If you import pools, spas or outdoor leisure products under your own brand, the question that decides your margin is rarely the shell itself. It is whether one factory can hold a product configuration steady across repeat orders, document every option, and still support the unit after the container has cleared. Outdoor Swim Spa WS-PC06CH is one of the configurable swim and hydrotherapy units in our catalogue, and it works well as a worked example of how OEM sourcing runs — from the first drawing through production, freight and after-sales support.

What We Mean By OEM On This Model

Two arrangements get confused often. In private-label or brand-customisation work, you sell a unit that we already produce, with your name, marking and packaging on it. In OEM manufacturing, your engineering team defines the specification — dimensions, jet layout, pump and filtration arrangement, control interface, finish — and our factory builds to your drawings.

WS-PC06CH sits in the middle of that range. The base unit is proven and documented; what changes between customers is the configuration around it. Our Custom & OEM Service covers custom design and prototyping, bespoke finishes and textures, OEM production runs, flexible minimum order quantities and brand customisation such as logos and packaging.

The Base Unit As Catalogued

These are the figures published on the WS-PC06CH product page. Treat them as the starting point for a configuration discussion, not as a fixed delivery specification.

ModelWS-PC06CH
Catalogue dimensions6000 × 3000 × 900 mm
Jet total38 pcs
Water pump2 pcs
Filter pump1 pc
Control system1 set
LED lights1 pc
Total power3.25 kW
Features shownWater jets, LED lighting, Ozone
Optional accessoriesControl systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps

A swim training system is not listed for this model in the catalogue. If your market needs continuous-swim capability, we look at it as a configuration question on an appropriate model rather than assuming it fits WS-PC06CH.

The OEM Steps We Actually Follow

Our design and project service runs on a repeatable sequence — brief and proposal, quotation and detail confirmation, then production, shipment and follow-up. The same sequence applies to an OEM swim spa order.

  1. Brief. You send target market, quantity, retail or project context, plus any drawings, sample unit or competitor reference you are working from.
  2. Specification review. We confirm which parts of WS-PC06CH stay standard and which change: shell size within the range, jet count and placement, pump and filter selection, heating, ozone or UV sterilisation, insulation for colder climates, steps, control interface.
  3. Electrical and site data. Supply voltage, phase, available breaker size, earthing arrangement, installation substrate and access route. This determines heater sizing, pump selection and how the unit is wired on site.
  4. Quotation with a written configuration sheet. Every option you ordered is listed by name and quantity, so both sides are checking the same document at goods-receipt.
  5. Prototype or first article. For a genuinely bespoke specification we build one unit for your sign-off before series production. Where the specification follows an existing configuration, we confirm drawings and finish samples instead.
  6. Production and inspection. Manufacturing with quality control at the stages that matter on a wet product: shell integrity, plumbing pressure test, electrical continuity and insulation resistance, controller function test, finish inspection.
  7. Packaging and branding. Crating for export handling, plus your logo, labels, manuals and packaging where you have commissioned brand customisation.
  8. Shipping and handover. Freight arrangement, documentation, delivery, commissioning support and spare parts.

Where Buyers Get Into Difficulty

Most problems on a product like this are decided before production starts, not during it.

  • Voltage and supply assumptions. Total power is one number; what your site can actually deliver is another. Confirm the electrical requirement for the selected configuration in writing.
  • Options quoted loosely. "Heat pump included" and "13 kW heat pump, model stated" are different contracts. Availability and compatibility of accessories vary by model, so each option needs a named line on the configuration sheet.
  • Access and rigging. A 6000 × 3000 mm shell needs a clear path to the position it will sit on. Measure gates, side passages and overhead clearance before the container arrives.
  • Local rules. Electrical installation requirements, barrier and fencing obligations for water features differ by state, territory and municipality. Your local installer or certifier confirms what applies — we do not supply compliance certificates for your jurisdiction.
  • Spare parts after year one. Pumps, controllers, jets and lights are serviceable items. Agree the spare-parts list and how replacements ship before the first container.

Sourcing It As Part Of A Larger Order

A single container of pool shells is rarely the whole job on a resort or villa development. Because we work as a one-stop furniture and building materials supplier, the same purchase order can carry the swim spa together with the surrounding outdoor package — aluminium pergolas, cabana daybeds, sun loungers, dining and lounge sets — along with cabinetry, wardrobes, ceramics, lighting, flooring and wall or ceiling finishes for the buildings beside it. Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail, packaging and container loading, customs paperwork and shipment tracking. For project work, our Turnkey Solutions team coordinates design, production, logistics and site installation across those trades.

We manufacture furniture and building materials at our base in Longjiang, Shunde, Foshan, China, and have been doing so since 2008. Published project references include villa work in Sydney, Melbourne, Perth and North Turramurra. Our Installation & After-sales Support service covers on-site installation support, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance; ask us which support arrangements apply in your country before you commit to a service promise for your own customers.

What To Send Us Now

A useful enquiry for an OEM swim spa order contains: target quantity and repeat-order pattern; destination country and city; available electrical supply; the configuration you want against the WS-PC06CH baseline; branding or packaging requirements; and your required arrival window. With those six items we can come back with a configuration sheet, a quotation and a realistic production slot.

Talk to us about WS-PC06CH

Send your specification through the contact page, or reach PHILLIP directly on WhatsApp +86 13928214007. Business hours are Monday to Saturday, 8:00 AM – 6:00 PM GMT+8.