An outdoor swim spa sits between two worlds: it is a piece of wet-area equipment with pumps, jets and electrical loads, and it is also a landscape feature on a terrace, deck or pool surround. That dual nature is exactly where project procurement briefs go wrong. The design team specifies the shell, the contractor prices the civil works, and the mechanical package is left until late in the programme. This note walks through how to write a complete, unambiguous brief for the Outdoor Swim Spa WS-S08CT, so quotations are comparable and nothing critical is discovered on site.

Start with the model reference, not a description

The single most useful line in your brief is the exact catalogue model. "A swim spa about 8 metres long" produces three different quotations from three suppliers. "WS-S08CT" produces one that you can check against the published specification. For this model the catalogue lists an overall envelope of 8000 × 2400 × 1420 mm, which is the figure your architect should be drawing into the deck layout, setbacks and access route before anything else is decided.

Write the model number in the bill of quantities, in the tender drawings and in every subsequent email. Model suffixes in this range are not decorative — variants in the same 8-metre family differ in seating layout, step arrangement and equipment set, so a shortened reference is enough to change what arrives on site.

Record the published specification as the baseline

Copy the catalogue figures into the brief verbatim and mark them as the baseline against which any deviation must be priced. For WS-S08CT, the site lists the following:

ItemCatalogue figure
ModelWS-S08CT
Catalogue dimensions8000 × 2400 × 1420 mm
Jet total35 pcs
Swim training system1 set
Water pump1 pcs
Filter pump1 pc
Control system1 set
LED lights6
Total power8.35 kW
Features shownWater jets, temperature setting, LED lighting, ozone, swim training system

Two of these lines do the most work in a brief. The total power figure of 8.35 kW is what your electrical engineer needs for the sub-board, protective device and cable run — and it must be confirmed against the final configuration, because optional equipment changes the load. The jet count and pump set tell the mechanical contractor what filtration duty to expect, and they are also the basis for comparing one quotation with another.

Treat catalogue numbers as a starting point rather than a finished specification. Our product pages state that included equipment and electrical requirements should be confirmed for the selected configuration. Put that confirmation in writing as a line item in the brief, with a named responsible party, so it is not left to the site team.

List the options you want priced, and those you do not

The catalogue offers configurable additions for this range: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so ask the supplier to confirm which of these apply to WS-S08CT rather than assuming the full list is available.

Each option has a downstream consequence you should anticipate in the brief:

  • Heat pump and insulation — determines whether the spa can hold temperature economically through the cooler part of the year, and adds to the electrical load that already starts at 8.35 kW.
  • Sand filtration or upgraded filter pump — changes plant footprint, plumbing runs and the maintenance access you need around the shell.
  • UV sterilisation alongside the listed ozone system — affects your chemical dosing regime and the handover documentation for whoever maintains the spa.
  • Steps — affects entry position, deck level and how the 1420 mm shell height is reached from the finished surface.

State clearly whether each option is included in the base price or shown as a priced alternative. A quotation that bundles everything and one that prices the bare shell are not comparable, and this is where budget overruns usually appear.

Specify the site interface, because the supplier cannot guess it

Most disputes on swim spa projects are about the boundary between scopes. Define it in the brief:

  • Support structure — whether the spa sits on a slab, a reinforced deck or a plinth, and who designs and builds it. The 8000 × 2400 mm footprint has to be level and correctly loaded.
  • Drainage and overflow — where discharge water goes during draining, backwash and maintenance.
  • Electrical route — isolation location, cable sizing and run, and who supplies the sub-board that carries the confirmed load.
  • Access for delivery — the delivered shell is a large rigid item; note gate widths, crane or lifting requirements, and the path from the vehicle to the terrace.
  • Finishes around the shell — decking, coping and any surround are normally contractor scope, and they determine how the 1420 mm height reads in plan.

Set out delivery, installation and handover expectations

SANTERSON operates as a furniture and building materials manufacturer and one-stop project supplier, with services that run from design consultation and material selection through production, freight and door-to-door delivery to installation support and after-sales. For a swim spa package the practical brief should ask for the same structure in writing:

  • Packaging and container loading details, plus the shipping documents your customs agent will need.
  • A named coordination contact through production and shipment.
  • The scope of on-site installation support, what is inspected at handover, and how defects are recorded.
  • Warranty terms in writing, spare-parts availability for pumps, jets, controls and lighting, and the maintenance schedule you receive with the handover pack.

Ask for these as stated commitments in the contract rather than marketing language in a brochure. Freight terms, transit time, duties and local installer availability differ by destination and should be confirmed for your specific project location.

Consider the spa as part of the wider outdoor package

On villa and hospitality projects the swim spa is rarely ordered alone. Sun loungers, cabana daybeds, pergolas and outdoor dining sets are specified around it, and one supplier handling the shell together with the outdoor furniture collection means a single coordination point for finishes, delivery windows and site access. Where the brief groups these scopes, note which items are stocked models and which go through custom or OEM production, since prototyping and material selection add time to the latter.

A short checklist before you issue the brief

Confirm before issuing for quotation

  • The exact model reference — WS-S08CT — appears in the bill of quantities and drawings.
  • Catalogue dimensions 8000 × 2400 × 1420 mm are drawn, with clearance for maintenance access.
  • Total power is confirmed against the final equipment selection, not just the baseline 8.35 kW.
  • Every option — heat pump, insulation, sand filtration, UV, steps — is marked included or excluded.
  • The scope boundary for support structure, drainage, electrical and surrounds is named and assigned.
  • Delivery route and lifting requirements are recorded on the drawing.
  • Warranty, spare parts and maintenance handover are contractual line items.

Send us your brief

If you have drawings or a bill of quantities for an outdoor swim spa package, send them through our contact page. We will confirm the WS-S08CT configuration, the applicable options and the electrical requirements for your project before pricing.