A sliding panel TV wall looks simple on a drawing: a screen, some joinery, and panels that slide across to hide it. In production it is one of the more coordination-heavy items in a villa or apartment fit-out, because the panel system, the screen recess, the hardware and the wall finish all have to agree before anything is cut. If you are specifying Santerson Sliding Panel TV Systems for a project, the quality of your opening brief decides how many revision rounds follow. Here is what to hand over, and in what order.

Start with the wall, not the cabinet

Panel systems are built to a space, so the first thing a manufacturer needs is an accurate record of that space. Before any design work starts, send:

  • The finished floor-to-finished ceiling height at several points along the wall, not one nominal figure — slabs and screeds vary along a run.
  • The clear width of the wall and the position of every opening, corner, radiator, switch plate or downlight that falls within the elevation.
  • How far the system can project from the wall, including any skirting, cornice or recessed niche it has to clear or wrap.
  • What is behind the wall. A stud partition, a masonry wall and a tiled bathroom-adjacent wall take different fixings and different allowable loads.

If your drawings already carry a reflected ceiling plan and an electrical layout, send them as they are rather than re-drawing them for us. Where the wall is on site now, photographs from both ends of the run plus a taped measurement photo remove most of the guesswork.

State the screen you intend to use

The recess and the mounting are sized around the display, so this cannot be left open. Please confirm:

  • Screen size and the actual panel depth with its rear connections, plus the bracket type — fixed flat, tilt, or full-motion arm that pulls out from the wall.
  • Whether the screen sits proud of the finished surface or is intended to sit flush inside a recess, and how the cables drop behind it.
  • Which devices live in the wall: soundbar, console, set-top box, media player. Each one needs a shelf, ventilation and a route for its cabling.
  • Where power, data and aerial connections will land, and whether you want them reachable after the panels are closed or hidden behind them.

A full-motion arm changes the depth of the recess materially compared with a fixed bracket, and a flush install usually means setting the bracket into the wall before the joinery goes in. Tell us which you have decided; if you have not, say so and we will design the recess to suit a standard fixed bracket and note the assumption.

Decide how the panels are meant to behave

"Sliding panels" covers several different mechanisms with different structural requirements. Be explicit about:

  • How many panels, which direction they travel, and whether they stack to one side or meet in the centre.
  • Top-hung or floor-guided running. Top-hung systems need a header that carries the load; floor-guided systems need a track detail at the finished floor level.
  • Panel travel overlap — how much of the screen you want exposed when the panels are part open, and whether you want the panels to close fully flush.
  • Handle detail: recessed pull, integrated edge profile, or a magnetic catch with no visible hardware.

Panel size has a practical limit set by the mechanism and the weight of the chosen finish. If your elevation calls for very wide panels, raise it at brief stage rather than at shop-drawing stage; that is usually where a two-panel layout becomes a three-panel layout.

Specify the finish and how it must relate to the rest of the room

Finish, layout and dimensions on these systems are specified per project, so send the same information you would send for any joinery package:

  • Veneer, lacquer, laminate or wood-effect surface, with a physical sample or a named reference rather than a colour name alone.
  • Sheen level — matte, satin or high gloss matters more than the colour once light hits a large panel area.
  • Whether the panels should match existing cabinetry in the same room. If so, send the make, model and batch of that cabinetry, and allow for the fact that timber veneer is matched by sample, not by description.
  • Any contrasting element: a stone or marble panel behind the screen, an open display niche, or integrated lighting.

If your design also includes storage beside the screen, it is usually cheaper and tidier to order the whole elevation together. Santerson Full Height Media Walls can be briefed in the same package as the sliding panels, on the same drawings and the same shipment, so the reveal lines and finishes carry across.

Say what else is in the room that the system has to coordinate with

Media walls rarely arrive alone. Note in your brief whether the same project also includes wall panelling or concealed doors on the adjacent elevations, since those elements share finishes and reveal details. Where a single material should run across doors, panelling and the TV wall without visible breaks, that has to be resolved as one detail before anything is manufactured — Wall Panel Systems ordered alongside the media wall can carry that through in one shop drawing.

Confirm the delivery and site assumptions early

Large panels are constrained by the route they take to the room, not just by the room itself. Please tell us:

  • Lift dimensions, stair widths, turning landings and any narrow hallway on the delivery route — and whether panels may need to be split into sections and assembled on site.
  • The installation sequence. Panels, screen bracket and wall finish compete for the same wall; a one-week difference in order of works changes what we deliver first.
  • Who is doing the electrical, the wall finish and the fixing on site, and whether your own installers will set our joinery or you want it installed by others.
  • The port of delivery and who receives the goods. Santerson handles freight, customs paperwork and door-to-door delivery, so we need the delivery address and the Incoterms you are working to at brief stage.

One practical note: panel materials, dimensions and mechanism requirements are confirmed project by project. Treat the specification sheet as a starting point for a conversation rather than an order form — send your elevation and your screen choice, and we will come back with shop drawings showing the actual recess, track and reveal details for your wall.

A brief checklist before you send it

  • Measured elevation of the wall, with ceiling heights at multiple points
  • Screen size, depth and bracket type decided or flagged as undecided
  • Number of panels, travel direction, top-hung or floor-guided
  • Finish reference plus a sample where a match to existing joinery is required
  • Cable, power and device layout behind and beside the screen
  • Delivery route constraints and installation sequence on site
  • Named items from the same room that must share finishes and details

Send those seven things and the first round of shop drawings is usually a confirmation rather than a negotiation. If you are specifying a media wall as part of a wider villa or apartment fit-out, Turnkey Interior Project Solutions covers design coordination through production and site handover, so the media wall is briefed once and carried through with everything else on the same schedule.