An open wardrobe looks simple on a drawing: uprights, rails, shelves, a warm wood surface. It is exactly that simplicity that exposes every measurement error, so the installation plan matters more for Wood Tone Open Wardrobes than it does for a closed cabinet. A door hides an out-of-plumb wall; an open run does not. The plan below is the checklist our project team works from when a villa, apartment or hotel bedroom goes from a wardrobe concept to a fitted, finished run.

Why open wardrobes need a written plan before production

Closed wardrobes forgive small errors because the carcass and the doors are assembled as one unit. Open systems put the structure, the interior layout and the wall finish all on display at once. Three things usually go wrong when there is no agreed plan:

  • Rails and shelf pins are set out from nominal dimensions, so finished clothing lengths clash with a beam, a switch or a window reveal.
  • The wood tone is approved from a small sample, then sits against flooring, a headboard and joinery that were specified by different suppliers.
  • Wall fixings are decided on site. A wall-mounted open run into plasterboard without known substrate needs blocking or a floor-standing frame, and that decision changes the build.

Our custom minimalist bedroom wardrobe work follows the same discipline: size, internal layout, door style and surface finish are confirmed as a set before anything is cut. For an open wardrobe there is simply nowhere to hide the part that was left undecided.

Section 1 — Survey record and dimensional drawing

The plan starts with a survey, not a catalogue size. Every SANTERSON wardrobe is made to measure, so the record has to be good enough for the factory and for the fitter.

  • Width, height and depth at several points on each wall — walls are rarely straight, and an open run shows the difference.
  • Floor level along the full run, with the finished floor build-up stated, so base details and skirting treatment are drawn rather than improvised.
  • Positions of sockets, switches, lights, air grilles, doors and window reveals, dimensioned from a fixed corner.
  • Wall substrate at every fixing point: masonry, solid stud wall, or plasterboard over a cavity.
  • Ceiling height and cornice or shadow-gap detail where the run reaches full height.

From that record we produce a dimensional drawing showing each bay, rail height, shelf pitch and drawer stack. The drawing is what you check on site before the crates are opened.

Section 2 — Layout brief: hanging, folding, drawers

The interior layout should be written down as a room-by-room brief, because an open wardrobe is used daily and its storage zones have to match the household or the guest profile.

ZoneWhat the plan must state
Long hangingRail height for dresses and coats, plus clearance below for shoes or a low drawer bank.
Short hangingDouble rail arrangement for shirts and folded tops, with the second rail set to suit the shorter garments rather than a standard pitch.
ShelvingShelf depth and spacing per bay; deeper shelves for knitwear, shallower for day-to-day stacks.
DrawersDrawer bank position, run type and front style. In an open layout the drawer fronts are visible furniture, not hidden carcass parts.
Display and accessoriesNiches, trays, lighting positions and any glass or metal frame elements from the wider Minimalist Open Wardrobes range.

Where a bedroom has space to walk into, the same brief applies to an Open Walk in Wardrobes layout, with circulation widths added to the drawing.

Section 3 — Finish schedule and how the wood tone is approved

Wood tone is where an open wardrobe either belongs to the room or fights it. The plan needs a finish schedule that names, for every visible surface: the board material, the surface type, the grain direction and the edge treatment.

  • State whether the tone comes from wood veneer, a melamine decorative surface or solid timber — for matching purposes, not just cost. Comparable pieces in the catalogue include Walnut Veneer Wardrobes, Wood Grain Melamine Wardrobes and Walnut Solid Wood Wardrobes.
  • Approve the tone against the flooring, skirting and any adjacent joinery under the room's actual light, not only on a sample board.
  • Record edge banding and profile details for open ends; these are seen from across the room.
  • Confirm sheen and texture, since an open surface catches side light along its whole length.

Where the flooring is part of the same package, oak engineered boards in lighter and darker tones let the wardrobe tone be matched or deliberately contrasted at specification stage rather than on site.

Section 4 — Fixing method and substrate sign-off

This is the section most often missing, and it is the one that decides whether the job closes without a return visit.

  • Wall-mounted open run: the plan states the substrate at each fixing line and the fixings for it. Where the wall cannot take the load directly, timber blocking or a steel backing frame is drawn and installed before the wall is closed up.
  • Floor-standing open run: the Freestanding Open Wardrobes option transfers load to the floor, so the plan records floor finish, base detail and anti-tip restraint to the wall.
  • Mixed configuration: a Wall Mounted Open Wardrobes upper over a standing base needs the transfer point and the notched or scribed detail drawn explicitly.
  • Framed variants: a Metal Frame Open Wardrobes build has its own fixing sequence, so the frame supplier's setting-out dimensions go into the same drawing.
  • Tolerances: scribe pieces, shadow gaps and ceiling interfaces are shown as details, with who supplies each item named.
Sign-off rule we apply: the substrate at every fixing point is confirmed in writing before production starts. A change discovered after the wall is painted becomes a joinery remake, not a fitter's problem to solve.

Section 5 — Sequencing with trades and site conditions

An open wardrobe shares its edges with painting, flooring and lighting, so the installation plan carries a sequence, not just a date.

  • Confirm which comes first: painted wall then fitted run, or run fitted then made good. Both work; they need different protection notes.
  • Fix the finished floor level before base and skirting details are cut.
  • Agree lighting positions — recessed cans above an open run, or integrated strips under shelves — with their cable routes and access point for maintenance.
  • Hold a clean, dry storage area on site for the panels; board components delivered into an active wet trade area cause avoidable damage claims.
  • Book the fitter against a room that is complete enough to work in, and state it in the programme.

Section 6 — Handover: snag list and care notes

The last page of the plan is what you check when the fitter has finished.

  • Level and plumb across the full run, checked with a straight edge along open shelf lines.
  • Drawer and door alignment where closed elements sit alongside open bays — including any Wooden Sliding Door Wardrobes that close off part of the run.
  • Fixing security: pull test at restraint points, and confirmation that anti-tip fixings are fitted.
  • Finish condition on visible edges and end panels, with any touch-up recorded rather than quietly done.
  • Care and cleaning instructions for the selected surface, plus the spare-parts list for rails, runners and brackets.

SANTERSON's installation and after-sales service covers on-site fitting, inspection with a snag list, warranty handling, spare parts and ongoing maintenance. The exact terms are set per project, so we put them in the plan rather than assume them.

A short plan template you can reuse

PageContent to complete
1Survey record: multi-point dimensions, floor level, substrate at fixing lines, services positions.
2Dimensional drawing: bays, rail heights, shelf pitch, drawer stacks, circulation where relevant.
3Finish schedule: material, surface, grain direction, edge treatment, sheen, approved sample reference.
4Fixing method: wall-mounted, freestanding or mixed; blocking details; anti-tip restraint; tolerances.
5Trade sequence and site conditions, with responsibility named for each interface.
6Snag list, handover checks, care notes, spare-parts list and after-sales terms.

Send us the survey page and a room photograph and we will return the drawing, finish schedule and quotation for your open wardrobe run, together with matching built-in furniture — including custom sizing, layout changes and OEM branding where the project needs it.