A quotation for two tone melamine cabinets usually arrives as a spreadsheet of line items and a unit price. Two proposals that look identical on paper can produce kitchens that differ in appearance, durability and final cost. The difference is almost always sitting in the details nobody asked about. The checklist below is what we ask buyers and project managers to verify before a cabinet order is confirmed — the same checks we apply to our own drawings.

Why two-tone cabinetry makes the proposal harder to read

A single-colour kitchen can be quoted as one repeated door style across the whole run. A two-tone scheme splits that run into at least two groups — typically a darker, more wear-exposed lower section and a lighter upper section — and each group needs its own door panel, edge treatment and colour reference. That is what makes these custom kitchen cabinets easier to mis-specify than a monochrome set.

Three practical consequences follow:

  • Two colour references instead of one. A description such as "grey and white" is not a specification. The proposal should carry a board supplier's decorative paper or laminate reference, or a physical sample that both sides sign off.
  • More transitions to detail. Where the dark run meets the light run, someone has decided how the panels join, whether the carcass colour continues, and how the top and bottom of each block are finished. Those decisions belong on the drawing, not in a conversation.
  • Higher risk of visible variation. Two panels in the same finish can still look different if they come from different production batches or if one is lit directly by a window. A serious proposal states how colour and grain matching will be handled across the run.

What a complete proposal should contain

Before comparing prices, compare documents. A manufacturer's proposal for made-to-measure cabinetry should include each of the following. If any item is missing, ask for it in writing before treating the price as final.

Item in the proposalWhat to check
Layout drawings per wallCabinet widths and heights against your measured dimensions; appliance positions; clearances at corners and openings.
Panel scheduleWhich doors, sides, plinths and shelves belong to the dark group and which to the light group — no "mixed" or unspecified lines.
Colour and texture referencesA named reference for each tone, plus a note on whether the wood-grain option is directional (grain all running the same way).
Carcass and interior finishColour and thickness of the cabinet boxes, back panels and drawer bottoms, which are often quoted one grade below the doors.
Hardware scheduleHinge and slide brand or model, soft-close or push-to-open, handleless profile or handle type, and what is included versus optional.
Appliance and integration notesVentilation gaps, cut-out sizes and whether the appliance panels match the door finish.
Inclusions and exclusionsWorktop, splashback, plinth, trims, lighting, packing and delivery — stated explicitly in one direction or the other.
Packaging and shipment termsPallet configuration, container loading plan, and the agreed delivery point rather than a vague "door to door".

Reading the price line by line

Per-metre or per-set pricing hides differences. Rebuild both quotations on the same basis: cost per cabinet, grouped by wall, with hardware listed separately. Then look for three common gaps.

1. Where the two tones stop

Some proposals price only the door fronts in two colours and carry every visible side panel, return and open shelf in a single tone. That is a legitimate choice, but it changes the look of an island or an open end panel. Confirm which surfaces are in each tone, and ask for a render of any panel a person will see from more than one angle.

2. What "melamine" means on that sheet

Melamine-faced board covers a wide field — smooth solid colours, textured surfaces, wood-grain decors and high-gloss variants behave differently under kitchen lighting and under daily cleaning. Within our own catalogue these are separate collections: matte melamine, textured melamine and high gloss melamine are different products with different surface behaviour. A proposal that says only "melamine door, colour TBC" has not yet specified the cabinet.

3. Hardware and internal fittings

Handleless kitchens look simple and are less forgiving in execution: the profile, the pull-out clearance behind a handleless drawer front and the quality of the slides all affect how the finished run operates. Ask whether soft-close hinges and full-extension slides are standard or an upgrade, and whether internal fittings — pantry racking, cutlery organisation, waste bins, appliance towers — are priced in or quoted later as variations.

Questions worth sending before you sign

  • Which physical sample will the delivered panels be matched to, and who signs it?
  • Are all panels for one apartment or one villa produced in a single batch to keep tone consistent?
  • What is the lead time from signed drawings to shipment, and what triggers the clock — deposit, drawing approval or both?
  • How are replacements handled if a panel is damaged in transit, and on what timeline?
  • Which items are excluded from the price, and which become variations once on site?
  • Who produces the final as-built dimensions, and when is the site re-measure taken?

Lead times, batch policy and replacement terms vary by project and should be confirmed in writing for each order rather than assumed from a previous one.

How SANTERSON handles a two-tone cabinet enquiry

Our Two Tone Melamine Cabinets sit in the melamine kitchen cabinet collection and are made to measure: finish, layout and dimensions are specified to the space rather than selected from fixed sizes. The same applies across the range — wood grain melamine fronts paired with a matte solid tone is one of the combinations we produce most often for residential kitchens and serviced apartment fit-outs.

For project buyers, cabinetry is rarely an isolated purchase. It has to agree with the flooring, wall finishes, lighting and appliances already on the schedule. As a one-stop furniture and building materials supplier, we produce and coordinate these together, so one drawing set governs the cabinet tones and the adjacent finishes instead of two suppliers interpreting them separately.

The workflow follows the stages on our service pages: layout and material consultation, quotation with confirmed details, then production, packing and logistics and door-to-door delivery, with installation support and after-sales follow-up. Where a scheme needs non-standard dimensions, an alternative panel material or a private-label package, that falls under our custom and OEM service rather than a surcharge on a standard item.

A short pre-signing checklist

  • Drawings match measured dimensions, including corners, openings and appliance cut-outs.
  • Both tones are named with a reference, and the surfaces covered by each tone are listed.
  • Carcass, interior and back-panel finishes are stated, not left at the supplier's discretion.
  • Hardware is identified by type and feature, with upgrades priced separately.
  • Worktop, splashback, trims, lighting and packing are either included or explicitly excluded.
  • A signed physical sample exists, and replacement terms are written into the order.

If you would like a proposal reviewed against this checklist — yours or ours — send the drawings and the panel schedule to our team. We will mark up what is missing before any price is treated as comparable.