A bidet line in a project bill of quantities looks small until the fixtures arrive on site and do not match the waste outlets, the tiles or the rest of the suite. If your quotation covers the Floor Standing Bidet 1038F, Ceramic Bidet Basin for Bathroom Hygiene, use the checklist below to confirm that every line item in the supplier's quote describes the same thing your drawings assume — before you sign.
Start with the model code, not the description
Descriptions drift between suppliers; codes do not. Ask for the exact model reference (1038F), the full product name as it appears on the packing list and invoice, and a matching product page or drawing number. Then check that the same code appears in the specification schedule, the purchase order and the shipping documents. One letter of difference is enough to change the mounting method, the dimensions or the waste connection.
Confirm how the bidet is mounted and supported
The 1038F is a freestanding ceramic bidet fixed to the wall with back support. That single sentence has real consequences for your quote and for site preparation, so make sure the quotation states:
- the mounting method (floor-standing, back-to-wall fixing) and whether fixing brackets, anchors or seals are included or supplied separately;
- what the substrate behind the fixing point needs to be, and who prepares it — your builder or the sanitary ware package;
- whether the trap and any connection set are quoted with the pan or carried in a separate plumbing line.
A quote that lists only "bidet, ceramic" leaves all three questions open, and each one becomes a variation order later.
Check rough-in, waste and water supply against your drawings
This is where bathroom quotations most often fail. Ask the supplier to state the waste outlet type and the rough-in dimension in writing, and send that line back to your plumbing consultant for confirmation against the as-built setting-out. Our own 1038 series data sheet for the Two Piece Washdown Toilet 1038A records dual options — an 180 mm wall outlet P-trap and a 250 mm floor outlet S-trap — which is exactly why trap type and rough-in must be confirmed per item rather than assumed for the whole series. For the bidet itself, treat dimensions, trap position and rough-in as figures to verify against the final technical sheet for the batch you are buying.
Verify the suite pairing and finish
The 1038F is designed to sit alongside the matching 1038 series water closet so the shapes, seat heights and glaze read as one set. Check that the quote groups the bidet with the intended toilet — for example the wall-hung Wall Hung Toilet 1038W, Rimless Ceramic Wall Mounted WC or the two-piece 1038A — and that the glaze colour and surface are named for every ceramic item across the bathroom, including basins. Where a project mixes mounting types on purpose, say so in the line description: Wall Hung Bidet 1004F, Modern Ceramic Wall Mount Bidet is a different product with a different fixing detail and a different floor line, and it should be quoted as its own item.
Read the surface and maintenance wording
Ceramic quality shows up in the glaze. The 1038F is described with a high-quality glossy glaze that repels dirt and limescale, which matters in hard-water regions and in hotel housekeeping routines. Ask what surface treatment is quoted, whether any additional coating is offered as an option and priced separately, and what cleaning agents the supplier's own maintenance note recommends or rules out. Vague phrases such as "easy clean" are not a specification.
Compare quantity, packaging and delivery terms line by line
For project volumes, the commercial lines matter as much as the technical ones:
| Item to check | What a complete quote states |
|---|---|
| Quantity and unit of measure | Pieces per line, plus spares for guest-room repetition if required |
| Packaging | Ceramic-safe packing with corner protection, carton marks matching the room schedule |
| Delivery terms | Named Incoterms, port or site address, and who handles customs clearance |
| Container plan | Loading list showing fragile items separated from cabinetry and panels |
| Inspection point | Pre-shipment inspection with photographs of packed ceramic ware |
| Spare parts | Availability of connection sets and fixings for later maintenance |
Where the same order also covers cabinetry, wall panels, lighting or flooring, ask for one consolidated shipment plan rather than several independent ones. Coordinating sanitary ware with interior fixtures and finishes in a single schedule is how you avoid tiles being installed before the waste positions are confirmed.
Check what happens after the goods leave the factory
A quotation should not stop at FOB. Confirm who provides the installation and snagging stage, what warranty period is written for the ceramic body and separately for seals and fittings, and how replacement parts are ordered when one room in a hotel programme is damaged in use. If your project needs custom sizing, finish or branding, make sure the quote separates standard product pricing from tooling or prototyping cost, and states the minimum order quantity for each.
A short pre-signature checklist
- Model code identical in quote, drawings, purchase order and packing list
- Mounting method and fixing accessories named per line item
- Trap type and rough-in confirmed in writing by your services engineer
- Suite pairing (1038 series toilet) and glaze colour stated for all ceramics
- Glaze and maintenance requirements specified, not implied
- Packaging, Incoterms, container plan and inspection point defined
- Warranty scope, spare parts route and installation responsibility written down
Send us the specification, not just the model number. As a China-based manufacturer and one-stop supplier of furniture and building materials, SANTERSON quotes bathroom ceramics alongside the rest of the fit-out — cabinetry, wall and ceiling finishes, lighting and flooring — under one project package. Share your setting-out drawings and we will return a quotation with mounting method, trap arrangement and suite pairing stated line by line.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com | Enquiry page