An open wardrobe looks simple on a rendering: a few hanging rails, some shelving, a clean shadow gap. On site it is one of the fastest ways to start an argument, because there is no door to hide anything behind. When designers and buyers specify Minimalist Open Wardrobes together — before drawings are frozen and before the order is placed — most of the rework, variation costs and site surprises disappear.

The gap between a beautiful detail drawing and a wardrobe that works in daily use is almost always an alignment problem, not a manufacturing problem. Below is the checklist we ask design teams and procurement teams to sign off on for villa and apartment bedroom projects.

1. Agree what "minimalist" actually means for this project

Two people can draw the same word very differently. A designer may mean a frameless carcass with concealed fixings and no visible hardware; a buyer may read it as the least expensive open unit available. Settle the vocabulary in writing at the brief stage, and record it against reference images from both sides.

  • Visible structure: exposed metal frame, timber carcass, or a wall-hung system with no perimeter frame? Frameless work needs solid fixing details into the wall behind it.
  • Edges and joints: mitred edges, edge-banded panels or reveal lines. Edge treatment is what reads as "clean" at close range, and it is usually decided too late.
  • Hardware visibility: hinges, rails, brackets and drawer runners can be specified as concealed, colour-matched or deliberately expressed.
  • Colour and grain direction: for wood-grain laminates, state the grain direction on each elevation, not just the colour code.

Our Wood Tone Open Wardrobes line is usually specified where warmth matters and the grain direction has to run consistently across a long run of units.

2. Fix the storage programme before the carcass dimensions

Open wardrobes are organised by hanging heights and shelf spacing, so the internal layout is the design. Ask the client or operator how the space is actually used, then set the rail heights and shelf pitches from that answer rather than from a default catalogue module.

DecisionDesigner's inputBuyer's input
Hanging zones (short / long / double)Elevations, proportion, sight lines from the bedRoom count, garment mix, user profile per unit
Shelf pitch and depthStack heights, display intent, lighting above shelvesStandardised spacing across units for pricing and spares
Drawers, baskets, traysFront profile, handle-free or integrated pullRunner quality, service access, replacement parts
Full-height vs. partialCeiling reveal, cornice and skirting treatmentFloor-to-ceiling tolerance, slab level variation

Where a project needs the same storage logic repeated across many bedrooms, standardising the shelf pitch and rail heights is worth more than any single aesthetic decision — it stabilises pricing, shortens production, and makes later replacement panels straightforward. Our Open Modular Wardrobes are specified this way on multi-unit residential work.

3. Confirm the substrate, finish and edge banding together

Because everything is on display, material choice in an open wardrobe carries more visual risk than in a closed one. A board specification is not just a colour name; it is the core, the surface, the edge band and the adhesive, all matched.

  • Core board: confirm the grade and moisture class for the room — a bedroom against an external wall behaves differently from an internal partition.
  • Surface: laminate, melamine, lacquer or veneer. Matte surfaces hide fingerprints and light scratches; gloss shows both.
  • Edge banding: request the same decorative film on edges as on faces, with the radius stated. Thin PVC edges on a visible shelf front are the most common downgrade we see in value engineering.
  • Load deflection: long unsupported shelves sag. Ask for the span, board thickness and expected load together, and add a mid-span support where needed.

4. Agree who owns dust, clothes coverage and daily upkeep

Open storage collects dust and shows clutter. This is not a reason to reject the design; it is a specification item. Decide now whether some zones will be closed — a single glazed or framed section next to open hanging often solves both concerns without breaking the look.

Hybrid schemes pair open hanging with Glass Open Wardrobes sections for display items, keeping the airy feel while protecting what the client does not want to dust weekly. On the buyer side, ask the operator who cleans the shelves and how often, because that answer drives shelf depth, spacing and whether lighting is easy to access.

5. Specify integrated lighting as part of the wardrobe

Lighting inside an open wardrobe is a joinery detail, not an electrical afterthought. Recessed channels, driver location, cable routing and a switch or sensor all have to be built into the panel schedule.

  • Confirm where the driver sits and that it stays reachable after installation.
  • State colour temperature and CRI in the order, so samples from different batches match.
  • Decide whether light is task (inside hanging zones) or ambient (shelf washing), since these need different profiles.
  • Agree who supplies and who installs the wiring — this line item is frequently missed in tenders.

6. Set out tolerance, fixing and sequencing on site

Frameless and wall-hung open wardrobes expose every deviation in the building. A 15 mm floor level variation across a 3 m run will show at the top reveal. Put the tolerance regime in the drawings: where packing occurs, whether a shadow gap absorbs the variation, and which trade is responsible for preparing the wall.

  • Confirm substrate behind wall-hung rails and the fixing method for that substrate.
  • Agree the sequence: flooring, then wardrobe, or wardrobe then flooring. Both work; each needs a different detail.
  • Record who protects open units during the rest of the fit-out — open shelving gets knocked far more than closed cabinets.

7. Make one approval package, not two

The most reliable projects we work on issue a single sign-off pack: elevations with dimensions and rail heights, a material and edge schedule with physical samples, a lighting schedule, and the fixing/tolerance details — all signed by the design lead and the buyer at the same time. That one document becomes the reference for production and for site acceptance, so nothing gets re-litigated once panels are cut.

Practical rule of thumb: if a detail would be invisible behind a door, an open wardrobe will make it visible. Specify it as if the client were standing 300 mm away with a work light.

How SANTERSON supports this handover

SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, working from project-specific drawings rather than fixed catalogue sizes. For open wardrobe packages we produce made-to-measure sizing, matched material and finish options, and layouts drawn to the room — with the same team handling production, packing and door-to-door delivery, so the panel schedule that left the design stage is the one that arrives on site.

Send us your elevations, a room section and the storage programme you have agreed with the client. We will return a build-up for each unit — core, surface, edge banding, rail heights, lighting provision and fixing method — so designers and buyers approve one package instead of negotiating twice.

Note: dimensions, load limits, finish availability and fixing details are confirmed per project. The examples above describe specification practice, not fixed product data.