Shaker profile doors look simple, which is exactly why they cause trouble at the ordering stage. A run of shaker lacquer cabinets can contain dozens of units, each with its own width, door count and finish schedule, and every one is made to your project dimensions. This guide walks through the quantity planning and product coordination steps that keep a cabinet package consistent from drawing stage to handover, using our Lacquer Kitchen Cabinet range as the working example.

Start With Linear Metres, Not Door Counts

Most enquiries reach us with a door list taken from a rendering. That is not enough to price or produce a package accurately. We work from the wall elevations and count three things separately:

  • Linear metres of run - base units and wall units measured along the wall, including the return at corners.
  • Carcass count by type - standard widths, plus tall units, appliance housings, corner units and drawer stacks.
  • Door and drawer-front count - including panels that repeat the door profile for panelling, integrated appliances and concealed doors.

The third number is the one people forget. A shaker profile reads as a design feature only when it repeats: on the pantry door, the fridge housing panel, the oven trim and any matching wall panel in the same room. Order those panels with the cabinets rather than adding them later through a separate trade, because matching a second lacquer batch by eye is an unnecessary risk.

Break the Package Into Coordinating Groups

The Lacquer Kitchen Cabinet collection is specified per project - finish, layout and dimensions are set for each space. To keep that specification under control, we group the order into four packages on the drawing itself:

PackageWhat it containsCoordination point
Main runBase and wall units along the primary wallsShared door profile, shared lacquer schedule, one production batch
Tall and appliance zoneOven housings, fridge housing, pantry, utility tall unitsAppliance model numbers confirmed before carcass depths are fixed
Island or peninsulaDrawer stacks, breakfast bar overhang, services chaseSocket and plumbing positions set from the same approved drawing
Repeat panelsConcealed doors, panelling, matching wardrobe or laundry frontsSame profile and finish code as the kitchen, produced together

Grouping this way means one drawing revision updates every dependent item. If a wall moves by 100 mm, the affected carcass widths, worktop lengths and tile set-out change in one pass instead of three.

Decide the Finish Before You Count

Quantity planning and finish selection are not separate tasks. The lacquer schedule determines how many colour changes occur across a run, and each change adds part families to the order. Within our range you can specify different lacquer finishes for different zones - a matte lacquer field with a contrasting high sheen accent, or a two-tone scheme that splits upper and lower units. Both are common on villa kitchens, and both change the quantity sheet.

Two practical rules we apply on project orders:

  • Keep one finish to one continuous zone. Splitting a single colour across non-adjacent walls makes any slight difference between batches more visible under site lighting.
  • Count accent finishes by door, not by run. An accent wall of six doors is six parts, and they should be lacquered in the same pass as the main field so the sheen reads consistently.

Lock the Interface Items on the Same Drawing

Cabinets rarely fail on their own; they fail where they meet something else. Before production starts, we confirm these interfaces with the project team and mark them on the approved layout:

  • Worktops - edge returns, cut-outs and any upstand need the final carcass heights and depths.
  • Appliances - model numbers, hinge handing and ventilation gaps drive housing dimensions.
  • Flooring and wall finishes - skirting removal, tile set-out and floor levels affect scribe allowances.
  • Lighting and sockets - in-cabinet lighting and internal wiring need panel thickness and cable routes agreed early.

For projects where the kitchen sits inside a wider fit-out, we coordinate these interfaces across trades as part of our one-stop solution service, so the cabinetry drawing and the flooring, lighting and wall finishes drawings come from one set of dimensions rather than three.

Order to the Verified Site Survey, Not the Design Drawing

Sequence that prevents rework

Design drawing for approval - site survey and dimensional check - confirmed specification and finish schedule - production. Made-to-measure cabinetry should not be released for manufacture from design-stage dimensions alone, particularly in refurbished properties where floors, walls and ceilings are out of square.

We produce to the surveyed dimensions and record the confirmed specification - sizes, materials, finish codes and hardware - against each part on the order. On site, that sheet is what the installers work from, and it is what we check against when a package arrives.

A Quantity Checklist to Send With Your Enquiry

  • Wall elevations with linear metres, heights and obstructions marked
  • Carcass schedule by type, with standard and non-standard widths separated
  • Door and drawer-front count, including repeat panels for appliances and panelling
  • Finish schedule showing which zone carries which lacquer, with the accent doors listed individually
  • Appliance list with model numbers and hinge handing
  • Worktop, flooring and lighting interfaces noted on the same drawing
  • Site survey date, so production is released against checked dimensions

Send that set and a quotation can be issued against a complete specification instead of an estimate full of assumptions. Where profiles or finishes need adjusting to suit the space, our custom & OEM service covers bespoke door profiles and material and finish choices for each project.

Delivery, Installation and What Happens Next

Because a cabinet package arrives in coordinated groups, the packing list follows the same logic: main run, tall zone, island, repeat panels. We arrange freight and door-to-door delivery for project orders, and installation with snag inspection is available as part of the project scope, so any panel that needs adjustment on site is dealt with at handover rather than raised later.

Frequently Asked Questions

How early should cabinet quantities be fixed?

After the layout is approved but before wall finishes and flooring are fixed on site. Quantities can be quoted from design drawings, while production waits for the survey.

Can I order matching shaker fronts for a wardrobe or laundry in the same package?

Yes. Coordinating those fronts with the kitchen run keeps profile and finish consistent. A shaker panel wardrobe in a matching lacquer can be produced in the same batch as the kitchen doors.

What if two walls need different cabinet depths?

Specify each run separately on the elevations. Depth differences are normal around appliance zones and pantries; they only become a problem when one depth is assumed across the whole kitchen.

If you have drawings ready, send them with the checklist above and we will return a specification-based quotation for your shaker lacquer package.