A materials schedule that stops at flooring, tiles and paint leaves the most expensive joinery line unpriced and unscheduled. Two tone lacquer wardrobes sit in exactly that gap: they are built-to-order cabinetry with a painted finish, so they need the same line-by-line treatment as kitchen cabinets — finish code, substrate, door construction, hardware and lead time — or they arrive late, mismatched to the wall colour, or quoted against the wrong build-up.

This guide covers what to put in the schedule entry for two tone lacquer wardrobes, how to keep the two colour zones consistent with the rest of the joinery, and where these wardrobes sit in a combined package alongside cabinetry, wall panelling and doors.

Why Wardrobes Belong in the Materials Schedule at All

Free-standing wardrobes can be bought late. Built-in wardrobes cannot. They are fixed to the structure, they meet floor and ceiling lines, and their doors have to clear skirting, cornices, lighting and door swings. Once a room is plastered and painted, the wardrobe opening is frozen.

In practice this means the wardrobe line in your schedule has to be resolved before the wet trades finish, not after. A practical test: for every room on the drawing, ask whether any storage element is fixed to the wall, floor or ceiling. If it is, it belongs in the same document as your tiles and paint, with a supplier named against it.

Grouping these items also changes pricing behaviour. A single manufacturer producing wardrobes, vanity units, panelling and doors works from one set of finish samples and one tolerance standard. Splitting them across three suppliers means three interpretations of the same "matte grey" and three sets of site measurements.

What a Complete Schedule Entry Looks Like

A one-line entry — "wardrobes, as per design" — is where variation orders start. The fields below are the ones that come back as questions in a quotation request; filling them in before you send drawings removes most of the back-and-forth.

FieldWhat to record
Location & room referenceRoom number from the drawing set, so the wardrobe line can be cross-checked against the joinery layout.
Overall dimensionsWidth, height and depth at rough-in stage, plus finished floor level. Note obstructions: bulkheads, downlights, skirting.
Door constructionHinged, sliding or open configuration. Door type changes the clearance envelope and the frame detail.
Finish, per zoneLacquer build-up and colour code for each of the two colour zones separately, not one combined description.
SubstrateBoard type behind the lacquer. Match the specification used on cabinetry in the same dwelling.
HardwareHinges, slides, handles and any internal lighting: supplier, model reference and finish.
Internal layoutShelf heights, hanging zones, drawers. Confirm at measurement stage, not concept stage.
Interface tradesWho supplies the finished floor, wall finish and ceiling line the wardrobe meets, and who trims the gap.
Sample approval dateThe date a physical lacquer panel is signed off. Production should not start before it.
Delivery & install windowSequence against painting, flooring and handover. Built-ins go in after wet trades, before final cleaning.

Handling the Two Colour Zones Without Creating a Mismatch

A two tone scheme fails in one of two ways: the two colours are specified as one item and arrive as one colour, or the darker zone is matched to a paint swatch instead of a lacquered panel and reads differently once installed. Both are specification errors, not manufacturing errors.

Specify each zone as its own line

Write the entry so the door face, the carcass edge and any recessed panel carry separate finish notes. Where a wardrobe sits next to a matching two tone lacquer cabinet run in the kitchen or laundry, use identical wording and identical codes for both lines so the manufacturer quotes from one finish standard.

Approve a panel, not a colour name

Lacquer is built up in layers and finished to either a reflective or low-sheen surface. The same pigment at different sheens reads as a different colour under site lighting. Request a sample in the actual door construction and the actual sheen, then view it on site against the wall finish before signing off.

Decide gloss level per room, not per dwelling

Reflective doors mirror whatever is opposite them. In a bedroom with a window on the door wall that can be an advantage; in a corridor with downlights it becomes glare. Where a lower sheen is wanted across the project, keep it consistent across wardrobes and cabinetry — mixing high gloss joinery with matte wardrobes in one dwelling is a deliberate design decision, not a default.

Keep adjacent finishes in the same document

Wardrobe doors are read next to matte lacquer panels, wall panelling, internal doors and skirting. If those items are specified in separate documents by different people, the tones drift. One schedule, one approver, one sample set.

Fitting Lacquer Wardrobes Into a Combined Package

For villa and apartment projects where cabinetry, joinery, panelling and doors are ordered together, the wardrobe line stops being a purchase decision and becomes a coordination decision. The practical sequence:

  • Design stage. Fix room layouts and storage requirements. Issue the joinery layout with dimensions at rough-in, and mark every interface with another trade.
  • Specification stage. Issue one finish schedule covering wardrobes, cabinetry, panelling and doors, with sample references against each line.
  • Sample stage. Order physical lacquer panels in the approved door construction. Sign off on site under real lighting.
  • Measurement stage. Confirm openings against finished floor levels and finished wall lines before production release.
  • Production and QC. Check finish, dimension and hardware against the signed sample, not against the drawing alone.
  • Delivery and installation. Sequence after painting and flooring; inspect for snags before handover.

SANTERSON works from drawings on this kind of package — wardrobes, kitchen cabinetry, wall panelling and interior doors produced to project-specific dimensions and finishes, with the design, production, logistics and installation stages coordinated as one scope. That is where a materials schedule earns its keep: one document drives measurement, production and site sequencing for everything that arrives in crates.

Common Failure Points to Check Before You Release Production

  • Finished floor level not stated. A 15 mm difference between rough-in and finished floor is an on-site trimming job.
  • One finish code for two colours. The darker zone needs its own line, sample and approval.
  • Hardware left to the fitter. Hinge load rating and slide length depend on door size and weight; specify them with the doors.
  • No sheen stated. Colour without sheen is an incomplete specification for lacquer.
  • Wardrobe measured before walls are finished. Re-measure after plaster and paint.
  • Lighting omitted from the schedule. Internal lighting needs a driver location and a cable run decided at first fix.

Dimensions, board substrate, lacquer build-up and hardware are confirmed per project against signed samples and site measurements. Treat every figure in a drawing set as provisional until the measurement stage is closed out.

Bringing It Together

Two tone lacquer wardrobes behave like any other painted joinery: they need dimensions at rough-in, a re-measure after finishes, a signed panel sample in the correct sheen, and hardware specified with the doors. Put those fields in the materials schedule alongside cabinetry, panelling and doors, and the wardrobe line stops being the item that arrives late.

Send us your joinery layout and finish schedule for a wardrobes quotation with project-specific sizing, door configuration and lacquer finish options.