A pocket door disappears into the wall, so nothing swings into the room and no floor space is lost. That is exactly why specifiers keep coming back to them for bedrooms, ensuites, pantries and study nooks in villas and apartments. The hard part is not deciding whether you want one — it is knowing what to ask a manufacturer before you place an order, because the frame, the hardware and the door leaf all have to be agreed at the same time.
This guide walks through the decisions behind Santerson Wood Veneer Pocket Doors, what you should confirm at enquiry stage, and how a made-to-measure order is handled from drawing to site. It applies just as well if you are furnishing a single apartment or fitting out a batch of units.
What the product actually is
Santerson Wood Veneer Pocket Doors sit inside the Pocket Doors collection and are made for residential door projects. The doors are made to measure rather than offered in fixed sizes, and the finish, layout and dimensions are specified per space. In practice that means each opening is treated as its own line item: the clear opening width and height, the wall build-up the pocket will sit in, the veneer species and the finish are all set for your project instead of chosen from a shelf.
If you want the same sliding logic with a different face, Santerson Glass Pocket Doors are made to measure on the same basis. Where a hinged leaf suits the plan better — for example where the wall cannot be opened up to take a pocket — Santerson Wood Veneer Hinged Doors keep the same timber look on a conventional swing.
The five decisions that shape the order
- Opening and wall build-up first, door second. A pocket door needs a cavity in the wall for the leaf to travel into. Before anything is quoted, confirm the clear opening width and height, the total length of wall available for the pocket, and how the surrounding wall is constructed. Where the wall is structural or very thin, that answer changes the whole detail.
- Single or double leaf. A single leaf suits standard bedroom and bathroom openings. Two leaves sliding in opposite directions suit wide openings such as dressing-room entries or a kitchen opening onto a scullery, where one full-width leaf would be too heavy and too intrusive to park.
- Veneer species and finish. Wood veneer is chosen for the look of solid timber with a lighter, more stable panel. Ask which species are available, what finish options exist, and how the sample you approve relates to the delivered leaf. Approving a physical sample before production removes most of the argument later.
- Matching the rest of the joinery. Where the same veneer appears on wardrobes, wall panelling or cabinetry, order the doors alongside those items and specify one species and one finish across all of them. Wood Veneer Panels are made to measure on the same project-specific basis, so a door and the panelling beside it can be produced together against one approved sample.
- Track, hanger and stop quality. The visible leaf is only half of the product. Ask what track, hangers and floor guide or stop are supplied, and how the hardware is adjusted on site. A good door on a cheap track will still feel poor after a year of daily use.
What to confirm in writing before production starts
| Item to confirm | Why it matters |
|---|---|
| Clear opening size and finished floor level | Pocket doors are set out against the finished level. Getting this wrong means trimming walls or re-ordering leaves. |
| Wall construction and pocket depth | Determines whether a standard pocket frame fits or whether the wall needs to be rebuilt. |
| Veneer species, cut and finish | Grain direction and cut change the appearance of a large leaf far more than they do on a small sample card. |
| Hardware set and load rating | The track and hangers must carry the leaf size you have specified, not a generic default. |
| Ironmongery and handle detail | Recessed pulls and edge handles change the leaf thickness requirement, so they are decided with the door, not after it. |
| Packaging and protection for transit | Veneered leaves travel poorly in loose packing. Confirm how faces are protected and how spares are identified. |
How a made-to-measure order normally runs
- Brief and drawings. You send opening sizes, the wall detail and the room schedule; the manufacturer returns shop drawings for each door line.
- Sample and finish approval. A veneer and finish sample is approved before production. This is the point to check grain, sheen and colour against the adjoining joinery.
- Production and inspection. Leaves, frames and pocket components are produced as one set and checked together, so the track matches the leaf it carries.
- Packing and shipping. Doors are packed with the fixings and hardware sets labelled by opening, which is what makes site installation orderly rather than a scramble through crates.
- Installation and snagging. Hanging, levelling and adjusting the track happens on site, followed by an inspection of every leaf for smooth travel and correct closing.
Cost questions worth asking early
A pocket door is not priced as a leaf alone. The frame, the track set, the wall work to receive the pocket and the finishing of the reveal all sit in the same budget line. Ask for the door, frame and hardware as one itemised quotation so you can see where the money goes, and compare like-for-like against a hinged alternative before you decide. Where several openings share one detail, ordering them together usually simplifies both production and site sequencing.
For whole-apartment or villa work, buying doors with the rest of the built-in joinery — wardrobes, vanities, kitchen cabinetry and panelling — keeps species, finish and timing under one coordination point. That is where a single supplier for furniture and building materials earns its keep: one drawing set, one sample approval, one shipment to follow.