A panelled door can carry a whole interior scheme, or it can betray the budget the moment someone runs a hand across the stiles. Because our Classic Panel Hinged Doors are made to measure, with material and finish options specified per project, almost everything that decides how the finished door reads is agreed before production starts. This note lists what a purchasing team should put in writing, and why each item changes price, lead time or the final look on site.
Start With the Panel Layout Drawing, Not a Sample
Panelled doors are defined by proportion: how many panels, how deep the mouldings run, where the mid-rail sits relative to the handle line, and whether the top panel is square or elongated. Two rooms with the same ceiling height will look completely different depending on those decisions. Ask for a dimensioned elevation of every door type in the schedule — one drawing per opening size — showing panel positions, moulding profile and the thickness of the stiles and rails.
A sample board tells you what a colour looks like; a drawing tells you whether the joinery will match the skirting, architrave and wall panelling already specified for the project. If your package also includes Standard Interior Hinged Doors for secondary rooms, put both types on the same drawing sheet so the difference between feature doors and utilitarian doors is deliberate rather than accidental.
Name the Substrate Under the Finish
"Painted door" or "oak door" is not a specification. The same profile can be produced with a solid timber frame and a engineered core, with a veneered surface over a stable substrate, or with a laminate that imitates grain at a fraction of the cost. Each behaves differently around a stairwell with fluctuating humidity, and each takes paint or stain differently along a cut edge.
- Ask which core and which face material sit behind the visible finish, in writing on the quotation line.
- Confirm how edges and any field-cut sizes are closed — factory-edge-banded, site-painted, or left to the installer.
- For painted doors, confirm whether primer and topcoat are applied in the factory or left for the decoration contractor.
- Where a grain look is required across a run of doors, ask how veneer matching is handled between leaves of the same opening.
Fix the Sheen and the Colour Reference
Colour drift between batches is the most common complaint on multi-unit work. A designer's paint name is not enough: state the colour standard, the batch or fan-deck reference, and the sheen level, since a satin panel catches light along the mouldings very differently from a matt one. The same holds for stained timber, where the clear coat changes the warmth of the tone more than the stain itself.
For villa and hospitality packages, request a signed physical approval sample for each finish in the schedule, kept on site as the reference against delivered doors. That single sheet removes most arguments at handover.
Agree Hardware Cut-outs and Ironmongery Early
Ironmongery decides the machining, and machining is where late changes become expensive. Lock case type, backset, hinge mortise positions, whether the leaf is prepared for a concealed or surface-mounted hinge, and whether an air-transfer grille or vision panel is required — all of these must be settled before the panels are cut.
Send the actual ironmongery schedule with the order: lever set model, hinge batch, lock standard, and any door closer or keeper. If hardware will be supplied locally rather than with the doors, confirm hole positions against that specific product's template, not a generic one.
Confirm Frames, Linings and Wall Build-Up Together
A door leaf is only as good as the opening it hangs in. The lining depth has to match the finished wall thickness including plasterboard, insulation, tile or stone on the opposite face — a difference of a few millimetres shows as an out-of-flush reveal. Decide with the site team whether linings and architraves ship with the doors or are made locally, and who is responsible for making good.
Where doors sit flush with the wall surface or align with panelling, that detail needs its own drawing, because the finish build-up, the shadow gap and the hinge choice all interact. Our team can coordinate these openings with other built-in joinery in the same package so the reveal lines run consistently through the property.
Set Out Sizes and Hanging Direction Per Opening
Made-to-measure means every opening is measured from the completed structure, not from architectural setting-out alone. Supply a door schedule listing width, height, thickness, hanging direction, floor finish level at the threshold, and the required undercut for ventilation where applicable. Re-measure on site after wet trades have finished, before releasing production.
Where doors must sit alongside other windows and doors in the same elevation, check that frame depths and finish colours are specified as one set. Mismatched frames in a single view are impossible to correct after installation.
Pre-production confirmation checklist
- Dimensioned elevation for every door type, with panel layout and moulding profile
- Substrate, face material and edge treatment stated on the quotation
- Colour standard, reference batch and sheen level recorded in writing
- Signed approval sample retained on site per finish
- Ironmongery schedule with lock, hinge and lever models confirmed
- Lining depth checked against finished wall build-up
- Site re-measurement signed off after wet trades
- Delivery sequence, packing labelling by room, and installation responsibility agreed
Figures, tolerances and material options vary by project and are confirmed on the approved order documents. Nothing above should be read as a fixed specification for your opening.
If you are specifying a door schedule for a villa or hospitality project, send us the openings list together with the intended finish direction. We will return shop drawings and a specification sheet for each type before anything enters production — see our services for how design coordination, production and delivery are handled as one package.