Project procurement & budgeting

A media wall rarely stays a single item for long. What starts as a screen and a low cabinet turns into closed storage, display niches, sliding panels, lighting and a run of matching cabinetry across several rooms. This guide explains how buyers, builders and interior designers budget and scope Santerson Integrated Media Storage when it has to coordinate with other product lines on one project — what drives the cost, how to group items into a single order, and which details to settle before you request a quotation.

Why media walls get expensive after the design is signed off

Most overrun on built-in joinery does not come from the first drawing. It comes from items that were never in the schedule: the cable route behind a recessed screen, the panel that hides a doorway next to the TV, the niche lighting the client asks for once the samples arrive. Because integrated media storage is made to fit a specific wall — layout, dimensions, materials and finish are specified per project rather than chosen from a fixed catalogue size — every late change touches the manufactured item, not just a purchase order line.

The practical fix is to treat the media wall as one node in a wider joinery package. Santerson supplies furniture and building materials together, so the same panel profile, veneer or lacquer finish can carry through wardrobes, kitchen cabinetry, tall cabinets and wall panelling. Specifying them as one package reduces duplicated sampling, keeps finishes consistent between rooms, and lets you consolidate production and shipping instead of running separate orders with separate freight costs.

Step 1 — Fix the scope by zone, not by product

Before pricing anything, break the job into zones and list what each wall has to do. A typical residential or hospitality package splits like this:

  • Media zone — the screen recess, equipment storage, ventilation for components, and the open/closed balance around it.
  • Storage zone — full-height cupboards, drawer banks and concealed doors that carry the same front as the media wall.
  • Display zone — open display niches for objects and books, with or without integrated lighting.
  • Adjacent openings — sliding panels, pocket doors or concealed doors that must align with the panel grid.
  • Secondary rooms — wardrobes, laundry joinery, bar units and sideboards repeating the same language.

This zoning is what makes a budget hold. When you can see that the display niches in the living room, the sliding panels in the bedroom and the tall cabinets in the hallway all use one finish, you can buy them together; when they are quoted separately by different trades, the finishes drift and each order carries its own freight and handling.

Step 2 — Decide open or closed before you count metres

The open-to-closed ratio changes cost more than most other choices, because closed fronts need doors, hinges, runners and a substrate that matches across the whole elevation. A useful way to specify it is to state the split per zone:

ZoneTypical mixWhat to confirm before pricing
Media wall Roughly one third open, two thirds closed Screen recess size and mounting, ventilation for equipment, cable access, remote-control line of sight
Storage run Predominantly closed with a shelf band Internal layout, drawer versus shelf split, door type (hinged, sliding, concealed)
Display niches Open, framed by closed fronts Niche depth and height, lighting position and power feed, finish of the niche back panel
Sliding panels Panel travel over the media zone Track type, number of leaves, overlap, handle or handleless edge

Where a project needs the screen itself to disappear, pair the storage wall with a system from the Media & TV Walls range such as Santerson Sliding Panel TV Systems, and keep the panel material identical to the storage fronts. Where a whole room is being fitted out, Santerson Full Height Storage Walls give you a ceiling-to-floor run that can absorb doors and panelling in the same module grid.

Step 3 — Group the multi-product order around shared finishes

The single biggest saving on a multi-product project is finish consolidation. Every additional veneer, lacquer colour or glass type adds sampling time, minimum-order pressure and a risk of visible mismatch under site lighting. Santerson's built-in ranges share panel and door families, so the following can usually be specified in one coordinated package:

  • Media storage and full-height storage walls (Integrated Storage Walls collection)
  • TV cabinets and media units, including LED-lit display units
  • Sliding panel systems — closet, partition, acoustic and textured variants
  • Paneling systems — matte lacquer, textured, glass and glossy, stone and marble looks
  • Kitchen cabinetry, tall cabinets, bar cabinets, sideboards and wardrobes in matching fronts
  • Interior doors and concealed doors aligned to the panel joints

A worked example: a three-bedroom villa with one living-room media wall, two bedroom wardrobe runs, a kitchen and a laundry. Specified as separate purchases, that is five suppliers, five sets of samples and five deliveries. Specified as one joinery package with two finishes — one veneer for feature zones, one matte lacquer for utility zones — the same fronts repeat across rooms, spares are interchangeable, and the whole order ships together.

Step 4 — Budget by line item, with a named contingency

Do not carry built-in joinery as one lump sum. Split it so that substitutions stay visible:

  1. Measured joinery by wall — each elevation priced with its own dimensions and layout.
  2. Doors, hardware and mechanisms — hinges, runners, sliding tracks, handleless profiles.
  3. Integrated lighting and electrical provisions — niche lights, cabinet lighting, transformers, conduit positions.
  4. Stone, glass and feature surfaces — anything that differs from the standard panel make-up.
  5. Packaging, freight and delivery — quoted per package, with Incoterms stated.
  6. Installation and snagging — site labour, protection, adjustment visits.

Keep a named contingency against the two line items that move most often: hardware upgrades and electrical provisions. Clients rarely change the panel colour after approval; they almost always add lighting or swap a hinged door for a sliding one once the mock-up is up.

Site reality check: made-to-measure joinery cannot absorb late dimensional changes at no cost. Fix wall lengths, floor levels and ceiling heights on site before final production drawings are released, and confirm screen and appliance dimensions in writing — recesses are cut to the equipment you name.

Step 5 — Sequence the order against the programme

Multi-product joinery fails most often on sequence, not price. A practical order of work:

  • Brief and space planning — room layouts, elevations, and the zones listed in Step 1.
  • Material and finish selection — samples approved for every surface that will appear together in one view.
  • Detail confirmation and quotation — final dimensions, hardware schedules, lighting schedules, appliance list.
  • Production with quality control — panels, carcasses and doors made to the approved drawings.
  • Packaging, freight and delivery — consolidation into as few shipments as the site can receive at once.
  • Installation, inspection and handover — fitting, adjustment, snag list closed out.

Santerson covers these stages in-house, from design coordination through logistics and door-to-door delivery to installation and after-sales support. For projects where dimensions or branding are unusual, the custom and OEM service covers bespoke design, prototyping and material selection before production starts.

A pre-order checklist

  • Measured elevations signed off, with floor levels and ceiling heights confirmed on site
  • Screen, appliance and equipment dimensions supplied in writing, including ventilation needs
  • Cable routes, power positions and lighting transformer locations shown on drawings
  • Two finishes maximum across the joinery package, with physical samples approved
  • Door and hardware schedule agreed: hinged, sliding, concealed or handleless
  • Open/closed ratio fixed per zone, not left to shop drawings
  • Delivery address, receiving hours and Incoterms stated in the quotation
  • Snagging and handover process named before installation begins

Putting it together

Budgeting a media wall properly means pricing the wall, not the product. Zone the job, settle the open/closed split, consolidate finishes across every built-in item you are buying, and price each line separately so that changes stay visible. Done that way, Santerson Mixed Open & Closed Storage and the wider Integrated Storage Walls collection become part of a single joinery package rather than an add-on discovered mid-build.

Send us your drawings

Share measured elevations, your finish preferences and the appliances you plan to recess, and we will price the media storage together with the rest of the joinery package — production, packaging, freight to site and installation coordinated as one order.