A wardrobe is one of the few pieces of joinery in a bedroom that gets opened, closed and loaded every single day for a decade or more. That is exactly why Cherry Solid Wood Wardrobes deserve a proper checklist before you commit to an order. A warm cherry tone flatters both traditional and contemporary bedrooms, but the finish is only the visible part of the decision. Below is the working checklist we use on residential wardrobe projects, in the order the questions actually come up.
1. Scope: what exactly is being supplied
Start by writing down what the quotation has to cover, because "a wardrobe" can mean anything from a freestanding carcass to a full wall of made-to-measure joinery with integrated lighting. Decide and record:
- Carcass type — freestanding unit, built-in alcove fit, or a floor-to-ceiling storage wall that also houses open display niches.
- Complete room scope — whether the same order includes matching bedside panelling, a vanity bench or an Island Walk in Wardrobes layout in an adjoining dressing room. Grouping these in one order keeps timber tone, mouldings and hardware consistent.
- What is excluded — site preparation, skirting removal, electrical work for internal lighting, and making good after installation. These exclusions are the most common source of a quotation growing after signing.
2. Timber and construction: the questions to put in writing
Solid wood is a family of constructions, not one single thing. Ask the supplier to state, in the specification sheet rather than in an email sentence:
- What is solid and what is engineered. Doors, drawer fronts and frames are commonly solid timber; large panels are often a stable substrate with a timber face to limit movement. Neither option is wrong — but you should know which you are paying for.
- Moisture content and acclimatisation of the timber before machining, and how the finish is applied (spray, number of coats, sheen level).
- Movement allowance. Solid timber expands and contracts with humidity. A competent specification describes how this is handled in panel construction, door clearances and the fixing detail to the wall.
- Hardware grade. Hinge and slide brand, load rating, whether soft-close is standard or a costed option, and what happens if a component needs replacing in five years.
3. Sizing and site measurement: who measures, and when
Made-to-measure only helps if the measurement is taken at the right moment. Confirm:
- Who takes the final dimensions — the supplier's own technician or the client's builder. If it is not the supplier, ask what happens to the order if a dimension is out.
- When the final measure happens — after floors, wall finishes and ceiling lines are complete, not off architectural drawings alone.
- What is checked at the same visit — out-of-plumb walls, floor level differences, skirting depth, door swing clearance, and the position of switches, vents and downlights that will sit inside the carcass.
4. Layout and internal fit: match it to how you actually store things
Walk through a normal week of clothing before fixing the internals. Hanging lengths, drawer counts and shelf heights are cheap to change at drawing stage and expensive to change after production.
| Storage need | What to specify on the drawing |
|---|---|
| Everyday hanging | Double-hang zones for shirts and trousers; full-height rail for dresses and coats, with the rail height written on the elevation. |
| Folded items and knitwear | Shelf spacing that suits stack depth, plus adjustable shelves so spacing can change with the seasons. |
| Socks, accessories, documents | Drawer bank at a usable height — top drawer above knee level, deep drawers reserved for bedding rather than accessories. |
| Bags, cases, display pieces | Open display niches or glass-fronted sections; decide now whether internal lighting is wired into these bays. |
| Shoes and out-of-season storage | A dedicated low zone and a top zone sized for luggage, both often forgotten in the first layout. |
5. Finish: cherry tone, sheen and ageing
Cherry is a living colour — it deepens with light exposure over the first years. Put three things on paper:
- The exact finish reference, approved from a physical sample board rather than a screen image, and kept signed by both parties.
- Sheen level — matte, satin or gloss. The same timber reads very differently at each level, and sheen also affects how fingerprints and dust show.
- Matching across other joinery. If the bedroom already has other built-in furniture in the same scheme, ask for a trial panel so tone and grain do not clash under the room's actual lighting.
6. Documentation to receive before production starts
- Dimensioned elevations of every bay, with overall height, width and depth confirmed against the final site measure.
- An internal fit schedule showing rail heights, shelf positions and drawer counts.
- A written material and finish specification, including what is solid timber and what is engineered.
- A hardware schedule with brands, load ratings and soft-close scope.
- A named approval sign-off — production should not begin until these drawings are returned signed.
7. Delivery, installation and handover
Solid timber joinery is only as good as its installation. Ask, in the same order:
- Packaging standard and how panels are protected for ocean freight and then site handling.
- Who installs — the supplier's team or a local contractor — and who supervises alignment, door adjustment and fixing to wall.
- A snag list at handover: door gaps, drawer runners, soft-close function, finish damage, and stability of tall units fixed to the wall.
- What spares are available later — replacement doors, shelf pins, handles — and how a spare is ordered years down the line.
8. Commercial terms worth reading twice
- Payment stages and what each stage releases (drawings, material purchase, shipment).
- What is fixed at order and what can vary — timber grade, finish reference, hardware model.
- The change-order process after drawings are signed, with prices stated before work proceeds.
- Warranty wording: what it covers, how long, what voids it, and who responds on site.
How a made-to-measure supplier changes this checklist
Buying cherry wardrobes from a manufacturer that also handles the fit-out work removes several handovers. SANTERSON's Custom & OEM Service covers bespoke design and prototyping, material and finish selection and project-specific sizing, so the wardrobe is built to the room rather than adjusted to it on site. The same team can coordinate Turnkey Solutions for a whole villa or apartment — joinery, other furniture and finishes in one specification, which is where consistent timber tone actually gets won or lost.
Their stated cooperation steps are straightforward: project brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up. For an overseas order, ask the same checklist questions about logistics — packaging, container loading, customs paperwork and door-to-door delivery — and get them named in the quotation rather than assumed.
Related solid wood options in the same collection
If cherry is not the right tone for the room, the Solid Wood Wardrobes collection includes close alternatives that share the same made-to-measure approach, so the checklist above transfers unchanged:
- Walnut Solid Wood Wardrobes — for darker, warmer bedroom schemes.
- Oak Solid Wood Wardrobes — a lighter tone that suits bright, minimal interiors.
- Classic Paneled Solid Wood Wardrobes — where moulded panel doors are part of the design language.
The short version of the checklist
- Scope written down, with exclusions named.
- Solid versus engineered construction stated in writing, plus hardware grade.
- Final site measure taken by the supplier, after floors and wall finishes are done.
- Internal fit planned around real storage habits, shown on dimensioned drawings.
- Finish approved from a physical sample board, matched to existing joinery.
- Drawings signed before production starts.
- Installation, snag list and spare parts agreed at handover.
- Payment stages, change orders and warranty read carefully.
Send us your drawings and floor plan
Share the bedroom dimensions, your storage requirements and the finish you are working toward. We will return dimensioned elevations, a material and finish specification and a quotation itemised by bay, so every line of this checklist has an answer before production begins.
Note: dimensions, timber construction details, hardware models and finish references vary by project and are confirmed on the approved drawing set for each order. Specifications in this article describe our standard made-to-measure process, not a fixed product datasheet.