A product submittal is the document pack a specifier, contractor or buyer reviews before a custom cabinet line is released for manufacture. For Multi Function Tall Cabinets, which are made to measure for each project, the submittal is where finish, layout and dimension decisions get locked down in writing. Below is the checklist we work from on residential and hospitality fit-outs.
Why the Submittal Matters More for Made-to-Measure Units
Stock cabinetry can be ordered from a catalogue number. Tall cabinets built to a project's dimensions cannot. Once panels are cut and finishes are sprayed, changes become rework. The submittal exists so that every party — designer, procurement lead, installer and factory — signs off on the same set of drawings before production starts.
Our Multi Function Tall Cabinets sit in the Laundry Integration collection and are specified with project-specific dimensions, materials and finishes. The same made-to-measure approach applies across the wider Tall Cabinets range, including Utility Tall Cabinets, Integrated Appliance Tall Cabinets and Open Shelf Tall Cabinets. Each of these carries its own set of interface details, so the submittal has to reflect the exact configuration chosen.
1. Identification and Scope Block
Start with the boring part, because it is where mistakes are cheapest to fix. The first page should carry:
- Project name, address and the internal reference number used on drawings.
- Cabinet line or room tag, so the pack can be matched to the correct elevation on site.
- Product collection and configuration code as it will appear on the packing list.
- Revision number and date. Every reissue needs a new revision, not a red pen.
- Names of the specifier, the buyer and the party responsible for field verification.
2. Dimensioned Drawings
This is the core of the pack. For each unit type, include front elevations, side elevations and a plan showing the cabinet in relation to adjacent worktops, wall returns and door swings.
| Drawing | What it must show |
|---|---|
| Front elevation | Overall width and height, door and drawer split, handle positions, plinth or recessed base detail. |
| Side elevation | Overall depth, shelf spacing, back panel rebate, clearance to the wall finish. |
| Plan | Position in the room, opening direction, relationship to plumbing, electrical outlets and traffic routes. |
| Interior layout | Adjustable versus fixed shelves, drawer bank heights, appliance housings, hanging rails, hamper or tray units. |
| Interface details | Adjacent countertop edge returns, scribe fills to out-of-plaster walls, skirting cut-outs. |
3. Materials and Finish Schedule
Because material and finish options are selected per project, the schedule should name each surface separately rather than describing the cabinet as one item:
- Carcase: substrate, thickness, edge treatment and internal colour.
- Doors and drawer fronts: substrate, surface type (lacquer, laminate, veneer or acrylic), sheen level and colour reference.
- Colour reference: RAL code, manufacturer swatch number, or an approved physical sample reference. A screen-rendered colour is not a specification.
- Glass and inserts: glass type, thickness, tint and any film or mesh backing.
- Internal fittings: shelf load rating basis, runner and hinge make, soft-close provision.
Where a physical sample has been issued and approved, list it in the schedule with its approval date and attach a photograph of the signed sample. That single attachment resolves most later colour disputes.
4. Appliance and Services Coordination
Multi-function tall units frequently house laundry or kitchen appliances, and this is where submittals most often fail. For any appliance housing, the pack should carry:
- The exact appliance model and its published dimensions, taken from the appliance manufacturer's sheet.
- Required ventilation: air gap locations, grille sizes and whether the plinth is vented or sealed.
- Electrical point location, socket type and switch position relative to the cabinet.
- Water supply and waste routing for washer or combination units, including access for maintenance.
- Total connected load and who provides the circuit.
Appliance dimensions come from the appliance supplier, not the cabinet maker. If a substitute appliance is later approved, the housing drawing needs reissuing before the carcass goes into production.
5. Structural and Fixing Information
Tall units concentrate load at height, so the fixing method belongs in the submittal rather than being decided on site:
- Wall construction the unit fixes to, and whether additional blocking or a steel backing frame is required.
- Fixing type, spacing and the load basis used.
- Whether the unit is restrained to an adjacent run, to the wall, or to both.
- Floor finish build-up and any local packing needed for out-of-level floors.
- Maximum recommended shelf loading and which shelves are reinforced.
6. Tolerances, Finishing and Site Conditions
Include what has been allowed for and what has been left to site verification:
- Scribe or filler widths at walls and ceilings, and the maximum deviation assumed.
- Sequence of work: where the cabinet is installed relative to plastering, tiling, flooring and painting.
- Protection arrangements if the units are installed before other trades finish.
- Moisture exposure in the room, particularly for bathroom-adjacent laundry areas, and the material chosen in response.
7. Packaging, Delivery and Handling
For imported cabinetry this section prevents avoidable damage claims. The submittal should record whether units arrive assembled or flat-packed, the packaging specification, pallet or crate count per room line, labelling convention that ties each package to a drawing tag, and the delivery point agreed on site.
Our logistics scope covers freight by sea, air and rail with customs paperwork and door-to-door delivery, so the packing list and container arrangement can be aligned with the drawing tags in the submittal. Confirm Incoterms, insurance cover and delivery window for each project individually; these are commercial terms, not fixed defaults.
8. Approvals Record
Close the pack with a signature block: specifier, buyer and installer, each with date. Attach the approved sample references and list any open items still to be resolved, with an owner and a due date. A submittal with three unresolved items clearly listed is safer than one that quietly assumes they were settled.
Common Gaps We See
- Overall height quoted without stating the datum or the floor build-up.
- Appliance housing drawn to generic dimensions instead of a named model.
- Colour specified by name only, with no swatch code or signed sample.
- Ventilation for built-in appliances left out entirely.
- No fixing detail because the wall construction had not been confirmed.
- Packing labels that do not match drawing tags, causing units to be installed in the wrong flat.
How We Prepare the Pack
For custom cabinetry we work from a project brief through drawings and quotation confirmation, then into production. Detail confirmation happens before manufacture: layouts are drawn, finishes are matched to approved samples, and appliance interfaces are checked against supplier sheets. Where a project needs OEM or private-label treatment, that is handled at the same detail stage.