A sliding panel TV wall looks simple on a drawing and complicated on site. The difference is almost always information that arrived late: the screen you intend to hang, what has to sit behind the panels, how far the wall can be built out, and who is fixing the tracks on the day. Send those details with your first enquiry and the quotation comes back usable instead of provisional.

What a Sliding Panel TV System Actually Is

In our Santerson Sliding Panel TV Systems line, the wall is a built-up system rather than a single cabinet. Panels run on tracks so they can be drawn across the screen when it is off and pushed aside when it is on; the finish, layout and dimensions are set per project. That configurability is why we cannot price one from a photograph or a room length alone.

Two other configurations in the same Media & TV Walls collection are worth naming here, because buyers often start on one page and end up needing another. Santerson Integrated TV Panels keeps the screen permanently exposed within a paneled composition. Santerson Full Height Media Walls runs joinery floor to ceiling with the screen framed in place and storage built around it. If you want concealment, sliding panels are the right starting point; if you only want a tidy surround, an integrated panel or full-height wall avoids the moving hardware altogether.

1. The Room, Measured the Way the Installer Will Measure It

Give us the width and height of the wall in a clear sketch with dimensions marked, and note the things that stop a wall unit from being built to the theoretical limit:

  • Floor-to-ceiling height at more than one point, since slab levels and screeds vary along a wall.
  • Skirting, cornices, architraves or existing finishes that must be removed or scribed around.
  • Position of doors, corners, switches, thermostats and air grilles relative to the wall.
  • The floor finish you plan to lay, and its build-up thickness — it changes every finished height.
  • Whether the wall behind is stud, brick, concrete or a lightweight partition, and whether it can take a load.

Ceiling construction matters just as much as wall construction. Overhead tracks need something solid above the finish ceiling to hang from; if the ceiling is a grid or a thin plasterboard drop, we need to know before we specify support steel or a top rail detail.

2. How Much Wall the Sliding Panels Need to Travel

This is the item most often missing from an early enquiry. Sliding panels do not disappear; they stack. So we need:

  • The clear opening you want uncovered when the TV is in use, and how far the panels must retract to either side or to one side.
  • Whether the stack can sit against a return wall, or whether it has to stop at a corner.
  • Panel count and approximate panel width — wide single panels look clean but are heavy to move and need generous track support; narrower multi-panel runs travel more easily.
  • Whether you want one continuous run of panels or separate leaves with a fixed central section behind the screen.

If the room cannot spare the stacking space, tell us the constraint instead of the wish. We will show you an alternative — a shallower panel set, a different track arrangement, or one of the other Media & TV Walls configurations.

3. The Screen and Everything That Plugs Into It

Send the make and model of the display, or at least the screen size, mounting type and approximate weight. From there we work out the recess or fixing zone, the ventilation gap, and where the bracket bears. Please also list:

  • Sources you intend to hide behind the panels: soundbar, media player, console, streaming box, TV tuner.
  • Whether a speaker set is being built into the wall, and whether acoustic covering is required over them — see our Santerson Acoustic Panels where sound treatment and paneling meet.
  • Cable routes in and out of the wall, and where the power points and data outlets currently sit.
  • Whether anything else needs to be reachable through the panels — a fireplace control, a lighting scene switch, an infrared remote path.

Infrared and remote operation is the detail people discover after handover. If the panels close over the screen and the soundbar, decide now whether you want a repeater, an RF-based system, or panels that stay partially open.

4. Finish, Storage and How the Wall Must Match the Rest of the Joinery

Panel faces can be specified in veneers, lacquer, melamine and other finishes, and the same wall can carry storage as well as a screen. Tell us what has to live in it — glassware, books, linen, bar stock — and we will set the mix of closed cabinets, open niches and shelving. A Santerson Storage & Display Combo is often the practical answer in a family living room, where the TV wall also has to hold board games and photo frames.

If the media wall is part of a wider fit-out, send the finish references or drawings for your kitchen cabinetry, wardrobes and doors so panel faces can be matched. When several openings are being made at once, that consistency is exactly where SANTERSON as a one-stop furniture and building materials supplier saves you the trouble of chasing three workshops for one colour.

5. Project Context: Quantities, Programme and Site Practicalities

For a single villa, we mainly need drawings and a delivery address. For an apartment block, hotel or a builder running several units, add:

  • Number of identical or near-identical walls, and any variation between unit types.
  • Drawings in PDF plus a dimensioned elevation for each type, with the ceiling line and floor finish level marked.
  • Your required site date, and where the units will be stored on arrival.
  • Access constraints: lift sizes, stair widths, corridor turns, parking for delivery vehicles.
  • Who is doing the on-site fixing — our team, your installer, or a local joiner we should send assembly drawings to.

Repeat units are where an early, complete information pack pays back most: the first type is confirmed and approved, then the remaining walls follow the same specification instead of restarting the conversation.

What Comes Back to You

StageWhat you receive
Enquiry reviewA list of any gaps that would change price or feasibility, rather than a guess.
Quotation and detail confirmationSpecification of panel layout, track type, finishes, storage internals and the screen zone, priced against your drawings.
ProductionManufacturing with quality checks; our Custom & OEM Service covers bespoke sizes, finishes and detailing where standard configurations do not fit.
DeliveryPackaging, container loading and door-to-door freight under our Logistics & Door-to-Door Delivery service.
Installation and after-salesAssembly guidance, on-site support where arranged, and warranty or spare-parts handling through our Installation & After-sales Support.

Panel dimensions, track hardware, panel materials and any electrical provisions are confirmed project by project against your drawings. Nothing in this article should be read as a fixed specification or a guaranteed lead time for your job.

A Short Checklist to Paste Into Your Enquiry

  • Wall elevation with width, floor-to-ceiling height and floor finish level.
  • Wall and ceiling construction type, and what is available above the finish ceiling.
  • Screen size, model, weight and mounting method; soundbar and other sources.
  • Required opening width and available stacking space for the panels.
  • Preferred panel faces and any joinery finishes to match.
  • Storage requirements: closed, open, or a combination.
  • Quantities, required site date, delivery address and access notes.
  • Who fixes on site, and whether you want installation support.

Send us your drawings. Email santerson@qq.com or call/WhatsApp +86-13928214007 (PHILLIP) with your elevations and the checklist above, and we will come back with a specification and price for your sliding panel TV system. You can also reach us through our contact page.