A glass sliding door wardrobe looks simple on a drawing. Two panels, a track, a mirror or tinted surface. The reason two identical-looking wardrobes behave so differently after handover is almost never the glass itself — it is everything that was decided before production started. If you are specifying built-in storage for villas, apartments or hotel guest rooms, this checklist covers what to lock down with your manufacturer before a single panel is cut.

1. The opening, not the nominal size

Sliding wardrobe doors travel in front of the carcass, so their size is dictated by the opening plus the track system, not by the internal box. Before production confirm:

  • Floor-to-ceiling height at three points (left, centre, right). Slab and screed levels vary; a 15 mm difference across a wall is common on site.
  • Wall plumb and square. Out-of-plumb walls change the overlap between panel and carcass, and that shows up as light gaps at the top or bottom.
  • The finished floor level. A wardrobe drawn against structural slab will be short once tiling, screed or flooring is laid.
  • Ceiling details: cornices, sprinkler heads, air-conditioning diffusers, curtain boxes and lighting tracks that a full-height panel must clear or stop against.
  • Adjacent obstructions — door reveals, switch plates, headboard positions, skirting boards that the carcass has to scribe around.

Our wardrobe listings are made-to-measure: sizing, layout and finish are specified per project, so we work from your measured opening rather than a standard module. Confirm dimensions and selected specifications for each project before order release.

2. Track system and how the panels carry their weight

Glass is heavy, and sliding hardware fails long before glass does when it is under-rated. Ask your supplier to state which of these applies:

QuestionWhy it matters before production
Hanging (top-loaded) or bottom-rolling?Top-hung systems put load into the head rail and require a solid fixing substrate above the opening. Bottom-rolling systems need a floor track that stays clean and level.
Rated load per panel and per hanger?Glass panel weight plus handle and frame weight must sit inside the hardware rating, with margin for repeated daily use in guest rooms.
Panel thickness the hardware acceptsTrack channels, clamps and guides are specified for a glass thickness. Change the glass build later and the hardware no longer matches.
Number of tracks and panel overlapTwo-panel and three-panel systems need different track widths; this determines how much of the opening is actually reachable when doors are open.
Dampers, soft-close or catch profileSpecify whether panels stop softly, latch, or simply coast — guest-room acoustics usually decide this.

Hardware is normally fixed at order stage because the carcass head rail and floor track are built to suit it. Changing systems after production means rebuilding the frame.

3. Glass build, safety treatment and finish

Decide the glass construction on paper, in writing, before ordering. The options we supply across our wardrobe ranges include clear, frosted, bronze, smoked and ribbed surfaces, plus aluminium-framed glass doors where a slim metal profile is preferred. For each door specify:

  • Toughened / temperedsafety treatment and whether the supplier marks or certifies it.
  • Laminatedif the specification calls for interlayer glass — relevant where fragmentation control is required, such as guest rooms and public areas.
  • Total thickness and whether the panel is single glazing or a laminated/insulated build.
  • Tint and reflectivity: bronze and smoked glass reduce see-through but darken interior contents; mirror panels enlarge a room visually yet show fingerprints.
  • Surface pattern — frosted, ribbed or clear — and which face the finish sits on, so cleaning happens on the smooth side.
  • Edge treatment: polished arrises, seamed edges, and whether cut-outs for handles are pre-finished at the factory.

Where local rules govern glazing in a specific building type, confirm the required safety standard with your project consultant. We supply to the specified build; we do not substitute a glazing specification on our own judgement.

4. Internal layout and what the doors actually reveal

Sliding doors only expose part of the opening at a time, so internal zoning must be planned around that. Confirm:

  • Hanging zones: single or double rail heights, and whether a pull-down rail is needed for tall rooms.
  • Drawer and shelf positions relative to panel overlap — a drawer on slides cannot extend where a fixed panel stands in front of it.
  • Brightwork: shoe plinths, valet rods, ironing board housings, jewellery trays, belt and tie racks.
  • Integrated lighting: door-triggered, motion-sensor or always-on, plus where the transformer and wiring access sit.
  • Specialist items: laundry hamper columns, safe positions for hotel rooms, TV or mirror panels that must remain operable.

Send a marked-up elevation with every dimension and item position. Our design and production coordination work starts from those drawings, so ambiguity in the layout is the most common source of change orders later.

5. Carcass material, finish and edge detail

The visible door and the hidden box are specified separately but must be agreed together. Confirm board type and thickness for carcass, doors and shelves; surface finish (melamine, lacquer, acrylic, veneer); edge banding material and colour match; and whether the carcass is finished all round or only at faces — relevant in open-plan villas where a wardrobe reads as a room divider. Back panel thickness and fixing method affect how square the unit stays in transit and on site.

Our custom minimalist bedroom wardrobes are built with flat panels, clean lines and an optional handleless front for exactly this kind of unified look, with sizes, internal layouts, door styles and surface finishes set per project.

6. Interface with the building fabric

Most snags on custom wardrobes are interface problems, not manufacturing problems. Before production confirm:

  • Whether the unit is installed before or after wall finishes and flooring — this changes the measured size and the scribing allowance.
  • Cornice, shadow gap or flush-wall detail at the top, and who supplies the closing panel.
  • Skirting treatment: scribed, cut-away, or a designed shadow gap.
  • Fixing substrate. Plasterboard alone may not carry a head rail; blocking or steel backing must be built into the wall before finishes.
  • Clearance for adjoining doors and drawers so nothing fouls when both are open.

7. Logistics, packaging and site sequence

Glass panels and pre-assembled carcasses ship badly if planned late. Confirm panel maximum size against lift, stair and doorway dimensions at the destination; how glass is crated and which faces are protected; whether the wardrobe ships flat-packed or assembled; and delivery timing relative to wet trades, so carcasses are not stored on a damp site. For projects outside China we handle freight forwarding, export paperwork and door-to-door delivery, and coordinate shipment timing with your programme.

8. Documentation to hold before releasing the order

Release only when you have these in writing:

  • Signed dimension sheet from site measurements, with finished floor and ceiling levels stated.
  • Approved elevations showing door split, overlap direction and internal zoning.
  • Glass specification: type, thickness, tint, safety treatment, edge detail.
  • Hardware schedule: system, load rating, panel thickness compatibility, closing action.
  • Finish schedule for carcass, doors, edges and handles, with samples signed off.
  • Interface notes: fixings, scribing allowance, cornice or shadow gap, lighting power points.
  • Packaging and delivery plan sized to the site access route.

A practical test: if your manufacturer cannot quote a load rating for the sliding hardware, or will not confirm glass thickness and safety treatment in writing, the specification is not ready for production yet. Those two items drive every downstream decision.

How this fits into a wider fit-out

Wardrobes rarely sit alone. Kitchens, vanities, doors, wall panelling and flooring all share the same measurement discipline and finish schedule, which is why coordinating them with one supplier reduces interface risk. Our glass sliding door wardrobes sit within a wider built-in furniture range that also covers hinged, corner and walk-in configurations — including glass walk-in wardrobes where floor space allows a fully enclosed dressing room. As a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, we cover design coordination, custom production and delivery through to installation support.