A swim spa is one of the few site-fitted items in a villa or resort package where a vague enquiry turns into expensive rework. Shell shape, jet layout, lighting circuits and access all have to agree before the shell is formed. The brief below is what our engineering team works from, and it is the same list we recommend you send when you want a custom luxury outdoor swim spa with massage jets, LED and water features built to your drawings rather than to ours.

Why the first brief decides the final price

In an acrylic or stainless steel spa, the jets, nozzles, chromotherapy lights, handrails and seating benches are all formed into the shell during manufacture. Move a jet after the shell is cured and you are patching, not adjusting. The same applies to the cabinet and the plant room: once the reinforced cabinet and the isolated power layout are welded and wired, relocating an equipment bay means re-making the frame.

So the enquiry that says "one 5.9 m swim spa, grey cabinet" and the enquiry that lists shell dimensions, jet count by zone, pump duty, lighting colour, water-feature type and site access will reach two different quotations. The second one is closer to what you actually pay, because we are quoting your configuration instead of guessing it.

Section 1: the site file

Send us the physical constraints before the wish list. We design the cabinet, the steps, the equipment bay and the lifting plan around them.

  • Clear opening and access route. Overall width and height of the gate, side passage or crane reach, plus whether the unit is installed on a slab, a raised timber deck or a recessed pit.
  • Finished shell envelope. Length, width and depth you want within that envelope. Our configurable range runs from compact units around 3.9 m long to extended swim-and-relax layouts beyond 11 m, so the length drives which platforms are realistic rather than which colour you prefer.
  • Structural support. Deck joist spacing and load rating if the spa sits on a terrace or balcony; slab thickness and anchor details if it sits on ground.
  • Electrical supply. Available supply capacity, breaker size and where the isolator will sit. Total connected load differs widely between configurations, so this is not something we can leave to site.
  • Drain, overflow and make-up water. Where drainage connects, whether a sand filtration loop is required, and how the unit is filled after servicing.
  • Climate exposure. Full sun, coastal salt air, freeze-thaw winters or an enclosed indoor room. This changes shell formulation, cabinet material, insulation and cover specification.

Section 2: swimming performance, not just length

Tell us how the unit will be used, because a swim spa for daily lap training and a swim spa for children's play are different products wearing the same name.

What you tell usWhy it changes the build
Training purpose: rehabilitation, casual swimming, endurance or triathlon-style intervalsDetermines swim training system duty and nozzle arrangement at the swim end.
Desired continuous swim length without turningSets shell length and whether a long channel with a separate relaxation zone is needed.
Number of regular users and their heightsAffects water depth, bench heights and step geometry.
Whether two people swim side by sideSets minimum internal width and jet spacing across the channel.
Hours of use per day and seasonalityDrives heat pump sizing, insulation package and filtration cycle length.

Section 3: massage jets — specify zones, not a total count

A quotation that only states "60 jets" tells you nothing about how the spa feels. Our catalogue shows configurations with as few as six jets on a long swim platform and more than seventy on an extended model; the difference is duty, not marketing. Send us this instead:

  • Zone map. Which seats or lounging benches get jets, and which body areas each zone targets — calves, lower back, shoulders, feet.
  • Jet type per zone. Hydrotherapy water jets, air jets from an optional air blower, or rotating massage heads. Air jets run on a separate blower circuit and are normally kept away from the swim channel.
  • Burnish and finish. Stainless steel faces against an acrylic or wood-look cabinet, plus the jet colour where the fittings sit above the waterline.
  • Pump arrangement. Whether massage and circulation run on separate pumps so jet pressure holds while filtration is running.
  • Control preference. One shared control system for the whole unit, or split control between swim zone and relaxation zone.

Practical rule: if the spa will be used for therapy on prescription advice, send us the required jet positions in writing with the seat reference. We form those positions into the shell; we cannot move them later without cutting it.

Section 4: LED lighting and water features

Lighting is where projects most often drift between design intent and delivered result, so pin it down in the brief with drawings and reference photographs.

  • Fitting count and position. Recessed underwater fittings along each wall, plus any perimeter or cabinet-edge lighting. Positions must clear jets, steps and handrails.
  • Colour behaviour. Fixed white, single fixed colour, or multi-colour chromotherapy with a controller. State whether the client wants colour scenes or a calm static wash.
  • Control interface. Wall panel, handheld control system, or integration with the site's lighting scenes.
  • Water features. Laminar jets, spillway or waterfall edge, deck-mounted spouts. State whether the feature is decorative only or also aerates the water.
  • Circuits and bonding. Low-voltage supply location, transformer position and equipotential bonding details from your electrical engineer.
  • Maintenance access. Whether fittings must be serviceable with the spa full or with it drained. This decides where we place the equipment bay.

Section 5: shell, cabinet and finish

Shape is not a cosmetic choice. Where the site calls for something other than a rectangle, say so early: our customizable shape outdoor spa line covers square, round, oval and curved shells with structural reinforcement balanced to each geometry, which in turn changes how the seating and jet zones can be arranged.

  • Shell. Acrylic shell colour and gloss, insulation layer, and whether a step moulded into the shell is required.
  • Cabinet. Reinforced cabinet construction, wood-look cladding, grey exterior panel or a #304 stainless steel metal frame for coastal and high-humidity sites; sealed base and moisture-free cabinet detail if the unit sits on a deck.
  • Coping and edge. Flush deck-mounted edge, raised rim, or integrated planter ledge where the design hides the cabinet.
  • Cover. Insulated cover type, lock requirement for hospitality use, and lifting hardware if staff open it daily.

Section 6: water treatment, plant and spares

Options are where the delivered specification either matches the design intent or quietly disappoints. List what is included, what is optional and what your local contractor supplies.

  • Sanitisation. Ozone appears as a standard feature on our configured platforms, with UV sterilization listed as an option; state which one your operator maintenance plan assumes.
  • Filtration. Filter pump duty, and whether sand filtration is specified for high-traffic hospitality use.
  • Heating. Heat pump or electric heating, target water temperature, and the insulation package for overnight standby.
  • Controls. Control system count, display location, and whether a remote interface is needed for a facilities team.
  • Consumables and spares. Jet cartridges, seals, lighting fittings and filters you want shipped with the unit or held locally.

If the spa is one line item in a wider fit-out, it is worth ordering it inside the same package as the surrounding poolside and outdoor products. One purchase order means one container, one loading plan and one coordination contact, instead of several suppliers arguing over who supplies the steps.

Section 7: commercial terms to settle in writing

  • Prototype and sign-off. For bespoke geometry or a new jet layout, agree whether a prototype or a shop drawing with signed jet positions comes before mass production.
  • Minimum order quantity. Relevant for resort rollouts and for private-label programmes; state the number of units per phase.
  • Packaging and container plan. Crating method, lifting points, and how many units fit one container for your freight forwarder.
  • Delivery scope. Whether you want door-to-door delivery handled with the rest of the order, or ex-works to your own forwarder.
  • Installation and handover. Who sets the shell, who connects power, who commissions water chemistry, and what the snag list is measured against.
  • Warranty and spares. What is covered, for how long, and how replacement parts reach site.

A brief template you can copy

Send these eleven lines and the quotation comes back comparable

  • Project type and location; number of units; phase dates.
  • Site photos plus access dimensions and installation method (slab, deck or recessed).
  • Target shell envelope in mm — length, width, depth.
  • Shell shape: rectangular, square, round, oval or curved.
  • Swim purpose and required continuous swim length.
  • Jet zones with seat references and jet type per zone.
  • LED fitting count, positions, colour behaviour and control method.
  • Water features wanted, with reference images.
  • Treatment and heating: ozone, UV, sand filtration, heat pump, insulation.
  • Electrical supply available on site and total load ceiling.
  • Delivery terms, installation responsibility and spares quantity.

Frequently asked questions

Can a swim spa be installed on an upper-floor terrace?

Yes, when the deck structure is confirmed for the filled weight and the access route can take the shell. Send joist spacing and load rating with your enquiry so we design the cabinet and load path around that detail rather than after it.

Can jet positions be changed after production has started?

Not without cutting and re-forming the shell. Sign off the jet map on the shop drawing before manufacture; that single confirmation prevents the most common and most costly change order.

Do you build non-rectangular shapes to a client's drawing?

Yes. Square, round, oval and curved shells are produced with reinforcement balanced to the geometry; send the architect's plan and we confirm which jet and seating layouts that shape supports.

Can lighting be tied into the villa's existing scene control?

Name the control platform in the brief. We place the transformers, route the low-voltage wiring and leave the interface point your integrator expects to find.

Configurations, dimensions and connected loads vary by model and selected options. Confirm the final specification, included equipment and electrical requirements for your chosen configuration with our team before ordering.