A swim spa quotation goes wrong in two places: the shell size is agreed but the plant room is not, or the equipment list arrives as a model number nobody can price. If you are specifying an outdoor swim spa for a villa terrace, a resort garden or a private wellness deck, the brief you send determines whether the reply is comparable across suppliers or unusable. Below is the information set we need to quote Outdoor Swim Spa WS-PC06CH accurately, and the questions we will ask back.
Start with the shell envelope, not the styling
Catalog dimensions for WS-PC06CH are 6000 × 3000 × 900 mm. Send us your clear opening — internal length, width and finished depth of the plinth or recess — plus how much clearance you can leave on each side for access panels. A spa that fits the footprint but cannot be reached with a spanner is not a fit.
Tell us which of these apply to your site:
- Fully recessed into a deck, semi-recessed with a partial skirt, or free-standing on a slab.
- Whether the shell sits above or below the finished floor level, and the height of the surrounding coping.
- Access route to the installation position — stair width, lift dimensions, gate width, crane or no crane.
- Slip rating and finish you want for the surrounding deck, if it is part of the same package.
Confirm what is in the standard build
The published specification for this model shows one control system, two water pumps, one filter pump, a total of 38 jets, one LED light and a total power figure of 3.25 kW, with water jets, LED lighting and ozone listed as the features shown. Treat that as the reference point your brief should answer against, not as a fixed contract: included equipment and electrical requirements are confirmed for the selected configuration before production.
| Item on the standard list | What to state in your brief |
|---|---|
| Catalog dimensions 6000 × 3000 × 900 mm | Your clear opening, coping height and access clearance |
| 1 control system | Where the controller is mounted and who operates it — owner, concierge, plant room |
| 2 water pumps, 1 filter pump | Distance from the spa to the equipment area and the route available for pipework |
| 38 jets | Which zones need jet pressure for hydrotherapy and which are for lounging |
| 1 LED light | Colour temperature or colour-changing preference, and whether lighting is part of a scene system |
| Ozone | Whether you also want UV sterilisation on top of ozone, and who supplies consumables on site |
| Total power 3.25 kW | Supply voltage, phase, breaker position and cable run length from the distribution board |
Electrical and structural information we cannot guess
Every project answers these differently, so put them in writing in the first message: supply voltage and phase at the site; whether a dedicated circuit and isolator are already installed or need to be added; earthing and bonding arrangement around the wet zone; and who signs off the electrical work. For the structure, confirm the slab loading with your engineer once water is included, and confirm waterproofing responsibility for the recess.
Options to name in the brief
Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so list what you want and let us confirm it against the WS-PC06CH build rather than assuming a catalogue line transfers across the range.
- Heat pump — state your target water temperature and how many months a year the spa is in use; that drives insulation specification more than the shell size does.
- Insulation — tell us the winter conditions on site and whether the spa is exposed or sheltered.
- Sand filtration — confirm the filter location and whether backwash drainage exists at that point.
- Steps — confirm entry side, coping height and handrail requirement.
- UV sterilisation — confirm it is required in addition to ozone, not instead of it.
If you want a shaped basin rather than the rectangular shell, that is a different conversation: our customizable shape outdoor spa line covers square, round, oval and curved configurations for gardens, terraces and leisure areas. Say so early, because shaping changes lead planning and the structural detail.
Where WS-PC06CH sits against adjacent models
Buyers often ask us to compare within the range, and the comparison is only meaningful once you know whether a swim training system is required. WS-PC06CH is configured as a jet-led hydrotherapy spa at 900 mm depth. The WS-PC06ST is a deeper, narrower shell at 5900 × 2400 × 1470 mm and lists a swim training system among its features. If the brief says "lap swimming in a small plot", we will steer you away from WS-PC06CH rather than quote it.
Browse the wider swimming pools and swim spas range to see which shells are already set up for the use case you are describing.
Commercial and logistics details that belong in the first email
The items below decide how we package and quote, so including them removes a round trip:
- Quantity — one unit for a private villa, or several units for a resort phase.
- Delivery address and whether the site is a private residence, a hotel in operation or a construction site with restricted hours.
- Incoterms you want quoted, and who handles import clearance at destination.
- Container access at the delivery point — road restrictions, gate height, unloading labour on site.
- Whether spa plant is being procured alongside other wet-area items such as bathroom sanitary fixtures, which can be consolidated into one shipment and one coordination schedule.
We handle freight by sea, air and rail with the paperwork that goes with it, and door-to-door delivery is part of our logistics service. Confirm import terms, duties and delivery scope for your specific destination in writing before you commit to a programme date.
How the brief turns into production
Our cooperation sequence is straightforward: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. The detail-confirmation stage is where the specification above gets locked — equipment list, electrical requirement, insulation and options signed off before tooling and production start. Where a project needs bespoke dimensions or finishes rather than a catalogue shell, our custom and OEM service covers design and prototyping alongside material and finish choices.
For villas and hospitality schemes where the spa is one line in a longer schedule, we coordinate it inside the same turnkey package as the joinery, furniture and finishes, so one team tracks delivery and installation across the whole scope.
Questions we will ask back — answer them up front
Is 6000 mm usable for your swimmers, or is this a hydrotherapy spa only? That single answer decides between WS-PC06CH and the ST variants.
Who does the electrical work? We specify the requirement; a licensed local contractor executes it. Naming that contractor early avoids a specification mismatch at handover.
What is the water source and drainage arrangement? Fill, drain and overflow routes need to exist before the shell is set.
Is maintenance in-house or contracted? It changes which filtration and sterilisation combination we recommend.