closets?
  • Has one approval panel been fitted and signed off before batch production?
  • Do adjacent products — wardrobe fronts, storage walls, partitions — use the same finish reference?
Send your marked-up openings, panel schedule and finish list to SANTERSON, and the closet sliding panel quantities, track layout and hardware set can be confirmed against your drawings before production is released.