A custom outdoor swim spa is not a product you can order from a single line on a quotation sheet. Before production starts, the shell size, jet layout, water treatment, electrical supply and site preparation all have to match each other, because changing one of them later usually changes the others as well. The Outdoor Swim Spa WS-PC01 is a useful example: it is listed in our configurable outdoor swim and hydrotherapy range, so most of the decisions below are exactly what we ask buyers to settle before we open a production order.

Start with the shell, not the jets

The catalog entry for WS-PC01 shows a 3000 × 1050 mm footprint. Treat that figure as a reference point rather than the number you build your deck around. Confirm the internal water depth and seat layout against how the spa will actually be used — standing hydrotherapy, seated massage, or short dips between other activities — and confirm the finished external dimensions with us once the insulation package and steps are selected, since both add to the envelope.

If the site is a terrace, rooftop or sunken patio, share a plan drawing with level heights before we quote. Access routes matter too: an acrylic shell that fits through a side gate is very different from one that needs a crane.

Confirm the pump and jet package against the intended use

The WS-PC01 page lists two water pumps, one filter pump, a total of 53 jets, one control system and one LED light. Those numbers are what we publish for the standard configuration; they are not automatically correct for your project. Buyers frequently ask us to redistribute jets towards the lower back and calves, or to reduce the jet count in favour of a quieter, gentler flow for hotel guest villas. Tell us who will use the spa and for how long per session — that answer drives the pump sizing far more reliably than a jet count on its own.

Note also that the published WS-PC01 entry does not list a swim training system. If your project needs continuous current for lap swimming, we need to design for it explicitly rather than assume it is included.

Fix the electrical and power assumptions early

Total power for the listed WS-PC01 configuration is 6.65 kW, and that figure moves as soon as options are added. Before production we need written confirmation of:

  • The available supply at site: single-phase or three-phase, voltage and frequency.
  • Whether a heat pump will be added, and whether it runs on the same circuit or a dedicated one.
  • Circuit protection, earthing and residual-current requirements as specified by your local electrician.
  • Where the control panel sits relative to the shell, and how cable is routed and buried.

We build to the electrical data you supply. Your electrician or engineer signs off on compliance with local wiring rules — that division should be settled in writing before the cabinet is assembled, not at handover.

Decide the water treatment and maintenance model

Ozone is shown as a feature on WS-PC01. UV sterilisation, sand filtration and additional dosing arrangements are catalog options that we quote separately. The right combination depends on whether the spa serves one household or a small group of paying guests at a boutique property, because public or semi-public use brings inspection and water-log requirements your operator has to meet.

Ask us which filter cycle time and which filter media suit that usage level. A jet-heavy spa in a resort setting collects far more debris than the same unit on a private villa terrace, and undersized filtration shows up as recurring service calls within a season.

Agree the configuration sheet line by line

Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Below is how we like to see that information captured on a purchase enquiry — it removes most of the back-and-forth.

Item to confirmWhy it changes production
Finished external dimensions and access routeDetermines packaging, freight method and whether lifting equipment is needed on site
Jet count and jet placementAffects pump selection, cabinet plumbing and total power draw
Insulation packageAdds to the envelope and changes energy behaviour in cool climates
Heat pump and control systemSets circuit requirements and control panel location
Filtration and sterilisation methodDriven by usage intensity and any operator obligations
Steps, seating and LED arrangementFixed into the shell, so it cannot be revised after moulding
Figures such as 3000 × 1050 mm and 6.65 kW are catalog values for the standard WS-PC01 listing. Please request written confirmation of the specification for your exact configuration before you rely on any number in a project budget or building drawing.

Where customisation genuinely helps

When a rectangular shell does not suit the space, our Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool covers square, round, oval and curved forms with an acrylic shell and structural reinforcement, which is often the better route for irregular terraces and landscaped gardens. For a project that combines swimming space with massage jets, water features and lighting in one larger unit, our Luxury Outdoor Swim Spa with Massage Jets, LED & Water Features describes that arrangement instead.

The spa rarely arrives alone on a villa or resort project. Coordinating it with the surrounding outdoor furniture for villas and resorts — loungers, shade structures and poolside seating — avoids clashing finishes and lets one shipment and one installation visit cover the whole area. Our Custom Furniture Manufacturer service covers bespoke design, prototyping and material selection when a standard catalogue item does not match the scheme.

A pre-production checklist

  • Signed dimension drawing showing finished external size, insulation and steps.
  • Confirmed jet count, jet layout and pump package for the intended users.
  • Electrical data in writing: phase, voltage, frequency, circuit protection, panel location.
  • Filtration and sterilisation method chosen for the expected usage level.
  • Site preparation agreed: base or plinth, drainage, access route, lifting needs.
  • Freight terms and delivery address confirmed, including any inland leg.
  • Named acceptance criteria for commissioning, so handover has a clear finish line.

Get those seven items agreed and production can start without change orders. Leave them open and the spa will still be on hold after your site crew is ready.

Send us your configuration before you budget

If you are specifying WS-PC01 or a shaped spa for a villa, resort or hospitality project, send the site plan and usage brief and we will return a configuration sheet with confirmed dimensions, equipment list and power figures. As a One-stop Furniture and Building Materials Supplier, we can also quote the poolside furniture and finishes around it in the same package.