A double basin countertop looks like a simple line item on a bill of quantities until it lands on site: two basins, one top, a set of tapware holes, a waste route and a cabinet below that all have to agree. When procurement teams ask us about the Santerson Double Basin Countertop, the questions are almost never about style. They are about what has been recorded, what has been confirmed and what is still an assumption. This article sets out the documentation we ask buyers to put in writing before a double basin countertop enters production on a villa or residential fit-out.
Why the double basin countertop needs more paperwork than it seems
Single-basin tops fail in one direction. A double top can fail in several at once: basins too close together for comfortable use, tapware holes that clash with the cut-outs, an overflow route that does not match the waste specified locally, or a width that clears the doorway but not the lift. Because our tops are made to the dimensions of each project rather than taken from a fixed size range, every number has to come from a drawing rather than a catalogue.
That is why we treat the Santerson Double Basin Countertop as a specification, not a stock item. The product page states that finish, layout and dimensions are specified to suit each space, and it asks buyers to confirm basin spacing and countertop materials for each project. Everything below is the practical expansion of that note.
The eight items to record before production starts
| Item to document | What a good entry looks like |
|---|---|
| Overall dimensions and edge detail | Length, depth and thickness from a dimensioned drawing, plus the edge profile and whether the top returns into a wall or abuts a shower screen. |
| Basin layout and spacing | Centre-to-centre distance between basins, distance from each basin centre to the rear and side edges, and the same figures shown on the drawing you send us. |
| Basin type | Whether the basins sit under the top, sit above it, or are formed as one piece with the surface. Our Santerson Undermount Basin, Santerson Vessel Basin (Above Counter) and Integrated Basin pages each carry a different fixing and cut-out logic. |
| Surface material and finish | The material family, the specific colour or veining reference, the surface finish, and whether you want a sample before the full order is cut. See Santerson Stone & Marble Surfaces for the configurable options. |
| Tapware and accessory holes | Number of holes, hole diameter, position relative to basin centres, and whether wall-mounted spouts are used instead of deck-mounted ones. |
| Waste, overflow and trap route | Basin waste size, whether an overflow is required, trap type and the direction the pipework leaves the cabinet. These figures come from your plumber, not from us. |
| Support and the unit below | Whether the top sits on a wall-mounted or floor-standing cabinet, the load path for stone tops, and the clear height above it for mirrors and lighting. |
| Site access and handling | Lift dimensions, stair widths, turning space at the bathroom door and who carries the top once it arrives at the building. |
Matching the countertop to the vanity you are buying
Two related products cause most of the confusion in enquiries, so it is worth documenting which one your team is actually specifying. The Santerson Double Vanity is a configurable double vanity for residential bathroom projects, with made-to-measure sizing, material and finish options and project-tailored layouts. The Santerson Integrated Countertop Vanity carries a countertop that is designed as part of the unit, so its dimensions move with the cabinet rather than being ordered independently.
If your drawings show a separate top sitting on a cabinet, record the top and the cabinet as two linked line items and make sure both carry the same revision number. If they are integrated, one line item is enough, but the drawing still has to state basin positions, tapware holes and storage layout, because that page asks buyers to confirm countertop, basin and storage configuration for each project.
A short worked example
Take a principal bathroom in a villa refurbishment where the client wants two people at the bench at once. The documentation that matters is not "double vanity, long enough for two". It is: overall top width and depth from the survey drawing; basin centres measured from the finished wall face; the chosen surface with a signed-off sample; hole positions checked against the tapware the client selected; waste and overflow confirmed by the plumber; cabinet type and fixing method; and the lift size recorded on the delivery note. Most of those items arrive from your side, and all eight need one revision number so nobody is comparing an old drawing with a new order.
What we confirm back, and what stays with your team
As a One-stop Furniture and Building Materials Supplier, SANTERSON handles the making of the top and coordinates it with the rest of the bathroom package — cabinetry, ceramics, lighting and fit-out products — under one production and delivery plan. Our Custom Furniture Materials and Finishes service covers bespoke finishes and dimensions, and Furniture Logistics and Door-to-door Delivery covers freight forwarding, customs paperwork, packaging and container loading.
What stays with you is the local side: pipe sizes and trap choice, electrical work for mirrors and lighting, structural fixing to the wall, and any approval your project requires. We do not certify compliance with building or plumbing requirements in your market; that sign-off belongs to your licensed trades and certifier, and our product pages themselves ask buyers to confirm dimensions, materials, countertop fit, electrical ratings and installation requirements for each configuration.
Documentation checklist for your next enquiry
- A dimensioned drawing with revision number, not a sketch or a mood image.
- Basin centres and edge distances written on that drawing.
- Named surface material plus a sample reference you have approved.
- Tapware model and hole positions checked against the drawing.
- Waste, overflow and trap details from your plumber.
- Cabinet or support method, and clear height for mirrors and lighting.
- Access route from the kerb to the bathroom door.
Send these seven items with your enquiry and we can quote against a fixed specification instead of a range of options.
Questions procurement teams ask us most
Can the top be made to a non-standard width?
Yes. The product is configured per project, so width and depth come from your drawing rather than a fixed range. What we need is the finished dimension including any return into a wall or rebate around a screen.
Do you supply the basins with the countertop?
Both routes are possible. Basins can be specified from our Countertops & Basins range — undermount, above-counter vessel or integrated — and matched to the top at production stage. Document which type you want before quoting, because the cut-out and fixing details differ.
How are stone tops supported on site?
Support depends on the span, thickness and the cabinet or bracket below. Record the support method in your drawings and share it with us; we will confirm whether the top needs additional bearing for the size you have chosen.
What happens if the site dimensions change after production?
This is the most expensive failure in bathroom procurement, and it is a documentation problem rather than a manufacturing one. Freeze the survey dimensions before we cut, and issue a written revision if anything moves on site — our project coordination covers drawings, production coordination and on-site guidance, so an early notice keeps the change manageable.
Next step
If your team is assembling a bathroom package for a villa or residential project, send the specification sheet above with the drawing and we will confirm what is fixed, what is still open and what needs a sample before production. The full range of Bathroom Fixtures for Hotel Projects and residential bathrooms sits on this site, alongside Interior Fixtures for the rest of the fit-out.