A media wall that combines open shelving, closed cabinets and a screen in one run looks simple on a drawing. It fails on site when the quantities are wrong or when the cabinet, the panel finish and the electrical work were never coordinated. This guide explains how buyers, contractors and designers can plan quantities and coordinate products for the Santerson Storage & Display Combo, a configurable combination unit in our Media & TV Walls collection.
What the product actually is, and what it is not
The Santerson Storage & Display Combo is not a fixed catalogue item with one set of dimensions. Like the rest of our wall-system listings, it is specified per project: finish, layout and dimensions are set to suit each space, and the storage configuration is confirmed for every order. That single fact changes how you count and coordinate everything around it.
Two practical consequences follow. First, there is no "one unit per room" quantity logic — the honest unit of measure is the wall run, broken into bays. Second, because dimensions are made to order, a change in one bay affects the panels, the lighting position and the fixing detail next to it. Quantities should therefore be locked from a dimensioned drawing, not estimated from a mood board.
Step 1: Break the wall into bays before you count anything
Before quantities make sense, split the elevation into vertical bays and label each one by function. A typical residential media wall in a villa living room might be divided as follows:
| Bay type | Typical role | What you must decide before counting |
|---|---|---|
| Screen bay | Houses the display, usually with a recessed void and cable access | Screen size and mounting method, socket and signal positions, ventilation to the void |
| Closed cabinet bay | Conceals consoles, media files, games and clutter | Door type and swing or slide direction, shelf or drawer split, whether hardware is integrated |
| Open display bay | Books, objects, decorative pieces | Shelf spacing and span, load expectation, lighting position |
| Panel / finish bay | Carries the material language of the wall and can hide a door | Panel material and joint layout, whether an access panel is needed behind it |
| Transition bay | Closes the run at a corner, ceiling or floor junction | Ceiling height variation, skirting and architrave detail, packers and scribes |
Counting by bay gives you a quantity list your site team can actually check against the wall. It also exposes the two items most projects forget: transition pieces at the ends of the run, and access provision behind any closed panel that covers services.
Step 2: Set the quantities from the drawing, not the render
For a made-to-order wall system, the quantity sheet should come off a dimensioned elevation and section. For each bay record:
- Overall width and height of the bay, plus the finished depth of the carcass.
- Floor-to-floor or floor-to-ceiling height at that exact point on site, since levels vary along a wall.
- The screen opening size and its centre line, taken from the display you intend to install.
- Interior fit-out per bay: number of shelves, drawer boxes, adjustable versus fixed shelves.
- Finish area by material, so panels in different textures are counted separately.
- Openings that need an access hatch or a removable panel.
Then check the run against three site realities before you release the order: whether the wall is truly plumb and square along its whole length, where the stud or substrate fixing points sit, and how much of the wall the client actually needs to keep clear for curtains, switches or a fireplace. A bay that cannot be fixed safely should be resized on paper, not adjusted with packers on site.
How to keep spare quantity sensible
With made-to-order joinery, ordering "a bit extra" is usually the wrong instinct, because a spare bay will not fit a different opening. What is worth holding in reserve instead is finish material for the panel bays and any loose trim that may be damaged during other trades' work, plus a record of the exact finish code and hardware specification used on the first run. If a second villa level or a duplicate apartment type uses the same wall detail, order those bays together in one production batch so the grain direction and colour match.
Step 3: Coordinate the products that sit inside and beside the wall
A storage and display combination rarely arrives alone. It sits inside a wider fit-out, and coordination is where most of the value of working with a one-stop furniture and building materials supplier shows up. These are the interfaces to resolve on the same drawing set:
Adjacent wall systems and storage ranges
If the media wall continues into a full-height run, keep the module grid and finish consistent with Santerson Full Height Media Walls. Where the design calls for the screen to be hidden when not in use, review Santerson Integrated TV Panels or Santerson Sliding Panel TV Systems early, because a sliding mechanism changes the depth of the carcass and the track fixing detail. For bedrooms, studies and utility areas on the same project, Santerson Mixed Open & Closed Storage lets you repeat the open-and-closed rhythm in a different room without re-specifying finishes.
Lighting
Display niches and glass-fronted sections need their lighting decided before the carcass is built, not after. Santerson Integrated Cabinet Lighting is itself a configurable listing, so confirm the electrical specification and its compatibility with the chosen cabinet design, then agree where the driver sits and how it stays reachable for maintenance. Cable routes, socket positions and switch locations belong on the joinery drawing; an electrician working from a separate set of drawings is the most common cause of rework on these walls.
Flooring, wall finishes and doors
Fix the sequence of trades on paper: which comes first, flooring or carcass; how the panel meets the ceiling; and whether a nearby door is aligned to the wall panel. Where the design hides a doorway in the same plane as the media wall, coordinate it with our concealed and flush door options rather than leaving it to site. If you are also sourcing interior fixtures for the same building, put the flooring, wall panels and joinery on one finish schedule so colour and texture are approved together.
Step 4: Use the custom service to close gaps in the specification
Where a standard module does not fit — an arched opening, an unusual ceiling height, a client's own hardware, or a finish that must match existing joinery — our Custom & OEM Service covers bespoke design and prototyping, material and finish selection, and brand or project-specific detailing. Send the drawing, the finish reference and the interface details at enquiry stage; that is when changes are cheap. Once production has started, a bay width change ripples into panels, lighting and fixing points.
Step 5: Plan delivery, storage on site and installation as one sequence
Wall systems arrive as large panels in a tight container. Coordinate the logistics and door-to-door delivery with a site that can actually receive and store them: a dry, level staging area close to the install floor, and a clear route from lift or loading bay. Then book installation and after-sales support against a wall that is ready — first fix complete, services tested and signed off, screed and paint dry, and levels confirmed on site rather than assumed from the drawing.
A simple pre-installation checklist prevents most call-backs:
- Confirm site dimensions against the as-built joinery drawings before panels ship.
- Confirm every service position — power, data, aerial, cable routes — is installed and tested.
- Confirm the substrate and fixing method for the wall behind the system.
- Agree who protects the finished wall while other trades finish the room.
- Record the finish codes and hardware specification used, for future spare parts.
A worked quantity example you can adapt
Take a 4.2 m long living-room wall with a 2.6 m ceiling: one screen bay centred on a 75-inch display, two closed cabinet bays below and beside it, two open display bays with lighting, and one transition bay at the curtain line. Counted as bays rather than "units", that is five bays plus transition pieces, each with its own width, internal fit-out and finish area — and the screen opening, shelf count, driver position and access hatch are all separate line items to confirm. Duplicate the same detail on a second floor and you order those bays as one batch so the finishes match.
Before you place the order
Send us the dimensioned elevation and section, the room schedule, the screen and equipment list, the finish references, and the electrical layout. We will confirm dimensions, storage configuration, materials, hardware and electrical options for that specific project before production. If you would like a quotation for a media wall or a whole villa fit-out, contact our team with the drawings and we will price the bays as built.