A double basin countertop looks simple on a drawing: one long slab, two bowls, two taps. On site it is where four trades meet — stone, joinery, plumbing and tiling — and where a missing measurement or a late tapware decision turns into cut stone sitting in a crate and a bathroom that cannot be handed over. This guide walks through how we take quantities for the Santerson Double Basin Countertop in villa and apartment bathrooms, and which products have to be decided at the same time so the sequence on site holds.
What the Santerson double basin countertop is specified as
The unit sits in our Countertops & Basins range and is made to order rather than stocked to a fixed size. For each project we confirm the length, depth and thickness of the top, the material and finish, the layout of the two basins, and how the piece meets the wall and any adjacent joinery. That made-to-measure approach is the reason quantity planning matters: once a drawing is wrong there is no standard size to fall back on.
Because the unit is project-specific, one bathroom can produce two very different orders — basins set under the surface with the stone edge wrapped over them, or bowls resting on top of the slab. Both are workable, but they drive different cut-outs, different tap positions and different clearances behind the bowl.
Quantity planning: what to count before you order
For each bathroom in the set, we build a small schedule rather than a single line item. The items below are the ones that cause rework when they are left blank.
| Item to confirm | Why it has to be fixed before production |
|---|---|
| Bathroom type and quantity of each | A villa or apartment block is quoted as a set of bathroom types, not floor by floor. Identical bathrooms should share one specification so the stone batch, edge profile and basin cut-out template stay interchangeable — including for any spare top ordered later. |
| Overall length and depth of the top, plus thickness | The slab is cut to the finished wall-to-wall dimension. Tiles, plaster and any wall lining change that number, so measure off the finished surfaces, not the structural wall. |
| Basin type — undermount, vessel or integrated | Undermount bowls need a cut-out and support rails; vessel bowls need clear deck space behind and beside them; an integrated basin removes the joint but fixes the fall to the waste. |
| Basin spacing and distance from each end | Two people standing side by side need enough stone between the bowls. Set this from the centre line of the room, not from a corner. |
| Tapware holes or deck-mounted spouts | Holes are drilled in the stone. Tap reach, spout height and handle clearance must be chosen before drilling, and matched to the waste type. |
| Waste and overflow specification | The waste body has to clear the vanity carcass and the trap connection below. Confirm it with the plumbing drawings, not after the top is cut. |
| Cut-outs for sockets, towel rails or wall niches | Anything passing through the slab should be marked on the shop drawing at the same time as the basin cut-outs. |
| Edge profile and splashback | A squared edge, a bullnose and an upstand against the wall are each detailed and fabricated differently. Decide once for the whole set. |
How we count the set across a project
A villa with one master ensuite, two identical family bathrooms and one guest powder room produces three separate specifications — a double arrangement in the ensuite and the family bathrooms, a single arrangement elsewhere — even when all four rooms share the same stone. Splitting the take that way is what keeps spares, edge profiles and cut-out templates usable later in the job.
The check we run before releasing a shop drawing:
- Walk the room with the marked dimensions on the wall and stand where each user would stand — elbow clearance to the side walls is what people actually notice.
- Confirm the clear depth behind the basins for taps against the wall or splashback, and the clear space in front for the towel rail.
- Check that the vanity carcass below carries the top at its full bearing line, and that drawer fronts open without fouling the waste pipework.
- Confirm which side has the water supply and where the trap will land before the cut-out position is frozen.
Product coordination: what sits with the countertop
Quantities only matter if the products around the top are decided in step. The items below each change a dimension on the countertop drawing, so we close them out together — and all of them come from our bathroom sanitary fixtures range.
Vanity and carcass: the structure underneath
If the top is going to sit on a vanity rather than be wall-supported, choose the carcass first. A Santerson Double Vanity is specified to the same project dimensions and finish, so the carcass width, drawer layout and plinth line up with the slab above it. Where the wall needs to read as clear floor, a Santerson Floating Vanity changes how the top is supported and where concealed fixings land — that detail has to be set before the stone is cut, not discovered when the bracket arrives. Where a seamless look matters, an Santerson Integrated Countertop Vanity combines the basin form with the top in one piece and removes the joint that usually collects sealant.
Basins: three ways to sit on the same slab
- Santerson Undermount Basin — set below the surface, so the stone edge is exposed and easy to wipe across. The cut-out shape and the support method must be confirmed with the slab thickness.
- Santerson Vessel Basin (Above Counter) — sits on the deck, so it raises the wash height and needs clear deck space around it. Tap spout height has to be selected with the bowl rim in mind.
- Integrated Basin — basin and top formed as one, which removes the joint but fixes the fall and the waste position for good.
Stone and marble surfaces for the top itself
Where the finish is the point of the design, Santerson Stone & Marble Surfaces covers made-to-measure stone and marble tops with material and finish options chosen per project. For a double arrangement, we ask for the slab to come from one batch so the veining runs consistently across both ends of a long top, and we specify the edge profile once for the whole set.
Mirror cabinets, lighting and accessories above the top
The wall above the slab has to be planned with it. A Santerson LED Mirror Cabinet or a Santerson Tall Mirror Cabinet needs its electrical outlet position and its door swing confirmed against the tap reach below, so a mirror door does not meet an elbow. For lighting beside the mirrors, Santerson Wall Sconces and Vanity Lighting are specified to the project, and their fixing positions must be set before tiling. On a stone wall or splashback, a sconce cannot be relocated after the slab is fabricated without leaving a visible hole.
One more item finishes the wall: Santerson Towel Warmers & Rails, specified to the project, whose position and fixing need to clear the door swing and the standing elbow line. Its mounting points and supply connection have to be in the right place before the wall is closed up.
Shower and ceramics in the same bathroom
Bathrooms are usually handed over as complete rooms, so the wet-side specification travels with the vanity order. Our Modern Rainfall Shower System with Handheld Sprayer combines an overhead rainfall head with an adjustable handheld sprayer on a wall-mounted slide bar, and is supplied as a complete set with standard installation accessories. The rough-in position of its riser has to be fixed while the wall is still open — the same moment the countertop drawing is being approved. Ceramic items in the same range, from wall-hung basins to WC suites, are specified the same way, against the finished wall face rather than the structure behind it.
Sequencing: the order in which decisions have to be made
Quantities are only half of it. The other half is closing each decision before the trade behind it starts, because every stage below fixes something for the next one.
| Stage | What must be closed out |
|---|---|
| 1. Layout and levels | Finished floor levels, finished wall lines, door swing, and the standing positions for each user of the double basin. |
| 2. Vanity and support method | Carcass type (floor-standing or floating), width, drawer layout, bearing line for the top. |
| 3. Basins, tapware and wastes | Bowl type and model, spout reach and height, waste and overflow type, trap position. |
| 4. Countertop shop drawing | Slab size, material and batch, edge profile, basin cut-outs, tap holes, any service cut-outs. |
| 5. Wall services above the top | Mirror cabinet or mirror position, sconce and vanity lighting points, towel warmer position. |
| 6. Wet side | Shower rough-in, ceramics set-out, tiling line that sets the finished wall face. |
| 7. Production and site coordination | Made-to-measure production, then delivery to site in the sequence the trades need it. |
The single most common failure we see on double-basin work is stage 3 being decided after stage 4. Tapware chosen late means either a hole in the wrong place or an uncovered hole left in good stone. Closing tapware, waste and bowl model together, before the slab drawing is released, removes that risk.
Confirm on every project: dimensions of the top and cut-outs; basin and countertop compatibility; material and finish for the selected configuration; mirror, lighting and towel-rail electrical specifications; and installation requirements for the final build-up. These are configuration-dependent, and we confirm them per project rather than assuming a standard.
Ordering the whole bathroom set from one supplier
When the countertops, vanities, basins, mirror cabinets, lighting and shower sets all come from one source, the coordination burden drops. One shop drawing covers the vanity wall; one production round fixes stone batch and finish; one delivery schedule feeds the trades in order. As a one-stop furniture and building materials supplier, we handle this as project procurement: material selection and product specification, manufacturing and quality control, then logistics and site coordination through to installation and after-sales support.
For villa and apartment work this also means the joinery around the bathroom — wardrobes, linen cabinets, tall storage — can be specified in the same finishes as the vanity carcass, so the whole floor reads as one design rather than a set of purchased parts. Where a project needs bespoke dimensions or a specific material and finish combination, our custom and OEM service covers made-to-order sizing and prototyping before production.
Frequently asked questions
Can the double basin countertop be ordered to a non-standard length?
Yes. The unit is made to measure, so length, depth and thickness are set from the finished room dimensions on your drawings. Send the finished wall-to-wall measurement with the tile build-up already included.
How far apart should the two basins be?
Set it from the people using the room. Start from the centre line of the wall, place each basin so both users have clear elbow room to the side walls and to each other, then check that taps, mirror and lighting still sit in balance above the arrangement. The spacing is fixed at the shop-drawing stage, so this decision cannot be deferred.
Can I change from undermount to vessel bowls later?
Not without re-cutting or replacing the slab. Undermount cut-outs, tap holes and deck clearance differ between the two arrangements, which is why bowl type has to be confirmed before the countertop drawing is released.
What does a double arrangement need that a single one does not?
Two waste and trap routes below the carcass, a wider bearing line under the slab, twice the electrical points above it, and enough stone between the bowls for both users. Plan the carcass and the plumbing routes as a pair from the start.
Next step
Send us your bathroom set-out drawings, the finished floor and wall levels, and your preferred stone or marble finish. We will return a shop drawing for the Santerson Double Basin Countertop with basin cut-outs and tap positions marked, together with a schedule of the vanities, basins, mirror cabinets and lighting that have to be fixed against it. All dimensions, materials and installation requirements are confirmed with you before production begins.