A flat panel door is the easiest wardrobe front to specify and the easiest one to get wrong. Nothing on the face hides an out-of-square opening, a mismatched grain direction or a door that fouls the skirting. If you are sourcing built-in storage for a villa, apartment or hotel room, the checklist below covers the eleven items we ask every buyer to settle before an order is placed — measurement, doors, carcass, interior, finishes, hardware, tolerances, documentation and delivery.

1. What exactly counts as "flat panel hinged"

Two decisions sit inside the name, and both belong on your purchase order in writing. Flat panel means a slab-front door with no routed field, moulding or arch — a clean surface that can be laid out flush across a whole wall. Hinged means the doors swing on hinges rather than running on a sliding track, so they need clear swing space in front of the wardrobe.

Keeping these two attributes separate matters when you compare quotations. A supplier can quote a flat slab front on a sliding gear and still call it a modern wardrobe. Our Flat Panel Hinged Wardrobes sit in the hinged door collection, alongside Paneled Hinged Wardrobes and Mirrored Hinged Wardrobes, so the door style and the opening mechanism are both stated on the page.

2. Door swing clearance and room layout

Before you choose a single door, mark the swing arc on the floor plan. A hinged door needs the depth of the door plus the handle or finger channel in front of the carcass. In a narrow bedroom this is often the point where hinged becomes sliding, and that change alters price, internal access and how much of the interior you can see at once.

  • Check the distance to the bed, the opposite wall and any doorway that crosses the wardrobe face.
  • Confirm doors will clear light switches, radiator heads, skirting and curtain returns.
  • For a corner, ask for a Hinged Door Corner Wardrobe unit rather than forcing a straight run into an awkward angle.
  • Decide the hinge side of every door on the drawing, not on site.

3. Site measurement and what you hand over

Made-to-measure only works if the numbers you send describe the room as it will be when the wardrobe arrives, not as it was when you measured. Take heights and widths at several points on each wall — old walls are rarely plumb — and note floor finishes, ceiling details, skirting depth, and anything recessed such as downlights or air conditioning returns.

  • Send a dimensioned sketch with the level line marked, not just three numbers.
  • State whether floor and wall finishes are already laid or still to come.
  • Flag pipes, boxes, switches and structural columns that the carcass has to scribe around.
  • For multiple rooms, keep one drawing per room with a clear room label.

Where a full wall is being fitted, wardrobe fronts are often specified to sit flush with the surrounding Integrated Door & Paneling, so the joinery and the wall panelling must be drawn and ordered together.

4. Carcass, board material and structure

Ask what the carcass is made of and how it is assembled, not only what the door looks like. Board type, thickness and edge treatment decide whether a tall wardrobe stays flat over years of use and whether the unit survives container shipping and re-handling on site.

Ask aboutWhy it matters
Board type and gradeSets load-bearing behaviour, moisture resistance and cost. Match the grade to the room.
Panel thicknessFull-height doors and long spans need enough thickness to stay true.
Edge bandingSealed edges protect against humidity and look clean on open shelving.
Fixing methodConfirm how the unit ties to the wall or floor and what packers are supplied for uneven surfaces.
Back panelThin boards oil-canning; a fixed, rebated back keeps squareness on long runs.

Material choices such as wood, metals, engineered stone and laminates are part of the custom specification we work through with project buyers, which is documented on our Custom & OEM Service page.

5. Interior layout planned around how you store

The front is what people photograph; the interior is what people use. Draw the internal layout before the quotation, based on what actually has to fit: long hanging, short hanging double-stacked, drawers for folded clothes, shelves for linens, a zone for luggage or an ironing position.

  • Count hanging metres per user and split long from short rail space.
  • Put drawers between waist and knee height — below that you are kneeling to dress.
  • Keep shelf spans short enough that loaded boards do not deflect.
  • Decide now whether integrated lighting or a mirror on the door interior is wanted, because both need provision in the panel.

If you would rather start from a proven configuration than draw one from scratch, modular options such as Drawer Focused Modular Wardrobes and Hanging Modular Wardrobes show how internal emphasis changes the layout while the flat front stays the same.

6. Surface finish and colour approval

Flat panel fronts read every change in sheen, so finish approval is a checklist item, not an afterthought. Screen colours are unreliable for joinery: light direction, room size and neighbouring surfaces all shift the result. Order physical samples of the actual board with its edge band, view them in the room at two times of day, then sign off a named reference.

Finish familyWhat to check before approving
Matte lacquerEvenness across large panels and how fingerprints and cleaning show up.
High glossReflection of the room in the door; gloss amplifies any substrate defect.
AcrylicSheen depth and edge continuity where the wrap meets the return.
MelamineTexture direction, edge band colour match and impact resistance.
Wood veneerGrain direction across the whole run and colour variation between leaves.

For a bedroom where clean lines and handleless fronts matter, our Custom Minimalist Bedroom Wardrobe page sets out how size, internal layout, door style and surface finish are specified together.

7. Handles, hinges and hardware specification

Hardware is where quiet specification saves the most callbacks on site. Write down the brand or model, load rating, opening angle and finish for every item, and confirm what is included in the price versus added later.

  • Hinges: soft close or standard, cup diameter, overlay, and whether they are adjustable in three directions after hanging.
  • Handleless detail: finger channel, push-to-open mechanism or routed lip — each changes the panel build.
  • Rails and drawers: load rating, runner type, soft close, and rail length against your hanging requirement.
  • Finish of hardware: whether it matches the door metalwork in the room.
  • Serviceability: which parts are standard items you can replace locally later.

8. Tolerances, scribing and site conditions

A flat panel wall of wardrobes only looks intentional if the gaps are planned. Agree on paper how the unit meets an out-of-plumb wall, an uneven floor and a ceiling that wanders a few millimetres along its length.

  • Scribe or filler strips to take up wall deviation, colour matched to the carcass.
  • Tolerance allowance for expansion in humid rooms such as an ensuite-facing bedroom.
  • Shadow gaps between doors kept consistent across the run, with door alignment set by adjustment.
  • How skirting is dealt with: cut around, scribed behind or removed and made good.

Put these decisions on the drawing. A detail agreed in production is cheap; the same detail solved with a saw on site is not.

9. Documentation, approvals and responsibility boundaries

For an apartment or hotel project, joinery frequently crosses more than one trade. Clear paperwork prevents the gap where nobody owns the detail.

  • Approved shop drawings with dimensions, door elevations and hinge sides signed before production starts.
  • A finish schedule naming each surface and its reference code.
  • Confirmation of what the wardrobe supplier supplies and where the electrician, plasterer or flooring contractor takes over.
  • Any strata, body corporate or client design approval obtained before manufacture.

Our Interior Design Services cover space layout planning, concept and mood boards, furniture layouts with 3D visual renderings, and project design coordination including drawings, production coordination and on-site guidance.

10. Packaging, freight and delivery sequence

Custom joinery is heavy, awkward and unforgiving of a second handling. If the wardrobe is shipping internationally, treat freight as part of the specification.

  • Panel protection at edges and faces, with each unit labelled to its room on the drawing.
  • Container loading plan so panels lie flat and heavy items sit low.
  • Customs documents prepared correctly: commercial invoice, packing list and certificate of origin.
  • Delivery date sequenced after wet trades and floor finishes are complete.

We arrange freight forwarding by sea, air and rail with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery — the scope is set out on our Logistics & Door-to-Door Delivery page. Import terms, duties and transit arrangements are confirmed project by project rather than assumed.

11. Installation, snag list and after-sales

Close the checklist with a defined handover. Doors need adjusting after hanging, and a unit installed on an uneven floor needs packing checked once the building has settled.

  • Who installs: your contractor or a supervised team from the supplier.
  • A snag list walked through with the buyer — door alignment, drawer runners, visible edges, clean surfaces.
  • Written warranty scope and what is excluded, plus how spare parts such as hinges and handles are ordered later.
  • Maintenance guidance for the chosen finish, especially for gloss fronts.

Our Installation & After-sales Support page lists on-site installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance.

Quick pre-order check: door style and opening mechanism stated separately; swing clearance verified on plan; dimensioned drawing with level line sent; board type, thickness and edge banding confirmed; internal layout drawn from your hanging and drawer counts; physical finish sample signed off in the room; hardware specified by model; scribing and tolerance details drawn; shop drawings approved; freight and delivery sequence agreed; snag list and warranty scope in writing.

Send us your wardrobe drawings

SANTERSON is a China-based furniture and building materials manufacturer supplying project buyers with made-to-measure built-in furniture, from single bedroom wardrobes to full villa and hotel fit-outs. Share your room dimensions, drawings and finish preference and we will quote the wardrobe against the checklist above. Enquiries through our contact page receive a response within 24 hours.