A set of textured melamine cabinets can look flawless in the showroom and still fail on site: doors that no longer line up, panels chipped on the day of delivery, a worktop that sits 4 mm proud of the carcase. Those problems are almost never caused by the boards themselves. They are caused by installing cabinetry without a plan. If you are a contractor, builder or project manager ordering made-to-measure joinery for kitchens, wardrobes or vanities, this article lists what belongs in an installation plan before the panels leave the factory.

Why textured melamine needs a different plan from plain laminate

Melamine-faced panel is decorative paper pressed onto a board core. The embossed grain or matte texture you see on the surface is thin, and once it is cut or drilled it cannot be touched up the way a sprayed lacquer door can. That single fact drives most of the planning below.

Three practical consequences follow:

  • Every cut edge that will be visible has to be edge-banded at the factory, not on site. Site-applied tape rarely matches the texture and colour of an embossed panel.
  • Handling damage shows. A scuffed textured door is a replacement order, not a repair, so protection and sequencing matter from the moment the crates arrive.
  • Tolerances have to be settled on paper before manufacturing. A wall that is out of plumb is absorbed by scribing or an adjusted side panel — decided in the drawing, not with a shim on the day.

Our made-to-measure work, including Textured Melamine Cabinets and Textured Melamine Wardrobes, is specified per project — finish, layout and dimensions are confirmed with the buyer before production. The installation plan is where those confirmations become a workable sequence on site.

1. Verified site dimensions, taken after the wet trades finish

Re-measure on site once plaster, screed, tiling and floor finishes are complete, and record each wall at three heights and three widths rather than one average. Note out-of-plumb walls, floor level differences across the run, skirting that will be removed, and the position of every soil stack, riser and spur.

  • Record finished floor level and finished ceiling level; a 10 mm slab variation along a 4 m kitchen run changes the tall-unit height.
  • Photograph the empty room with a tape in frame, and keep the drawing set and the photographs together as one document.
  • Flag anything that cannot move — a structural column, an existing flue, a manifold — because moving it is usually more expensive than re-dimensioning a cabinet.

2. Services set-out before the carcases are made

Cabinetry fixes the position of plumbing, extraction and power for good. Put the services set-out drawing in the plan, with dimensions from two fixed walls and from finished floor level, so the first fixer and the cabinet maker are working to the same numbers.

ItemWhat the plan must state
Sink, tap and wasteWaste centre line, isolation valve height, whether a water filter or softener occupies the base unit
Integrated appliancesModel numbers, door-hinge side, ventilation gap and cable outlet position for each built-in oven, dishwasher and column unit
Hob and extractorDuct route, ceiling void depth, and whether the hood is ducted out or recirculating
LightingTransformer and driver locations, plus where cabinet lighting needs a drilled channel — decide this before panels are machined. See our integrated cabinet lighting range.
Worktop cut-outsSink and hob cut-out positions confirmed against the final worktop drawing, not the initial layout sketch

3. A finished specification sheet that survives handover

Texture and colour names are not enough. The plan should carry one specification table for every run, listing the board material, surface finish, edge treatment, door style, hardware brand and opening direction. Where a project mixes finishes — an island in one texture, tall units in another — state each explicitly so the site team can check the delivery against paper.

Useful reference points from our catalogue include Matte Melamine Cabinets, Wood Grain Melamine Cabinets and Two Tone Melamine Cabinets. Naming the exact product page in your specification removes the ambiguity that appears when two suppliers describe a finish as "oak effect".

Add the trade sequence around the joinery. Wall paneling, concealed doors and integrated appliances interact with cabinetry: our wall panel systems and decorative concealed doors are set out against the same dimensions as the cabinets, so both trades should be working from one coordinated drawing rather than two.

4. Packaging, delivery and storage conditions

Made-to-measure cabinetry usually arrives by sea in mixed containers with other fit-out goods. The installation plan should say how the goods reach the property and where they wait.

  • Crates labelled with room and unit reference, matched to the layout drawing, so installers never open a crate "to look".
  • Storage inside, dry, flat and off the ground — melamine board cores swell at the edges if they get wet, and doors stored on edge will bow.
  • A clear route from the vehicle to the room. Measure door widths and lift openings before delivery; panels that cannot be turned a corner get damaged trying.
  • Delivery timed after painting, flooring and glazing are complete, so the cabinets are not sitting in a dusty working environment for six weeks.

We handle freight forwarding, packaging and container loading, customs paperwork and door-to-door delivery as part of the project scope. Ask us to confirm the Incoterms, crate list and delivery address on the same document you use for installation.

5. A written installation sequence with hold points

Write the order of work and the point at which each stage is signed off. A typical sequence for a melamine kitchen or wardrobe run:

  1. Unpack, check quantities against the crate list, inspect panels for transit damage, photograph any defect on the day of arrival.
  2. Level and fix the base run; set heights from finished floor level, not from a random point in the room.
  3. Hang wall units or fit tall units to the marked set-out; confirm vertical and horizontal alignment before screwing into the substrate.
  4. Fit doors, drawers and hinges, then adjust for even gaps across the whole run — do this after all carcases are fixed, not unit by unit.
  5. Install worktops and cut-outs, seal the front edge of the worktop against the wall splashback, and re-check door alignment afterwards.
  6. Connect appliances and lighting, then run every drawer, door and soft-close to confirm operation.
  7. Clean the surfaces with a damp cloth only — no abrasive cleaners on textured melamine — and walk the snag list with the client.

Our installation and after-sales support covers on-site installation, inspection and snags, spare parts and ongoing maintenance. For projects overseas we coordinate installation guidance with the local team rather than assuming one method fits every site; confirm what is included for your specific project before you commit dates.

6. Spares, tolerances and the snag list

Include a small contingency in the order and be explicit about who pays for what. On-site measurement errors happen; ordering one or two extra panels of the same texture and batch avoids a colour mismatch later, because melamine paper batches can vary slightly between production runs.

  • Agree which tolerances are corrected on site by adjustment and which require a replacement panel.
  • Keep the crate list, drawing revision number and specification sheet in the handover pack — the next contractor to touch the joinery will need them.
  • Record batch or lot references for panels and worktops so a future matching order is possible.

The checklist before you release the order

  • Site re-measured after wet trades, with drawings and photographs archived together.
  • Services set-out dimensions issued to both the first-fix team and the cabinet maker.
  • Specification sheet naming exact finishes, edge treatment, hardware and opening direction.
  • Appliance models fixed, with ventilation gaps and outlet positions shown.
  • Worktop cut-out drawing confirmed against the final layout.
  • Delivery route, storage location and delivery date agreed in writing.
  • Installation sequence with hold points, plus a named sign-off for each stage.
  • Contingency panels ordered from the same batch; handover pack defined.

If you want the joinery and the surrounding finishes coordinated from one drawing set — cabinetry, wardrobes, paneling and doors made to the same dimensions — send us your layout and we will return a specification and installation plan you can issue to site. As a China-based furniture and building materials manufacturer, SANTERSON supplies custom cabinetry for villa, hospitality and office projects, with production, logistics and installation support under one scope.

Contact PHILLIP to discuss your cabinet schedule and delivery programme: https://www.santerson.com/contact/