A design brief tells your supplier what the bedroom should look like. An enquiry tells them what to build, price and produce. The distance between the two is where most wardrobe projects lose time. Here is how we convert a brief into a Solid Color Melamine Wardrobes enquiry that a factory can quote without a second round of questions.

Solid colour melamine is the finish buyers reach for when they want a flat, even surface in a bedroom or dressing room — no grain pattern to match between doors, no sheen variation under different lighting. It photographs well, it is easy to specify, and it pairs with almost any wall colour. That simplicity is exactly why enquiries go wrong: the brief says "matte grey wardrobes, floor to ceiling", and the factory is left guessing about everything that actually determines cost and lead time.

As a China-based manufacturer of furniture and interior products working on villa, hotel and apartment projects, we receive both ends of this problem every week. Some enquiries arrive with full elevations and no idea of the room; others arrive with three Pinterest images and a delivery date. This article is the checklist we use internally when our own team turns a client's brief into a production-ready enquiry.

1. Separate the look from the build

A brief is normally written in visual language: colour, mood, style, reference photographs. A quotation needs technical language: panel type, door construction, opening direction, internal fitout. The first job is translation.

Keep the visual references — they are genuinely useful — and put them beside a short technical description of each unit. For melamine wardrobes specifically, "solid colour" narrows the finish but not the product. Our Melamine Wardrobes collection alone covers several distinct surface treatments, and each one behaves differently on site:

Solid colour Matte finish Glossy finish Textured Two tone Wood grain

If your brief says "solid colour" but the reference photo shows a sheen that reflects the window, say so in the enquiry. A matte specification and a glossy specification can be quoted at different prices for the same carcass, and neither party wants to discover that after the order is placed.

2. Send dimensions as elevations, not floor area

"Three bedrooms, roughly 12 metres of wardrobe total" cannot be quoted. What a factory needs is one elevation drawing per unit, with:

  • Overall width, height and depth for each unit, in millimetres, taken from finished wall to finished wall — not structural wall.
  • Floor-to-ceiling or free-standing, and whether the ceiling is level. A sloped or boxed-in ceiling changes the top panel and the scribe detail.
  • Obstructions: skirting, architraves, light switches, air-conditioning returns, power points, doors that swing into the run.
  • Which faces are visible. A unit tucked into a recess needs one finished side; a unit in an open dressing room needs both.

If you do not have drawings yet, send photographs of each wall with a tape measure in the frame and a written list of heights. That is enough for us to produce shop drawings for your approval before anything goes into production — which is the point of Interior Design Services on a project where the drawings are not finished.

Do not round up. Wardrobes are made to measure, and a 20 mm error in an elevation becomes a visible gap on site. Measure twice at three heights and three widths, because older buildings are rarely square.

3. Specify the doors before the colour

Door type drives more of the price than the finish does, and it is usually the item a brief leaves out entirely. State for each unit:

  • Hinged or sliding. Sliding needs clearance in front of the opening; hinged needs clearance to swing. Measure both against the bed, the en-suite door and the opposite wall.
  • Door construction: flat panel, framed, or a glass-fronted alternative if part of the run is meant to read as display rather than storage.
  • Handle strategy: profile handle, integrated channel, push-open, or a metal frame. This changes both cost and the shadow line on the finished face.
  • Number of doors per unit and their order, so the joint lines land where you want them rather than where the panel width happens to force them.

Where a run turns a corner, say whether it should be an angled corner unit or two independent units meeting at 90 degrees. That single line in the enquiry removes one full round of drawings.

4. Describe how you actually use the space

Internal fitout is where a wardrobe either works or does not, and it is cheap to change on paper and expensive to change after production. Write the enquiry in terms of what goes in, not what you want installed:

  • Hanging lengths: long garments (dresses, coats, suits) versus short hanging only, and how many of each.
  • Drawers versus open shelves — and whether small items need drawers with dividers.
  • Shoe storage location, and whether the household wants an ironing or vacuum bay.
  • Anything that needs a power point inside the unit: lighting, a steamer, a dehumidifier.
  • Lighting: internal LED strips, sensor switches, or none. Specify this now; drilling finished panels later leaves visible marks.

For apartment and villa projects where several bedrooms are being furnished at once, it is worth stating the fitout per room rather than applying one layout to all of them. A guest-room wardrobe and a main-bedroom wardrobe rarely need the same internals.

5. Name the project context

The same set of wardrobes is handled differently depending on who is buying and where it lands. Tell us:

  • Project type: owner-occupied villa, apartment for sale or rent, serviced apartment, hotel.
  • Who signs off the drawings — owner, designer, builder or developer. This decides who we send shop drawings to and who has to approve them.
  • Delivery address and site access, including lift dimensions, stair width and any restriction on delivery hours. Panels that will not fit in a service lift become a very expensive problem.
  • Target installation date, working backwards from the practical-completion or handover date rather than the date you would like them.
  • Scope beyond wardrobes. If the same project also needs kitchen cabinetry, doors, wall panelling or other built-in furniture, say so at the start. Coordinating one production batch and one container is simpler than running several.

6. What a complete enquiry looks like

Here is the format we can quote fastest, and the one worth copying into your own correspondence:

ItemWhat to include
ProjectName, location, project type, who approves drawings
Unit listOne row per wardrobe: room, elevation reference, overall W×H×D in mm
DoorsHinged or sliding, construction, count, handle strategy
FinishSolid colour range and sheen (matte or glossy); reference code or sample if you have one
InternalsHanging lengths, drawer counts, shelves, lighting, power points
ConstraintsSkirting, ceiling condition, visible faces, lift and access limits
ProgrammeRequired on-site date and the milestone it feeds into
AttachmentsElevations or measured photographs, reference images, floor plan

A useful test: if a stranger could read your enquiry and produce a drawing without asking you a single question, it is ready to send.

7. What happens after you send it

With those details in place the sequence is short and predictable. You send the brief and measurements; we return shop drawings showing elevations, door joints, internals and finish references; you approve or mark up; production starts only after that approval. Drawings are approved before panels are cut, which is what keeps a made-to-measure order from becoming a site problem.

Two things to expect at this stage. First, questions — a supplier who asks nothing has not read your drawings carefully. Second, one round of value engineering is normal: door heights that need a seam, a corner unit that could be two units, a lighting detail that is cheaper moved to a different position. Decide these on paper, never on site.

For buyers coordinating wardrobes alongside the rest of an interior fit-out, our Turnkey Interior Project Solutions cover design coordination, production and delivery as one package rather than several separate orders.

Send us your brief

If you have elevations, measured photographs or simply a short description of the rooms, send them over with the target on-site date. We will come back with shop drawings and an itemised quotation for approval before anything is produced.

Start your wardrobe enquiry

SANTERSON manufactures melamine wardrobes, kitchen cabinetry and built-in furniture for villa, apartment and hospitality projects, with made-to-measure sizing, material and finish options, and layouts tailored to each space.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Contact us to discuss your project.