A swim spa proposal that looks complete on paper can still leave a project exposed. In commercial work — resort poolsides, hotel leisure floors, clubhouse terraces and residential amenity decks — the unit is rarely bought as a single item: it arrives inside a package of outdoor furniture, paving, lighting, sanitaryware and plant, and any gap in the swim spa line item shows up later as variation cost, programme delay or an electrical interface nobody owns. The Outdoor Swim Spa WS-S10 is one of the longer configurations in our swimming pool and swim spa range, so it is a useful example to walk through. Below is the checklist we use to read a proposal for this model, and the questions that decide whether a supplier's offer can actually be built, delivered and commissioned on site.
1. Read the specification as a build, not as a model number
The first thing to check is whether the proposal names the configuration rather than just repeating the catalogue title. The published catalogue entry for this unit gives overall dimensions of 10000 × 2200 × 1420 mm, a control system of one set, two water pumps, one filter pump, a jet total of 76 pcs, LED lighting (one fitting plus 40 small LED lights) and a total power figure of 7.65 kW, with water jets, LED lighting and ozone listed as the shown features.
Treat those numbers as the starting point for a conversation, not as the order itself. Catalogue pages describe a reference configuration; what your project receives depends on the specification agreed at quotation stage. A proposal that only says "WS-S10 as per catalogue" has not yet defined what you are buying.
Two details in the published data deserve particular attention when you compare offers:
- Swim training system. For this model the captured specification does not list a swim training system, while closely related models in the same range — such as the -T variants — do show one. If your programme assumes counter-current swimming for lap training or guest fitness use, ask explicitly whether the propulsion unit is included, and at what flow rate, or which model in the range delivers it.
- Total power. The catalogue figure covers the standard equipment set. It does not automatically include a heat pump, UV sterilisation or other options added later. Electrical load is the item most often revised after order, so get the connected load of the quoted configuration in writing before the electrical contractor designs the supply.
2. Check what is included and what is optional
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each of these changes price, plant space and the services required, and each is a place where two proposals can look identical while describing different buildings.
| Item | Why it matters commercially | What the proposal should state |
|---|---|---|
| Heat pump | Determines running cost and whether water temperature can hold in shoulder seasons; affects plant noise and location | Make/model, heating capacity, noise level, clearance needed for service access |
| Insulation | Drives overnight heat loss on outdoor installations in cooler climates | Shell and lid specification, insulation method, cover type |
| Filtration (filter pump, sand filtration) | Sets cleaning interval and water clarity under guest load | Filtration turnover rate, media volume, maintenance access |
| Ozone / UV sterilisation | Chemical dosing burden in a shared or semi-public setting | Which system is quoted, consumable life, replacement parts source |
| Steps and access | Accessibility, safety and how the unit ties into paving levels | Step type, handrail options, finished floor level relationship |
| Control system | Who operates the unit day to day, and what the operator can actually see | Controller location, language, scheduling, fault display |
Availability and compatibility of options vary by model. Confirm the selected configuration before ordering rather than assuming a catalogue option fits every unit in the range.
3. Verify the site interface before you sign
A ten-metre-long vessel at 10000 × 2200 × 1420 mm is a structural and logistics decision, not just a product selection. Three interfaces cause most of the rework on projects like this:
Structure and substrate
Confirm whether the unit sits on a prepared slab, a raised deck or a recessed pit, and who prepares it. The proposal should state the bearing requirement and the tolerance for level, because an outdoor swim spa will not forgive a substrate that has settled out of plane after installation.
Electrical supply
The electrical scope boundary must be named: who runs the supply to the unit, who provides isolation and protection, and which drawings carry that information. On multi-supplier projects this is the single most common gap — the swim spa supplier assumes the M&E contractor has provided a compliant supply at the agreed point, and the M&E contractor has not seen the final configuration.
Water, drainage and commissioning
Fill, drain and overflow routes need to be shown on coordinated drawings, along with who commissions the unit and hands it over with an operating manual. For a hotel or resort, handover should include a short operator briefing so that daily duties — filter cycles, chemical dosing, winter routine — are assigned to named staff before opening.
4. Judge the supplier by delivery reality, not brochure language
For an imported package, the evaluation shifts from features to logistics. Our turnkey solutions work covers design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then installation and handover — and the same sequence applies when a swim spa is one line in a wider procurement. Questions worth putting to any bidder:
- How is the unit packaged and loaded, and what lifting or crane access does the site need on arrival day?
- Which Incoterms are quoted, and what sits outside them — duty, clearance, inland transport, last-mile handling?
- What documentation comes with the shipment: commercial invoice, packing list, certificate of origin, wiring diagram, operating manual?
- Who supervises installation and how are snags recorded and closed out at handover?
- Which parts are stocked as spares, and what is the route for a replacement pump, jet or controller later in life?
A supplier who answers these with specifics — container type, loading plan, named documents, defined handover steps — has almost certainly delivered this kind of unit before. A supplier who answers with assurances has not.
5. Compare like for like across the range
Before settling on one model, check whether the length and equipment set actually match how the space will be used. A longer unit such as Outdoor Swim Spa WS-S12-T adds overall length and, in its published specification, a swim training system; a bespoke form is also possible where the plan calls for something other than a straight run — see our customizable shape outdoor spa for square, round, oval and curved layouts. Where several sites are being fitted out to one design, ask the supplier to price the same specification across models so that the difference you see is length and equipment, not drafting.
On hospitality and villa projects we supply swim spas alongside outdoor furniture, paving-adjacent seating, lighting and sanitaryware. Coordinating those items with one supplier shortens the interface list: levels, finishes and material palettes are agreed once instead of being reconciled between several trade packages.
A practical test. Take two proposals for this model and lay the line items side by side. If both say the same thing about included pumps, jet count, filtration, sterilisation, insulation, steps, heating and electrical load — and both state what is excluded — you are comparing prices. If they do not, you are comparing different products, and the lower figure may simply be a thinner specification.
6. What a good WS-S10 proposal contains
- A named configuration with dimensions, pumps, jet count, lighting, sterilisation and control system itemised line by line
- A clear statement on whether a swim training system is included or excluded
- Connected load for the quoted build, plus any option that changes it
- Site preparation scope: substrate, levels, lifting access, supply point, drainage routes
- Packaging, container plan, Incoterms and documentation list
- Installation supervision, snag process and handover with operating documentation
- Spare-parts route and the contact who answers after opening
Next step
Send us the layout, the intended use — guest leisure, fitness training or hydrotherapy — and your electrical constraints. We will confirm which configuration in the range fits, itemise what is included and excluded, and put the swim spa into the same delivery and installation programme as the rest of the package. Enquiries are handled through our contact page.