A full height media wall looks simple on a drawing: panelling from slab to ceiling, a recess for the screen, some closed storage below, open niches to one side. In production it is anything but simple. It combines cabinetry, wall substrate, electrical routing and, often, lighting and hardware that have to arrive together and fit together on site. That is exactly why we ask buyers and project teams to settle a short list of items before the workshop starts cutting.

Our Santerson Full Height Media Walls are made-to-measure and fully custom: finish, layout and dimensions are specified per project rather than chosen from a fixed size range. The pages in the Media & TV Walls collection do not carry a standard size chart or a single material schedule, so the confirmation steps below are the ones that decide whether your drawings become a clean installation or a round of rework.

1. The wall itself: exact dimensions and what sits behind it

Send the finished floor-to-ceiling height at several points along the run, not one nominal number, plus the length of the wall and the position of doors, switches, skirting and any return corners. Full height systems are planned against the room, so a ceiling that drops or a cornice detail changes the panel layout.

Also tell us what the substrate is — masonry, drywall on studs, an existing finished wall — and whether the wall carries load. A recessed screen bay in a stud wall needs noggins and a fixing method; a solid wall needs a different one. We need this before we detail the carcass, not after.

2. The screen: size, mounting method and service position

Confirm the display you intend to install, or at least its screen size class, its VESA pattern and its weight, and whether it goes on an articulating arm, a fixed flat bracket or sits on a shelf. An articulating arm needs a solid fixing zone and clearance behind the panel; a pull-out or swivel mount also needs the surrounding cabinet openings kept clear through the whole arc of travel.

Then fix the screen centre height and the depth of the recess, so the display sits flush with the panel face rather than proud of it. If you are still choosing the TV, tell us the range you are considering and we will detail a recess that tolerates it.

3. Storage layout: what goes in, and how it opens

Media walls fail in daily use when storage is planned around looks only. List what has to be stored — consoles, soundbars, routers, board games, books, glassware, linen — and we will set shelf spans and drawer depths around that. Decide which sections are open, which are closed, and which mix both; the related Santerson Mixed Open & Closed Storage configuration is a common way to split display niches from concealed storage in one run.

Specify the opening mechanism for each bay: hinged, sliding, lift-up, or handleless push-open. Sliding fronts need track depth and an overlap allowance; tall glazed fronts need a hardware schedule that carries the door weight. If you want the screen hidden when not in use, look at Santerson Sliding Panel TV Systems and confirm the panel travel direction early, because it drives both the track detail and the electrical route.

4. Cables, sockets and devices — settle these before production

This is the item most often left too late. Send a marked-up drawing showing every socket, data point, aerial or fibre outlet, and where each device will sit. Power behind the screen needs position and access; low-voltage runs need separate containment. Confirm how many sockets you need inside the closed cabinets, because adding them later usually means a visible trunking.

If your design includes LED strips, illuminated niches or a backlit panel — see Santerson Backlit Feature Walls for that family — we need the driver location, the switching arrangement and the local supply specification. Drivers are serviceable items, so they get placed where a hand can reach them.

5. Materials, finishes and edges

Confirm the board and surface for carcass and fronts — laminate, lacquer, veneer, glass, stone or metal panel — and the edge treatment where panels meet. Because these walls are custom-built to your elevation rather than ordered from a standard catalogue item, we also ask you to approve grain direction and joint layout on the drawing; full height walls read badly when a veneer grain runs the wrong way or an edge band does not match.

Where the media wall continues into other joinery, send those elevations too. We supply kitchen cabinetry, wardrobes and Santerson Full Height Storage Walls in the same material schedule, which is how a villa or hotel living room keeps one consistent language across rooms.

What to send us before production starts

  • Measured wall dimensions at multiple points, plus ceiling and skirting details.
  • Screen size, weight, VESA pattern and mounting method, with the target centre height.
  • Room layout or Interior Design Services drawing showing the wall in context.
  • Storage inventory per bay, with opening mechanism for each section.
  • Socket, data and lighting positions, driver locations and local supply specification.
  • Approved finish schedule, grain direction and panel joint layout.
  • Substrate type and any structural or fixing constraints on site.
  • Delivery address, access route and the site stage the units must arrive at.

How confirmation runs through our process

StageWhat is confirmed here
Design and planningWall measurements, elevation layout, screen position, storage split, finish direction.
Detail confirmation and quotationHardware schedule, electrical and lighting positions, carcass construction, tolerances on site.
ProductionApproved drawings are the production reference; changes after this point are re-quoted.
Packaging and deliveryPanel identification marks, protective packing and container loading plan for the destination.
Site installation and handoverSetting-out against the finished room, snag list, connection of lighting and AV services.

If the media wall is one part of a wider fit-out — cabinetry, doors, wall panelling, flooring, lighting — it is worth letting us coordinate the package as a single procurement. Our One-stop Furniture and Building Materials Supplier service covers specification, manufacturing and quality control across those trades, so panel finishes on the media wall are matched to doors and joinery elsewhere in the same building.

A note on numbers: our Media & TV Walls listings are configurable systems, published without a fixed size chart or material table. Do not work from an assumed depth, panel thickness or load rating. Send your drawings and we will produce the technical detail for your configuration and confirm it in writing before production.

Where custom work fits into project packages

For villas and hotels, a custom media wall is rarely a stand-alone purchase; it sits inside a joinery package that has to be produced, shipped and installed as one coordinated set. Buyers working from outside China usually confirm three things at the same time: the technical detail above, the freight plan, and who sets the units out on site. We handle Furniture Logistics and Door-to-door Delivery and Furniture Installation and After-sales Support, so the same team that built the panels can be involved in getting them onto the wall.

Send your elevation drawings, screen specification and finish preferences to SANTERSON and we will return detailed production drawings for your custom full height media wall before any material is cut. Contact PHILLIP — Phone/WhatsApp +86-13928214007, email santerson@qq.com, or use the Contact page.