A wall sconce is a small line item on a bathroom schedule and a large source of rework when it arrives without the information the site team needs. If you are specifying Santerson Wall Sconces for a villa or hotel bathroom package, the submittal is where the fixture stops being a catalogue picture and becomes something an electrician can install. Below is what we ask buyers, consultants and main contractors to have in that pack, and what we fill in on our side.
Why the submittal matters more for sconces than for other fixtures
Our wall sconce range is made to order. Finish, layout and overall dimensions are set per project rather than picked from stock sizes, which is exactly why a generic cut sheet is not enough. The same model number can be produced with a different back plate position, a different driver location or a different cable exit, and each of those decisions changes what has to happen in the wall behind the tile.
A complete submittal lets the electrical contractor confirm the circuit, the tiler confirm the setting-out, and the project manager confirm the delivery sequence against the bathroom fit-out. An incomplete one usually comes back as a variation after the first fix is already closed up.
1. Identification and scope
Start with the basics that let anyone on site match the pack to the schedule:
- Schedule item number from your lighting or bathroom fixture schedule, cross-referenced to the room list.
- Fixture name and our product reference, plus the page it was taken from so the specification is traceable.
- Quantity by room type, and a note where the same fixture repeats across multiple bathrooms with different sizes.
- The scope boundary: which items in the pack are supplied by us and which are local — for example wall boxes, drivers mounted away from the fitting, or the final connection at the junction box.
2. Dimensioned drawings, not a photograph
The image on a product page is useful for approval of appearance; it is useless for installation. The submittal should carry a dimensioned elevation and a plan detail showing:
- Overall width, height and projection from the finished wall face.
- Centre-line heights above floor and above the basin or mirror, measured from your own datum.
- Back plate diameter and fixing centres, so the tiler knows where the fixings land relative to tile joints.
- Cable exit position on the back plate, and whether a wall box is required or the fitting suits a flush-out cable.
- Clearance from the mirror edge and from the shower enclosure — a sconce beside a wet area needs a different conversation than one in a dry part of the room.
Because sizing is made to measure, we would rather see your reflected ceiling plan or bathroom elevation with the proposed setting-out before drawings are issued. That avoids the situation where a fixture is produced for a mirror that was later resized.
3. Finish and material schedule
Sconces sit next to mirrors, tapware, cabinet handles and door hardware, so finish consistency is a visible quality issue. Include in the pack:
- The selected finish with its reference, and a physical sample or sample card where the finish has a sheen that photographs poorly.
- Material of shade, body and back plate, and any coating system for high-humidity bathroom environments.
- A cross-reference to the finishes already fixed for vanities, mirror cabinets and shower hardware, so clashes are caught at submittal stage rather than on site.
4. Electrical data — confirm this per project
This is the section most often left blank. Our product pages do not publish a single fixed electrical specification, because the fitting is configured for each project and destination-market requirements differ. The submittal should therefore state, and be signed off against:
- Supply voltage and frequency for the destination country.
- Light source type, whether integrated LED or a lamp to be sourced locally, and driver location.
- Wattage, luminous output and colour temperature, with tolerance band if several rooms are being lit together.
- Dimming method and compatibility with the chosen switch or control system, confirmed before ordering drivers.
- Suitability for the intended bathroom zone, including the ingress protection rating required by your local regulations for that zone.
Do not carry electrical values across from a sample or from another project. We confirm voltage, driver type, output and the applicable rating for the specific configuration and destination at order confirmation, and that confirmed sheet is what should be attached to your submittal.
5. Where the sconce sits in a wider bathroom package
Sconces rarely fail on their own; they fail against the item beside them. If the same room also contains vanity lighting or a mirror cabinet with its own illumination, the submittal should show both together so colour temperature and output are matched rather than decided by two different suppliers.
The same logic applies to decorative wall lights in living areas. A sculptural cone sconce in a hallway or a decorative mirror wall light at a vanity both need the same setting-out discipline: stem length, wall base position and how the fitting relates to panelling or joinery that is also being made to order.
When lighting is ordered alongside vanities, mirror cabinets, basins and shower hardware from one supplier, coordination becomes a single conversation instead of four. That is the practical reason we supply bathroom lighting as part of a wider bathroom fixture package rather than as an isolated accessory.
6. Installation and site sequence
A usable submittal finishes with a short installation section:
- First-fix items supplied by us versus second-fix items, and which trades handle each.
- Fixing method for the wall build-up in that room — tile, plasterboard, stone panel or joinery panel — since this determines fixings and driver access.
- Access provision for the driver if it sits behind the fitting inside a tiled zone.
- Handling, protection and replacement parts, including spare shades or diffusers for rooms that repeat.
7. Commercial and delivery information
Close the pack with the practical commercial detail your procurement file needs: unit price and total, packaging and carton dimensions for the goods-in check, lead time from confirmed drawings, and the shipping arrangement agreed for the project. Where we handle freight, the submittal should match the packing list that will arrive, so the site team can check quantities against the same item codes.
If your project also covers custom joinery or bespoke finishes, our custom and OEM service follows the same drawing-first sequence: approved shop drawings before production starts. Lighting is no different — the drawing is what protects the price and the date.
A short checklist before you submit
| Section | Confirm it answers |
|---|---|
| Identification | Which schedule item, which rooms, what quantity, and where our scope ends. |
| Drawings | Overall size, mounting heights, fixing centres, cable exit and clearances to mirror and wet area. |
| Finish | Named finish with sample, materials, and match to tapware and cabinet hardware. |
| Electrical | Voltage, driver, output, colour temperature, dimming and the rating required for that bathroom zone. |
| Coordination | Relationship to vanity lighting, mirror cabinets and panelling in the same room. |
| Installation | First-fix and second-fix split, fixing method per wall build-up, driver access, spares. |
| Commercial | Price, packing list, lead time from approved drawings, delivery terms. |
Send us the room schedule, and we will draft the pack
If you are assembling a submittal now, send the bathroom or lighting schedule with your target mounting heights and finish preference. We will return dimensioned drawings for the specific configuration, the confirmed electrical data for your destination market, and a quotation against that drawing — so what goes into your approval file is the same information that governs production. Lead times and freight arrangements are quoted for the confirmed configuration and destination rather than published as fixed figures, because both depend on the specification you approve.
Talk to us about wall sconces and bathroom lighting for villa and hotel projects through our contact page. If the lighting is part of a larger fit-out, we can coordinate it with vanities, mirror cabinets, basins and joinery under one package.