A swim spa that looks right in a render can still stall a project once it reaches site: the wrong electrical supply, an access route the delivery truck cannot use, or a pump package nobody priced. The model sheet is only the start of the record. This note sets out what procurement teams should capture before a purchase order is raised for Outdoor Swim Spa WS-PC08U, and which items have to be confirmed in writing rather than assumed from a catalogue page.

What the published specification already covers

The product listing for WS-PC08U gives a fixed starting point: catalog dimensions of 8000 × 3000 × 1500 mm, one control system, four water pumps, one filter pump, 33 jets in total, one LED light and a total power figure of 11.85 kW. The features shown on the page are water jets, LED lighting and ozone. Treat these as the catalog baseline for this model, not as a delivered configuration — options such as heat pumps, UV sterilisation, sand filtration, insulation and steps are listed separately, and availability varies by model.

Two entries in that table deserve particular attention during specification review. The captured specifications do not list a swim training system for WS-PC08U, while closely related models in the same range do carry one. If the project brief calls for lap swimming or resistance training, that difference needs to be settled at quotation stage and recorded on the order, because it changes both the equipment schedule and the power load.

Site conditions to record before ordering

For an 8 m vessel with a 1.5 m depth, the building fabric usually decides the programme more than the factory does. Capture these as measured facts on a site sheet, with photographs and the name of the person who took them:

  • Slab and ground bearing. Record the finished pad level, drainage falls around the shell and whether the surround is to be built up after delivery or prepared beforehand.
  • Access route. Note gate widths, overhead clearance, turning space and the last leg from the truck to the pad. State explicitly whether a crane is needed and who arranges it.
  • Electrical supply at the spa location. The catalog total power figure is a starting number for coordination; the available supply, protection device and cable route must be confirmed with the local electrical contractor before the order is placed.
  • Plant and service space. Allow working room for the filter pump and control system, plus a route for routine maintenance without lifting anything out of the water.
Confirm included equipment and electrical requirements for the selected configuration. Do not let a catalogue figure travel through the tender as if it were a site condition.

The equipment schedule: what to write down line by line

Ask each bidder to complete the same table, so quotations can be compared item for item rather than as a lump sum. Blank cells are the real risk in this part of the document.

ItemCatalog reference for WS-PC08UTo confirm on the order
Overall dimensions8000 × 3000 × 1500 mmShell, coping and pad levels against the setting-out drawing
Control system1 setInterface location, user access, control wiring route
Water pumps4 pcsDuty of each circuit and where each pump sits
Filter pump1 pcFiltration media and the service access provided
Jets33 pcs totalJet layout drawing, seat positions, jet types
LED lighting1 pcFitting position and any control integration
Total power11.85 kWSupply arrangement agreed with the electrical contractor
Water treatmentOzone shown on the pageWhether UV sterilisation is included or added as an option
Swim training systemNot listed for this model in the captured specificationsRequired or not required, stated in writing

Options and accessories: price them now, not at handover

The catalog lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options. Each one has a site consequence:

  • Heat pump. Affects the electrical distribution and needs a location with airflow and a condensate path.
  • Sand filtration. Takes up plant-room space that is hard to create after the surround is built.
  • Insulation. Relevant where the spa sits outdoors in cooler months; specify what is insulated and how.
  • Steps. Changes access geometry and affects how children and older users enter, so fix the position on the layout drawing.

Where a project needs several units or a different shell shape, ask whether the range can be configured rather than assuming one catalogue entry is the only answer. The wider Swimming Pools and Swim Spas collection lists multiple configurations, and where a bespoke form is required there is also a customizable shape outdoor spa built around an acrylic shell with structural reinforcement, offered in square, round, oval and curved layouts for gardens, terraces and leisure areas.

Commercial terms that belong in the same file

Water features cross more trades than a piece of furniture does, so the commercial record needs the same discipline as the technical one:

  • Scope split. Name the party responsible for civil works, electrical connection, plumbing, lifting and commissioning. Ambiguity here is the most common cause of delay.
  • Packaging and delivery. Confirm how the unit is packed, the container type, and door-to-door delivery terms through to the site, with customs paperwork prepared alongside the shipment.
  • Inspection points. Agree what is checked before despatch and what is signed off on arrival, including shell condition and the quantity of loose equipment against the packing list.
  • Aftercare. Record which spare parts are held, who carries out repair or replacement work in the country of installation, and what response commitment applies to the project location.

A short checklist before the purchase order

  • Configuration signed off against the equipment schedule above, with no blank cells
  • Setting-out drawing issued to the civil and electrical trades
  • Electrical supply confirmed against the coordinated load
  • Access and lifting plan agreed with names and dates
  • Options — heat pump, filtration, insulation, steps — priced and shown on drawings
  • Delivery terms, inspection points and aftercare contacts recorded in one place

Working with a single supplier across the package

Swim spas rarely arrive alone. A villa or resort package normally carries poolside loungers, cabanas, outdoor dining sets, pergolas and the adjacent bathroom and interior finishes as well. Coordinating those items through one turnkey furniture and building materials company keeps finish schedules, shipping windows and site handover in a single thread instead of several unrelated supplier conversations.

SANTERSON manufactures outdoor swim spas alongside outdoor furniture, bathroom ceramics, lighting, cabinetry and building materials, with custom and OEM service, door-to-door delivery and installation support. Send the equipment schedule above with your drawings for a quotation based on the configuration you have specified: Contact.