Closed modular units are one of those products that look simple in a photograph and become complicated the moment a quotation is requested. A run of built-in cabinetry has to fit a specific wall, carry a specific load, match a specific finish palette and arrive at a specific site window. The difference between a smooth order and an expensive rework usually comes down to what the buyer hands the supplier on day one. This guide walks through the information worth having ready before you open a conversation about Santerson Closed Modular Units, and what you can reasonably leave to the manufacturer's design team.

One sentence before you start: these units are made to measure. Dimensions, layout and finish are specified per project, so an enquiry that carries a floor plan and a room list will move far faster than one that carries only a reference photo.

Know which kind of modular unit your project actually needs

Modular living systems are not a single product. Within the same collection you will find fully closed units, open shelving units, and combinations that mix display niches with doors. Closed units hide everything behind fronts; open units do the opposite. Before you ask for anything, decide which behaviour each wall should have.

  • Closed modular units — doors conceal storage. Best where clutter is visible in daily use: linen, documents, tableware, cleaning supplies, seasonal items.
  • Open modular units — shelves and display zones. Best where objects are meant to be seen, and where you accept regular dusting as part of the maintenance plan.
  • Mixed open and closed systems — a deliberate split between display zones and doors, weighted towards closed fronts. This is the usual choice in villa living rooms because it hides the untidy things and keeps the decorative ones on show.
  • Floor-to-ceiling modular systems — full-height runs that need a different conversation about fixing to the structure, ceiling tolerances and access to the top zone.

Naming the type in your first message stops the supplier from quoting three unrelated products and gives you comparable numbers instead of three different logics.

The room data: what to measure before you write

You do not need a full set of construction drawings to start, but you do need real numbers. A tape measure and a rough sketch are enough for an initial enquiry; the design team can convert that into production drawings later.

InformationWhy it matters
Width, height and depth of the wall or recess, in millimetresSets the module grid. Depth in particular drives what you can store: shallow units take books and glassware, deeper units take cases and appliances.
Whether the run is freestanding or built-in/recessedBuilt-in work has to absorb out-of-plumb walls and uneven floors. Recessed openings need a clearance decision before manufacture, not on site.
Floor finish build-up — tile, engineered timber, carpet, screedA unit ordered against a bare slab will not suit the finished floor level. State the floor covering and its thickness, or state that the floor is already complete.
Ceiling type and any cornice, skirting or architraveFull-height units either scribe around the trim or remove it. Decide early; scribing on site costs time.
Obstacles: switches, sockets, radiators, downlights, returns, columns, doors that swing into the runThese are the most common cause of a unit that measures correctly on paper and does not install. Photograph them with a tape in frame.
Room-by-room quantity list rather than one total square metre figureLiving room, bedroom and study rarely share a configuration. A list lets the supplier quote each run properly.

If you are working on an apartment or villa refurbishment, send the architect's plan with wall lengths marked on it. If there is no plan, a hand sketch with six dimensions and four photographs of the wall is workable. What does not work is a single phrase such as "about four metres".

Decide what goes inside before you choose the front

Interior configuration is where closed modular units earn their keep, and it is the part buyers most often leave until late. Write a simple contents list per unit, then translate it into storage types:

  • Hanging zone for coats, garments or ironed linen — needs clear vertical height and a rail, not shelves.
  • Drawer stacks for small items, cutlery, documents and toiletries — deeper drawers cost more but remove the "digging at the back of a shelf" problem.
  • Adjustable shelving for mixed contents with unknown future use — pin or slot spacing you can move later.
  • Appliance housing, if a coffee machine, microwave or wine cooler sits inside. This changes depth, needs ventilation provision and affects where the power points go.
  • Integrated lighting inside closed fronts. If you want it, mention it at quotation stage: cable routes and transformer access are far cheaper to plan than to retrofit. See the integrated cabinet lighting range for the fittings used with these systems.

A practical rule: keep the lower zone as drawers or closed cupboard rather than an open plinth, and put the least-used items above eye height. Send your contents list to the supplier and ask them to challenge it — a manufacturer who has built hundreds of these runs will usually spot an inefficient zone.

Specify finish, substrate and hardware as three separate decisions

Buyers often ask for "the grey matte look" and leave everything else. That is where consistency problems appear across a project. Split the specification:

  • Front finish — matte lacquer, high gloss, acrylic, melamine, wood veneer or glass. Gloss and metallic finishes show fingerprints in heavy-use areas; matte textures are more forgiving but vary slightly between batches.
  • Body and shelf substrate — ask what the carcass is actually made of and whether it matches the front's durability expectations. A premium front on a thin, light carcass will not behave well over years of loading.
  • Hardware — hinge brand and soft-close specification, drawer runner rating, handleless or handle detail. Specify whether doors are hinged or sliding; in front of a bed or a sofa, a sliding front needs no clearance to open.

SANTERSON's custom and OEM service covers bespoke finishes, textures and branding, so if your project has a designer's colour standard or a timber species to match, send the standard itself — a paint reference, a veneer sample number or a photograph of an existing joinery run. Ask for a physical sample of the front in the chosen finish before production is confirmed; photographs on screen are not a specification.

Prepare the project and procurement context

The commercial side matters as much as the drawing. A supplier who knows the shape of your job can plan production slots, consolidate shipments and avoid splitting a delivery across two containers.

Detail to provideEffect on the quotation
Project type: private villa, apartment, hotel guest room, serviced residence, officeDrives hardware grade, finish durability and whether identical repeat units are needed.
Quantity — number of runs or rooms, not just one unitRepeat configurations share tooling and jigs; single one-off pieces price differently.
Destination country and delivery address, plus who handles customsDetermines packing method, container loading plan and paperwork. SANTERSON's logistics and door-to-door delivery service covers freight forwarding, customs documentation and shipment tracking.
Site access: lift size, stair width, floor level, parking for a truckOversized assembled modules cannot always pass a residential lift. This decides whether units ship assembled or flat-packed for site assembly.
Required on-site date and the trade sequence around youBuilt-in joinery normally comes after wet trades and painting, before soft furnishing. Give the date the unit must be installed, not the date you want to order.
Who installs — your contractor or the supplier's teamChanges what drawings, fixing details and supervision are needed. Installation and after-sales support options are described on the installation and after-sales page.
Budget band rather than no figure at allLets the supplier propose a realistic substrate and hardware combination instead of quoting one premium solution you then have to strip back.

If your project is in Australia, note that SANTERSON publishes villa and apartment project references in Sydney, Melbourne, Perth and Willoughby, and works through a defined cooperation sequence — brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. Send the destination city with your enquiry so freight can be quoted alongside the units rather than added later. Confirm current freight terms, duties and delivery scope for your specific address; published service descriptions are not a guaranteed service level.

Questions worth asking the supplier in that first email

  • Is the quotation for assembled modules or flat-packed panels, and what does site assembly require?
  • What are the maximum single-piece dimensions for the chosen finish, and where will joints appear on a long run?
  • Which substrate and edge treatment are used for the carcass, shelves and back panel?
  • Which hinge and runner brands are standard, and what is the upgrade option?
  • Can you supply a sample front and a corner detail before we confirm production?
  • What drawings do you need from us, and what shop drawings will you return for sign-off?
  • How are snags, replacement panels and spare parts handled after handover?

Ask for a written specification sheet with the quotation: dimensions, substrate, finish code, hardware model and packing method. Two quotations on the same format are easy to compare; two paragraphs of prose are not.

A short checklist before you press send

  • Room list with width, height and depth per run, in millimetres
  • Plan or sketch plus photographs of each wall, obstacles marked
  • Floor finish and finished floor level, or confirmation the floor is complete
  • Contents list translated into hanging, drawer, shelf and appliance zones
  • Front finish preference plus one alternative at a lower cost band
  • Hardware expectation: hinged or sliding, handleless or not, soft close
  • Project type, quantity, destination city and required installation date
  • Named contact on site who can answer dimension questions during production

Bring those items and the conversation starts at configuration and pricing rather than at measurement. That is normally where several weeks of a programme are won or lost.

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, operating since 2008 with custom/OEM manufacturing, door-to-door logistics, installation and after-sales support. To discuss closed modular units for a specific project, send your room list and photographs through the contact page and the design team will return a configuration proposal and quotation.