Open modular shelves look simple on a drawing: uprights, shelf planes, negative space. On site they are one of the easiest items to get wrong, because the gap between what the designer intended and what the buyer ordered is usually not the shelf itself but everything agreed around it — dimensions, substrate, fixing method, lighting, tolerances and who signs off on which decision.
Our built-in furniture team produces these systems as made-to-measure work for residential wall system projects, and the projects that run smoothly share one habit: designers and buyers align on a short, explicit list of items before production starts. This article sets out that list from both sides of the table, so procurement teams, interior designers and developers can check they are specifying the same object.
SANTERSON is a China-based furniture and building materials manufacturer supplying custom built-in furniture and interior products to residential, villa and hospitality projects worldwide.
1. The reference detail is not the product
A shelving elevation on a drawing shows intent; it does not automatically show build-up. Our Open Modular Shelves, part of the Modular Shelving Systems collection, is specified per project — finish, layout and dimensions are set to suit each space rather than chosen from a fixed catalogue size. The same applies across related configurations such as Santerson Floating Modular Shelves and Santerson Metal Frame Modular Systems.
Before anything goes into a bill of quantities, both parties should confirm in writing:
- Overall width, height and depth for each bay, plus shelf spacing per elevation.
- Which surfaces are visible from which viewing angle — this drives edge treatment and substrate choice.
- Whether the system is freestanding, wall-fixed, or built into a joinery recess.
- Number of bays and whether any bay changes section mid-height.
If the designer's drawing shows one bay and the buyer's schedule counts three, production will follow whichever document was signed. That mismatch is worth five minutes at specification stage and is rarely cheap later.
2. Substrate, finish and edge detail have to be named together
"Grey shelving" is not a specification. A shelf plane carries load, shows its edges, and often sits beside a different material, so the core, the surface and the edge banding are one decision, not three.
| Decision | What the designer should state | What the buyer should confirm |
|---|---|---|
| Core / substrate | Board type and thickness for each shelf span, and the load the shelf is expected to carry | Whether that board is available in the required finish and thickness for this order |
| Surface finish | Finish family and reference — laminate, lacquer, veneer, melamine, paint — with a physical sample approved | Which finishes are offered for this product line, and whether the approved sample matches production |
| Edge detail | Matched edge banding, solid timber lipping, or a shadow gap where the shelf meets a wall | Cost difference between edge options, since matched edges are usually not free |
| Visible back panels | Whether the back is rebated, shadow-gapped or continuous | Panel thickness and how it is fixed on site |
We hold finish and material options as configurable items rather than a single fixed surface, so an approved sample is the only reliable record of what was agreed. Ask for it early: a finish chosen from a photograph on screen is a decision most people revisit.
3. Fixing method and site substrate are a shared responsibility
Open shelving fails in the same few ways regardless of design quality: fixings into a substrate that cannot take them, an out-of-plumb wall treated as true, or a shelf span too long for its thickness. Neither party can carry this alone.
- The buyer or main contractor confirms the wall construction behind the shelving — masonry, timber stud, steel stud, or existing joinery — and where blocking is needed.
- The designer states allowable tolerance on the wall face, and whether the system should be scribed, shadow-gapped or packed out.
- Both confirm floor level for any floor-to-ceiling configuration. Santerson Floor to Ceiling Systems runs the full height, so a floor level variation that is invisible in a room becomes visible at the ceiling line.
- The fixing detail — bracket, concealed hanger, cleat or frame — is agreed before the shelf planes are cut, not decided by the installer on the day.
Where the shelving is part of a wider wall build-up, sequence matters too. Plaster, paint and flooring trades need to know where the joinery starts and stops; a late change to a skirting line can shift an entire elevation.
4. Lighting inside open shelving must be specified at the same time
Integrated lighting is the item most often deferred, and it is the one that forces rework when it is not. Shelf-mounted lighting needs a cable route, a driver location, a switching point and a maintenance access — none of which can be added after the carcass is closed.
Our Santerson Integrated Lighting Systems are configured as part of the modular shelving package, with layout and dimensions set per project. The electrical side still needs local coordination: voltages, driver placement, dimming protocol and the electrician's connection point vary by site and country, so confirm those for the specific project rather than assuming a detail carries over from a previous one.
Decide three things before production:
- Fixture type and where it sits relative to the shelf edge, so glare is controlled rather than accepted.
- Where the driver lives and whether it stays accessible after installation.
- Who runs the conduit to that point — joinery or electrical contractor — recorded on the drawing.
5. Where open shelving sits inside a whole-project fit-out
Shelving rarely travels alone. In a villa or hospitality fit-out it meets cabinetry, wall panelling, doors and lighting on the same wall, and finishes have to reconcile across suppliers. Related configurations in our range include Santerson Open Modular Units for living projects and Santerson Modular Bookshelf Systems, both specified with project-specific dimensions and finishes.
As a one-stop furniture and building materials supplier, we produce shelving alongside cabinetry, panelling, doors, lighting and other interior products, which means one factory can match a veneer or lacquer across items that would otherwise be bought separately. For buyers handling furniture sourcing for Australian projects, that also reduces the number of separate finish approvals to track, although matching still has to be requested explicitly and approved on physical samples per material.
6. Custom and OEM work: what to agree before a prototype
Where open shelving needs non-standard dimensions, a bespoke finish or your own branding, our Custom & OEM Service covers custom furniture design and prototyping, bespoke finishes and textures, OEM manufacturing and flexible minimum order quantities. Designers typically want to know how far a detail can be pushed; buyers need to know what that costs in time and tooling.
Both questions are answered by the same inputs: the approved material list, the finish sample, the dimensional drawing with tolerances, and confirmation of quantities per type. Prototype scope should be written down before it is commissioned, because "one more round" is where custom projects lose weeks.
7. Logistics, delivery and installation: the specification continues past the factory
Open shelving ships as panels and components, so packaging and crate labelling decide whether installation is orderly or improvised. Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Import terms, duties, insurance and transit arrangements should be confirmed case by case for each destination — they are project decisions, not fixed service levels.
On site, our Installation & After-sales Support covers installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance. Warranty terms, response times and what is excluded vary by project, so the buyer should have the applicable terms in writing before handover rather than after a defect appears.
A pre-production sign-off list
If designers and buyers work through the items below together, most open modular shelving problems are resolved before a board is cut:
- Signed dimensional drawing per elevation, with bay count, shelf spacing and overall sizes.
- Named substrate and thickness for each span, matched to the intended load.
- Approved physical finish sample, referenced by code on the drawing.
- Edge treatment and back-panel detail recorded, not assumed.
- Wall construction, blocking locations and allowable tolerance confirmed by the contractor.
- Fixing system agreed in writing before shelf planes are fabricated.
- Lighting type, cable route, driver location and electrician's connection point drawn.
- Crate labelling matched to room and elevation names used on site.
- Applicable warranty terms and snag process confirmed before handover.
Frequently asked questions
Can open modular shelves be made to non-standard room dimensions?
Yes. These systems are produced as made-to-measure work, with layout, dimensions and finish specified for the individual space rather than selected from fixed sizes.
Should shelving be ordered together with cabinetry and panelling?
Where finishes need to match on the same wall, ordering them through one manufacturer makes that matching easier to control. The match still has to be requested explicitly and approved on physical samples.
Who is responsible for the fixing detail on site?
It is a shared decision. The manufacturer advises on the fixing system and its requirements; the contractor confirms the substrate behind the shelving and provides any blocking needed. Both should appear on the coordinated drawing.
When does integrated lighting need to be decided?
Before fabrication. Cable routes, driver positions and access openings are built into the carcass, so adding lighting afterwards normally means rebuilding components.
Next step
Send us the elevation, the room schedule and the finish direction you are working to, and we will return a specification with dimensions, material options and configuration notes for your review — so designers and buyers approve the same drawing before production begins. Start a conversation through our contact page.