A swim spa quotation only works when the buyer and the factory are reading the same document. This guide walks through the specification fields we fill in for Outdoor Swim Spa WS-S06B, so your enquiry can move from "we need a swim spa" to a confirmed configuration, an accurate price and a clear delivery plan.

Why the Specification Comes Before the Price

Outdoor swim spas are built-to-order products. The shell size, pump count, jet layout, heating option and filtration choice all change what is manufactured, how the unit is packed and which electrical supply your site needs. A vague enquiry produces a vague quotation: two buyers asking for "a 5.8 metre spa" can easily receive different equipment lists at different prices.

We work mainly with project buyers — villa owners, developers, resort and club operators, landscape contractors and pool builders. In each case the person placing the order is rarely the person installing or wiring the unit. A written specification becomes the reference document shared between the client, their architect, the local electrician and our production team. When that document is complete, disputes during installation largely disappear.

Step 1: Fix the Envelope Before the Equipment

Start with the space, not the options list. The catalog envelope for WS-S06B is 5800 × 2200 × 1250 mm. Record three measurements on your site plan before you request anything else:

  • Clear internal length and width of the terrace, deck or enclosure where the unit will sit — including parapets, planters, handrails and doors that reduce usable space.
  • Bearing capacity of the supporting surface. A filled shell of this size is a heavy concentrated load; your structural engineer needs the wet weight figure from us, not the dry shipping weight on a packing list.
  • Access route. Overall dimensions determine whether the unit can pass through a gate, a side passage or a lift shaft, and whether a crane is needed. Tell us the access route early — it changes both the packaging plan and the site cost.

Deck height matters too. At 1250 mm deep, the relationship between the finished deck level, the water line and the entry step determines whether you need internal steps, external steps or a sunken installation. State which one you are planning in your enquiry.

Step 2: Confirm the Water System Configuration

The captured specification for WS-S06B lists the following equipment. Treat this as the catalog baseline, and mark each line "include" or "exclude" in your own enquiry so nothing is assumed:

Specification fieldCatalog value for WS-S06BWhat you must confirm
ModelWS-S06BExact model code, including any -T or -L suffix your project requires
Catalog dimensions5800 × 2200 × 1250 mmFinal site dimensions and installation method (on-deck, semi-recessed, fully recessed)
Jet total48 pcsSeating and massage zones you actually want to use, so jets are placed where bodies go
Water pump3 pcsWhich circuits the pumps serve (jets, waterfall, circulation)
Filter pump1 pcFiltration cycle and run-time plan for your usage pattern
Control system1 setPlacement of the control panel relative to the deck and plant room
LED lighting3 lights; 26 small LED lightsColour scheme, dimming control and any underwater feature lighting
Total power13.35 kWSupply voltage and phase at your site, plus the dedicated circuit size your electrician will provide
Features shownWater jets, LED lighting, Ozone, WaterfallWhich of these are in the base unit and which are costed options

Two fields deserve particular care. First, total power (13.35 kW) is a configuration-dependent figure: adding or removing a heat pump changes both the connected load and the electrical supply you must install. Send your electrician the final figure from the confirmed quotation, not a catalog number. Second, the swim training system is not listed for WS-S06B in the captured specifications. If your brief includes counter-current swimming against a jet or turbine, say so at the start of the enquiry — we will confirm whether that function belongs on this model or points you to a different configuration.

A note on catalog figures. Equipment counts and power ratings on product pages describe the catalog configuration. The specification that governs your order is the one in your confirmed quotation, signed off line by line. Where a product page and a data sheet disagree, we resolve it in writing before production starts.

Step 3: Decide the Options That Change the Build

The catalog lists options for this range — control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs a written confirmation rather than an assumption. Three of them affect the project beyond the spa itself:

  • Heat pump. Determines your running load and whether you need a dedicated circuit. Specify your climate and target water temperature so we size it correctly.
  • Insulation. Relevant for year-round use and for cold nights; it also affects how the cabinet is built and how the unit sits on an exposed terrace.
  • Sand filtration versus cartridge filtration. Changes the plant space you need beside the shell and the maintenance routine handed to your facilities team.

If your project needs a different footprint — a curved shell, a round spa, or a shape fitted to an awkward terrace edge — our customizable shape outdoor spa line covers square, round, oval and curved designs in an acrylic shell with structural reinforcement. Custom geometry is specified the same way: envelope first, then equipment.

Step 4: Compare Against Adjacent Models Before You Lock In

Specification work is easier when you know what else exists in the range. If 5800 mm is too long for your site, or 48 jets more than you need, check the swimming pools and swim spas category before committing. Buyers commonly move between three directions:

Send us the same specification sheet for two or three candidate models and the comparison becomes a straightforward equipment table instead of a guess.

Step 5: Add the Site Conditions You Would Otherwise Discover on Installation Day

The most expensive specification gaps are not about the spa. They are about what surrounds it. Include these in writing:

  • Supply voltage, phase and frequency at the site, plus the distance from the meter to the spa location.
  • Drainage arrangement and whether a drain is already near the cabinet.
  • Wind, shade and exposure conditions if the unit sits on an exposed rooftop or coastal terrace — these inform insulation and cover choices.
  • Who handles site preparation: your contractor or ours. We provide drawings and production coordination; local groundworks, electrical connection and waterproofing normally stay with the local team.
  • Delivery terms: access for the delivery vehicle, lifting requirements, and the receiving party at the site address.

A Ready-to-Use Specification Checklist

Copy this list into your enquiry. When every line is answered, we can quote without a round of clarifying questions:

  1. Project location and intended installation setting (villa terrace, rooftop, garden, clubhouse, resort).
  2. Model code — WS-S06B or the alternative you are considering.
  3. Site dimensions, access route and installation method.
  4. Equipment lines marked include/exclude against the catalog baseline above.
  5. Options required: heat pump, insulation, UV sterilisation, sand filtration, steps, control placement.
  6. Electrical supply details on site.
  7. Quantity and whether units are identical or site-specific.
  8. Delivery address, Incoterms preference and target on-site date.

Send us your WS-S06B specification sheet

Tell us the model code, your site dimensions and which equipment lines you want included. We will confirm the configuration, the final power figure for your electrician and a delivery plan for your address.

Contact our project team — enquiries are handled by the same team that coordinates villa and hospitality fit-outs, from design and production through to door-to-door delivery.