A sample door panel and a printed quotation can look convincing side by side, yet two suppliers offering an L shaped corner wardrobe may be quoting very different products. The difference usually sits in what was never written down: how the return leg is measured, what the carcass is made of, which hardware is included, and where the mitred corner has to be assembled on site. This guide shows a buyer or contractor exactly what to request, what to record and what to compare before signing.

Why Corner Units Are Harder to Compare Than Straight Ones

A straight wardrobe quotation is easy to check: run the elevation, count the doors, measure the length. A corner unit breaks that habit. The two runs meet at an angle, and the return leg carries its own depth, its own internal layout and its own access constraints. One supplier may solve the junction with a dedicated angled carcass; another may scribe two rectangular boxes together and finish the seam on site. Both drawings look acceptable. They are not the same product, and they will not age in the same way.

There is a second reason comparisons go wrong. Made-to-measure corner joinery is normally priced as an assembly of parts -- panels, doors, internal fittings, hardware, transit protection and finishing -- so a lower total may simply mean fewer parts were included. Before any price is compared, the scope has to be normalised.

Before You Ask for Samples or Quotes: Fix These Numbers

Send the same information to every supplier, otherwise you are comparing guesses. Collect:

  • The finished wall-to-wall length of each run, plus the depth of each run -- taken at floor, middle and ceiling level, because walls in older villas and apartments are rarely square along their full height.
  • The actual included angle at the junction, measured rather than assumed to be 90 degrees.
  • Ceiling height at both ends of the unit, and whether skirting, cornice, or an air-conditioning line runs through the footprint.
  • Door swing preference: hinged, sliding, or open. Corner geometry limits which of these can work, and a sliding door corner wardrobe needs clear track depth that a hinged alternative does not.
  • The internal brief in plain words: how many metres of hanging rail, how many drawers, whether long items such as dresses or ironing boards must fit, and whether the corner pocket will actually be used.
  • Finish reference -- a physical sample, a paint or laminate code, or an existing panel from another room that the joinery has to match.
Ask each supplier to confirm dimensions and selected specifications for your project in writing before pricing. A quotation built on assumed dimensions is not comparable with one built on measured ones.

What to Ask Each Supplier to Send

Request the same package from every bidder, so the comparison is a like-for-like exercise:

  • A door panel sample, full thickness, showing the substrate edge as well as the decorated face. A laminated edge tells you more about durability than a printed brochure colour.
  • A carcass cross-section or specification sheet naming board type, thickness, edge treatment and back-panel thickness. If the sheet only says "board", ask again.
  • The hardware schedule: brand and model of hinges, slides, handles or handleless profile, soft-close provision, and whether corner access fittings are included or optional.
  • An internal layout drawing at scale, with hanging heights, shelf spans and drawer positions dimensioned.
  • The assembly method for the corner: factory-assembled box, flat-pack with site assembly, or a two-box scribed solution -- plus who is responsible for making the junction line straight on site.
  • Packaging and shipping detail, if the unit is being manufactured offshore and delivered to your project.

A Six-Point Scoring Sheet You Can Fill In Yourself

Score each proposal 1-5 against the six items below. Do not look at price until all six are recorded for every bidder.

CriterionWhat good looks likeWarning sign
Dimension basisQuote cites your measured lengths, depths and the measured corner angle; deviations are noted.Round numbers that match nothing on your drawing.
Carcass specificationBoard type, thickness and edge banding named; back panel thickness stated."High quality board" with no grade or thickness.
Door and finish sampleSample supplied with edge detail; finish code recorded on the quotation.Colour photo only, or a sample that cannot be tied to the quoted item.
Hardware listBrand and model named; quantities match the drawing; soft-close stated per item."Premium hardware" as a single lump-sum line.
Corner solutionThe junction detail is drawn, and access to the dead pocket is either solved or honestly excluded.Corner shown as a plain right angle with no internal dimension.
Delivery and assembly scopePackaging, freight mode, delivery point, assembly responsibility and sequence are stated.Delivery "arranged later", or assembly left to a third party with no drawing.

Reading the Samples Themselves

Handle the samples as physical objects, not pictures. Check four things: whether the edge banding is fully wrapped with no visible seam at the corner of the sample; whether two panels from the same finish batch match under both daylight and room lighting; whether a light-reflective surface such as high gloss sliding door wardrobes shows telegraphing or orange-peel across the sample; and whether a matte surface wipes clean with a damp cloth without marking. Keep every sample bagged, labelled with the supplier name and quotation reference, and store them together so the finishes can be compared in the same light.

Comparing Proposals Line by Line

Lay the quotations side by side and reconcile them item by item rather than total against total. Common gaps that surface at this stage: one bidder pricing an integrated skirting reveal, another not; internal fittings quoted as included by one supplier and as an option by another; transit protection and spare panels missing from the cheaper bid; finishing of the exposed end panel omitted where the unit terminates into an open room. Where a bidder has excluded something, decide whether you genuinely do not need it or whether the exclusion simply moves cost to your own trades.

How One-Stop Manufacturing Changes the Comparison

When the same factory also supplies the bedroom's other joinery -- vanity units, media walls, L shaped walk in wardrobes for an adjoining dressing room, or the kitchen cabinetry on the same floor -- the comparison widens in your favour. A single manufacturer specifies one board batch, one finish code and one hardware set across all rooms, which removes the matching risk that appears when each trade sources separately. SANTERSON works this way on villa, hospitality and office projects: design and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then installation and handover, under turnkey solutions. The custom and OEM service covers bespoke sizes, internal layouts, door styles and surface finishes, so the sample you approve is the specification that goes into production.

It also changes what "delivered" means. Freight forwarding by sea, air or rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery are handled as part of the project rather than left to your forwarder -- see logistics and door-to-door delivery. After arrival, on-site installation, inspection with a snag list, warranty coverage, spare parts and ongoing maintenance sit with the same supplier under installation and after-sales support. For an L shaped corner unit, that single point of responsibility matters more than it does for a straight run: if the junction line is out, there is one party to call rather than two pointing at each other.

Questions Worth Putting in Writing to Every Bidder

  • Which dimension governs the price if the measured angle turns out to be off square -- the drawing or the site survey?
  • Is the corner carcass one box or two, and who finishes the visible junction line?
  • What is the lead time from approved sample to shipment, and what triggers the clock starting?
  • Which items are packed as spares, and which spare parts are available after handover?
  • What exactly is inspected before despatch, and can we see that record?

Answers to these five questions usually separate the proposals faster than price ever does.

Pre-Contract Checklist

  • Measured lengths, depths and corner angle sent identically to every bidder.
  • Physical door sample plus carcass cross-section received and labelled against the quotation reference.
  • Hardware named by brand and model, with quantities matching the layout drawing.
  • Corner junction detail drawn, with dead-pocket access either solved or explicitly excluded.
  • Delivery point, packaging, assembly responsibility and snag process written into the order.

Send us your measured dimensions, a finish reference and your internal brief, and we will return a specification sheet, an internal layout drawing and a sample for approval before production. Enquiries are answered by PHILLIP.

santerson@qq.com  |  Phone / WhatsApp: +86-13928214007