An arched pair of doors can carry the whole character of a villa entrance or a hotel suite threshold — which is exactly why it fails so expensively when it reaches site half-finished. The design intent sits in the curve; the commercial risk sits in the gap between what the designer drew and what the buyer instructed the factory to build. Below is the alignment checklist we work through with architects, interior studios and procurement teams on Santerson Arched French Doors, so that both sides sign off the same thing before production starts.

Why arched doors expose misalignment faster than rectangular ones

A straight door leaves a factory some latitude: nominal heights, standard jambs, tolerances absorbed on site. An arch removes that latitude. The curve of the head is fixed the moment the frame is cut, and it has to agree with the opening the builder formed, the glazing or panel layout the designer drew, and the floor finish level that will be laid after the frame is set. When the designer specifies a beautiful elevation and the buyer orders "arched double doors, as shown", nobody has actually agreed on the geometry.

Santerson Arched French Doors sits in our French Doors collection and is made for residential door packages where dimensions, layout and finish are set per project. That configurability is the point — but it only pays off if design and procurement confirm the same variables at the same time.

Six items designers and buyers must lock before order

Item to align onWhat the designer should giveWhat the buyer should confirm back
Opening geometryClear opening width, total height to the crown of the arch, springing height (where the curve starts), and whether the arch is a true semicircle or a segmental curveWhether the finished opening on site matches the drawing after plaster, screed and floor build-up are accounted for
Leaf layout and hardwareNumber of leaves, active and fixed leaves, hinge side, mullion positions, handle height relative to the archWhether the chosen ironmongery is supplied by the project or by us, and who owns the interface
Material and finishFrame material, panel or glazing pattern, glass type where glazed, colour or veneer referenceThat the finish sample has been approved in writing, not just selected from a brochure image
Threshold and floor levelsFinished floor level on both sides, any transition strip, door swing clearance over the final floorThe sequence: frame set before or after flooring, and who protects the frame during the remaining works
Sightlines and adjacent workHow the arch reads against skirting, cornice, wall panelling and any matching joinery in the same roomWhether related items — Modern Slim Frame French Doors elsewhere on the floor, or Decorative Interior Doors — are being ordered to the same jamb profile and finish batch
Site access and handlingLargest single assembled unit the design allows, versus what the loading dock, lift and stairwell can takeWhether doors ship assembled or flat-packed with site assembly by our installers or the local contractor

The three conversations that are usually skipped

1. Who measured, and when. Shop drawings drawn from architectural openings are estimates. A made-to-measure order needs a site survey after the opening is formed, or a written agreement on who carries the risk if the two differ. We ask buyers to confirm dimensions and selected specifications for each project before production release for precisely this reason.

2. What "arched" means in the schedule. A door schedule that says only "arched double doors" can be priced against several different frames. The drawing should state the curve type, the springing height and the crown height; the quotation should repeat those three numbers. If they match on paper, they will match on site.

3. Where the arch meets the rest of the package. Arched doors rarely stand alone. In villa and hospitality work they sit beside panelling, concealed doors, wardrobes and cabinetry from the same fit-out. Ordering doors as an isolated line item is how profile lines, reveal depths and veneer tones end up mismatched. Specifying them inside a single turnkey package keeps the joinery language consistent across the floor.

How our process closes the gap

For projects in Australia and elsewhere, the same sequence applies from first enquiry to handover:

  • Design coordination. Our interior design service covers space planning, layouts and 3D visualisations, plus drawing and production coordination with on-site guidance, so the arch is resolved on paper before it is cut.
  • Custom and OEM specification. Made-to-measure sizing, bespoke finishes, material choices and prototyping are handled in-house; flexible minimum order quantities mean a single villa package can be produced as one order.
  • Production and quality control. Shop drawings are issued for sign-off against the confirmed dimensions and finish references above.
  • Logistics. Freight by sea, air or rail with customs paperwork, packaging and container loading planned around the assembled unit sizes agreed in step one.
  • Installation and after-sales. On-site installation, inspection of snags, spare parts and maintenance support, coordinated with the local contractor.

Practical rule of thumb: if a quotation for an arched door does not show crown height, springing height, curve type, jamb profile and finish reference, it is not yet comparable with another supplier's price. Ask for those five lines before you award.

A short pre-order checklist

  • Site-surveyed dimensions, signed by the builder and the designer
  • Curve type and springing height stated on both drawing and quotation
  • Approved physical finish sample referenced in the order
  • Hardware supply and responsibility assigned to one party
  • Finished floor levels confirmed, with the flooring sequence agreed
  • Delivery format (assembled or flat-packed) matched to site access
  • Adjacent joinery and doors ordered against the same profile and finish schedule

Send us the elevation drawing and the door schedule, and we will return shop drawings for your sign-off with those dimensions restated in writing — so the designer's curve and the buyer's order are provably the same object before a single frame is machined. Enquiries about Santerson Arched French Doors and the wider Windows and Doors range can go to our project team.

Product configurations, materials, dimensions and finish options are confirmed per project; specifications in this article describe configurable scope rather than fixed standard sizes.