Closet sliding panels look simple on a mood board and complicated on a site plan. Panel widths, track positions, floor levels and the openings they have to clear all have to agree before production starts, or the joinery arrives and nobody can hang it. This guide walks through the information we need from your drawings and from the site itself so that Santerson Closet Sliding Panels are made to the opening you actually have, not the one on the first revision of the plan.

What the product is, and what it is not

Closet sliding panels sit in our Sliding Panel Systems range alongside Santerson Partition Sliding Systems. Both are made-to-measure: layout, dimensions, substrate and finish are set per project rather than chosen from a fixed size grid. The panels are built for residential wall system work — bedroom robes, dressing rooms, laundry and storage walls in villas and apartment fit-outs.

Because the range is configurable, the product listing does not state one panel size or one hardware set. Confirm dimensions, substrate, finish and hardware against the specification issued for your project rather than assuming a standard size. If your architect has called out a particular track brand, soft-close gear or performance requirement, send that callout to us early; we work to your schedule where the configuration supports it.

Working rule: treat every dimension on this page as an example of how we read a drawing, not as a standard size. Production starts from your confirmed site dimensions.

The drawings that make the difference

We can price a rough idea, but we cannot manufacture one. The set of documents below is what allows a panel layout to be drawn, approved and released to the factory. Missing any one of them is the most common cause of a delay at this stage of a fit-out.

Drawing or recordWhat we take from itTypical problem if missing
Reflected ceiling and floor plan of the roomRun of the wall, adjacent openings, skirting and architrave linesPanels ordered to a wall length that changed after a services revision
Two elevations of the closet wall, both facesOverall height, panel split, handle and profile directionHandles land against a bedhead, wardrobe light or door stop
Section through the openingTrack depth, floor build-up, ceiling lining depthTrack sits proud of a finished floor that has not yet been laid
Finish schedule and paint or laminate codesPanel face material, sheen, edge detail, colour referencePanels approved in one finish, cabinetry supplied in another
Services and lighting layoutRobe lights, power points, sensors, ventilation grillesCut-outs discovered on site, panels returned for rework
Tolerance and setting-out notes from the builderWhich face is the control line, how much packer is allowedGap at one end of the run that no drawing accounts for

Reading the site before you read the plan

Drawings describe a designed condition. Sliding panels are installed in a built condition, and the two differ by millimetres that matter across a three-metre run. Before we finalise sizes, we ask the site team for a small set of checks. None of them require specialist equipment; they require someone standing in the room with a tape and a straight edge.

  • Three heights, not one. Measure the finished floor to the underside of the ceiling lining at the left end, centre and right end of the run. Record all three.
  • Two levels along the floor line. A track fixed to an unlevel screed will bind at one end. Note the fall across the opening in millimetres.
  • Plumb on both reveal faces. Where the return wall meets the closet wall, note whether it leans in or out and by how much.
  • Square at the corners. Measure both diagonals of the opening; a difference tells you the run is not square and the panel split must follow the wall, not the drawing.
  • Clearance for the travel path. Confirm nothing projects into the panel path: door handles, thermostats, skirting that runs proud, robe lighting housings.
  • Floor finish state. Say plainly whether the finished floor is laid or still to come. Track height depends on the answer.

If a site survey is not practical — an offshore project, or a developer working from a design-stage package — our Interior Design Services team can review the drawing set and mark up exactly which dimensions must be verified before release, so your site crew measures once and measures the right things.

Setting out the panel split

Once the opening is fixed, the layout follows a few practical constraints rather than preference alone:

  • Panels are sized so the leading edge stops clear of any obstruction in the travel path when fully open.
  • The overlap between adjacent panels is set from the track geometry, so a drawing that shows panels meeting edge to edge needs checking before it is approved.
  • Where a run turns a corner, the panel split follows the control line agreed with the builder, and the return panel is drawn off the measured corner rather than the nominal one.
  • Where the ceiling lining is deeper than the track, the head detail is drawn in section and signed off before the panels are cut.

Finishes, substrates and matching the rest of the joinery

Panel faces are specified per project, so they can be matched to adjacent cabinetry — kitchen fronts, wardrobe carcasses, wall panelling and doors. Send us the finish reference rather than a description: laminate or veneer code, paint colour with sheen, glass type where glazed panels are used. Descriptions such as "matte grey" match badly across suppliers; codes do not.

Our Custom & OEM Service covers bespoke finishes and textures, prototyping of a panel sample before the full run is produced, and material selection across wood, metals, engineered stone and laminates. For a villa package where panels, wardrobes and doors are all coming from us, one sample board covering all three is usually enough to close out the finish decision.

Coordination steps that prevent rework

The sequence below is how we run a sliding panel package from enquiry to handover on villa and apartment projects, the same project type shown in our published Project Cases. Scope varies case by case, so the steps are described generally rather than tied to one job.

1. Enquiry and first sizing

Send the plan, elevations and finish schedule. We return an indicative layout and pricing, with a list of dimensions still to be verified. This stage is deliberately cheap and fast; it exists to surface problems while they are still drawing problems.

2. Shop drawing for approval

After site verification we issue shop drawings: elevations of each face, the section through head and floor, the panel split with dimensions, and the hardware schedule. Your architect or builder signs this sheet. Nothing is cut until it comes back signed.

3. Sample before production

For a new finish or an unusual profile, we produce a sample panel or finish board first. Colour and sheen under site lighting decide this one; photographs are not reliable for it.

4. Production and inspection

Panels are made to the approved drawing, checked against it before packing, and packed with the track, hardware and fixing setting-out marked on the crate labels so the installer can match each panel to its position.

5. Delivery and installation

Freight is arranged by sea, air or rail with customs paperwork and door-to-door delivery through our Logistics & Door-to-Door Delivery service. On arrival, installers fit track, hang panels and adjust. Under our Installation & After-sales Support, snags are recorded and closed out with the site contractor.

Release checklist — sign these off before production starts

  • Opening measured at three heights, two floor levels, both reveals plumb, diagonals recorded
  • Floor finish confirmed as laid or pending, with build-up depth stated
  • Ceiling lining depth and head detail drawn in section
  • Panel split approved with overlap dimensions shown
  • Finish reference codes issued for every panel face and edge
  • Hardware schedule agreed: track type, hangers, soft close where specified, handle direction
  • Cut-outs for lighting, power and ventilation located on the signed drawing
  • Tolerance allowance agreed with the builder and shown on the setting-out
  • Shop drawing returned signed by the architect or builder

Where projects usually go wrong

Three patterns account for most of the rework we see on closet panel packages, and all three are cheap to avoid if caught at the drawing stage.

  • Measuring before the floor is finished. Panels arrive sized to a screed level that the final floor covering then raises by ten or fifteen millimetres. Fix: state the finish floor level on the drawing and measure after it is laid, or design the head detail so the allowance is taken at the track.
  • One dimension for a long run. A single height measurement across a three-metre wall hides both the fall and the ceiling lining variation. Fix: three heights, two levels, recorded as separate numbers.
  • Finish approved from a description. Two suppliers read "oak, light, matte" differently. Fix: codes on the shop drawing, sample board signed before release.

Related ranges in the same wall-system family are worth specifying together, so tracks, profiles and finishes stay consistent across the job: Santerson Textured Sliding Panels for feature faces, and Santerson Sliding Storage Panels where the panel carries storage behind it.

Getting a quotation that holds

A quote for closet sliding panels is only comparable with another quote if both are priced from the same verified dimensions and hardware schedule. Send us your drawing set, the site measurements listed above, and the finish codes for the surrounding joinery, and we will return a layout, a specification and a price built on those numbers. If the package also covers wardrobes, doors or cabinetry, our Turnkey Interior Project Solutions team can coordinate them as one order so that profiles, finishes and delivery dates line up.

Send your drawings and site dimensions for a made-to-measure panel layout: Contact Us. Enquiries are answered within 24 hours; business hours are Monday to Saturday, 8:00 AM–6:00 PM (GMT+8).

Dimensions, hardware and finish availability for Santerson Closet Sliding Panels are project-specific. Confirm the specification issued for your project with our team before ordering or installing.