A glass modular wardrobe is a made-to-measure item. The price depends on the size of the opening, the door and frame combination, the internal layout and how far the unit has to travel. That means an enquiry that only says "walk-in robe, 3 metres" cannot be priced accurately. Below is the information our team works from when quoting glass modular wardrobes, and what you can send on your side to make the first quote close to the final one.

1. The room, not just the wardrobe

Start with where the unit sits and who uses it. A bedroom in an owner's suite, a guest room in a small hotel and a kids' room in a villa all need different internal proportions even at the same width. Please tell us:

  • Project type and location — apartment, villa, boutique hotel, serviced apartments.
  • How many rooms need wardrobes, and whether the units repeat across rooms or each one is unique.
  • Who uses them and what they store: long hanging, folded shelves, drawers, suitcases, ironing board, safe.
  • Whether the wardrobe is a new build or a replacement in an occupied room — this changes how we pack and deliver.

2. Dimensions with the constraints attached

Send overall width, height and depth for each opening, and note anything that cuts into the box: ceiling bulkheads, beams, skirting, radiators, doors that swing into the run, uneven floors or out-of-square walls. Modular wardrobes are assembled from sections on site, so a 20 mm difference at the ceiling is normally manageable — but we need to know it exists before production.

A sketch with dimensions marked is enough for a first pass. If you have CAD or a measured drawing from your designer, send that instead; if not, photographs of each wall plus a simple hand-drawn plan works well.

Where the wardrobe meets other trades, say so. Glass-fronted units are usually set out after flooring and ceiling finishes are fixed, so tell us which finish will be in place and what thickness it adds.

3. Door style and glass type

The door is the largest single cost driver, so this is where detail pays. Tell us the opening method — hinged, sliding or open — and the frame you want around the glass. Our aluminium frame glass wardrobes use a slim metal profile around the panel, while other options pair the glass with a solid or lacquered door body. For the glass itself, specify:

  • Tone and transparency: clear, frosted, smoked or ribbed. Each reads very differently in a small room.
  • Frame colour and finish, matched to ironmongery or joinery elsewhere in the project.
  • Whether you want interior lighting behind the glass, and where the power feed will be.
  • Any requirement for safety-rated glass on a particular wall — we quote the build to suit the room, not a default specification.

4. Internal layout and fittings

Modular construction means each section can be configured separately. Send us a rough split per section: hanging length, shelf count, drawer banks, tall storage for cases. If you cannot decide yet, tell us your storage habits and we will propose a layout with the drawing.

Also confirm body material and finish, edge treatment, and any accessories such as pull-out rails, trouser pulls, jewellery trays, integrated hampers or a built-in safe. Accessories quoted later are the most common reason a quote changes between first issue and order.

5. Programme, delivery address and installation

Give us the required on-site date, the delivery address, and who installs. We handle custom and OEM service from drawing approval through production, plus logistics and door-to-door delivery, so we need to know whether the unit ships flat-packed to a builder, to a consolidator, or direct to site — and whether installation support is required. For fit-out programmes that also cover kitchen cabinetry, vanities, doors and wall panelling, coordinating those items in one production run usually simplifies both shipping and site sequencing.

What a complete enquiry looks like

ItemMinimum we needBetter still
ProjectType, city, number of roomsRoom list with quantities per type
SizesWidth, height, depth per openingMeasured drawing or marked sketch with obstructions
DoorsOpening method + glass toneFrame colour, sample reference or photo
InternalsHanging / shelf / drawer splitAccessory list and lighting positions
ProgrammeRequired on-site dateSite sequence, other fit-out trades, install responsibility

Where enquiries go wrong

Three things cause most re-quoting. First, dimensions taken before the floor and ceiling finishes are decided, so the height changes after production starts. Second, a glass tone chosen from a phone screen — send the reference or order a sample before sign-off. Third, an assumed installation arrangement; if nobody on site is scheduled for wardrobe assembly, that needs to be booked at quotation stage rather than in the final week.

If you are specifying wardrobes alongside other built-in work, our custom minimalist bedroom wardrobe page shows the level of internal layout detail we normally confirm before production.

Send us your room list and dimensions

Open our contact page and send the sketch, quantities and target dates (phone/WhatsApp +86-13928214007, email santerson@qq.com). We will return a quotation with the section layout drawn out, so you can check the storage against the room before anything goes into production.