A rendering of a handleless wardrobe is not a submittal. For a bedroom joinery package to be approved, priced and released into production, the buyer needs documents that can be checked against their own drawings for dimensions, layouts, finishes and site interfaces. Below is the document set we expect for a custom minimalist bedroom wardrobe from our Interior Fixtures range, and what each item has to prove before an approval can be signed.
1. Dimensioned elevations for every wall the wardrobe touches
What to ask for:
- One elevation per wardrobe run, drawn to a stated scale, with overall width, height and depth marked on the outside of the unit rather than buried in notes.
- Internal vertical dimensions: hanging rod heights, shelf pitches, drawer stack heights and any top-closing zone.
- Setout from fixed reference points — room corners, doors, skirting, switches, sockets and any structural column — so the site team can re-check the numbers independently.
- Clearances for door swing or sliding tracks, including what happens when an adjacent bedroom door is opened.
Why it matters: minimalist built-in wardrobes usually run floor to ceiling with flush, continuous panels. A single missing dimension at the ceiling line becomes a visible gap once the unit is installed. Elevations are also where you confirm that the wardrobe does not block a socket, a light switch or an air grille.
2. An internal layout drawn around real storage habits
The internal layout is the part most often left vague at tender stage and argued about after delivery. Request a separate internal diagram for each wardrobe, showing:
- Hanging zones split into short-hang and long-hang sections, with the number of each.
- Drawer zones — number of drawers, their widths and what each is intended to hold.
- Shelf storage, open display niches and any shelving above doors.
- Adjustable and fixed shelves, marked as such on the drawing.
These layouts should follow the end user. A guest wardrobe in a compact apartment project needs different proportions from a master bedroom in a villa or a hotel guest room, and the drawing should reflect that rather than repeat one standard module across every unit type.
3. Door system and opening detail
The door decision drives both price and site clearance, so it belongs in the submittal rather than in an email thread. Specify:
- Hinged, sliding or open configuration, chosen against the circulation space available in each room type.
- Handleless or handle detail. A handleless wardrobe keeps the panel face seamless, and the opening method — push-to-open or profile pull — must be stated so the hardware can be checked. Related products such as handleless concealed doors let bedroom joinery and internal doors read as one continuous surface.
- Panels: flat, recessed or raised, with edge treatment and how panels meet at inside and outside corners.
- Hinges, runners and soft-close hardware, quoted by brand and model line where possible.
4. Materials, finishes and physical samples
A finish name on a schedule is not enough for approval. The submittal should list the board type, the surface material and the colour or decor reference for every visible part — doors, carcass edges, interior faces, shelves and back panels — because these are often specified separately and quoted as one price.
Ask for physical samples of the door face, the matching edge and the interior panel. Matte and woodgrain surfaces read differently under warm bedroom lighting than on a screen, and a sample settles that question before the order is placed. Where a project also specifies handleless minimalist kitchen cabinets, request the samples from the same set of finish options so the bedroom and kitchen genuinely match rather than merely resemble each other.
5. Interfaces with flooring, ceilings and electrical work
A wardrobe is only as good as its junctions. The submittal should record:
- Whether the unit sits on the finished floor or is packed up above it, and how skirting is handled.
- How the top panel meets a ceiling that is rarely level — scribe piece, shadow gap or flush trim.
- Whether integrated lighting is included, where wiring is routed, and who supplies the transformer and the switch.
- Responsibility for making good around the unit, agreed in writing between the joinery supplier and the site builder.
6. A schedule that makes the drawings enforceable
Drawings without a matching schedule are decorative. Alongside them, ask for:
- A room-by-room schedule with unit codes that match the drawing numbers exactly.
- Quantities per unit type, so substitutions across rooms cannot be made silently.
- Lead time counted from drawing approval, plus a list of what must be approved before production starts.
- Packaging and delivery method for a made-to-measure item, and the inspection process on arrival.
A practical sequence for getting it right
| Stage | What you send | What you should get back |
|---|---|---|
| Enquiry | Room list, target layout notes, architectural drawings | Preliminary layouts and a finish direction |
| Design development | Your storage requirements per room type | Elevations and internal layouts for comment |
| Sample review | Approved elevations, shortlisted finishes | Physical door, edge and interior samples |
| Approval | Signed drawing set with revision numbers | Firm price, lead time and production release |
| Site readiness | Floor and ceiling levels, electrical setout | Interface details and installation sequence |
Two rules keep this process inexpensive. Never let a supplier start production on unnumbered drawings, and never approve a finish from a photograph. Both errors surface at handover, when correcting them costs far more than it would have at submittal stage.
Before you submit: check that every wardrobe in your schedule appears on a drawing, that each drawing carries a revision number and date, and that the door system, finish references and internal layout are shown on the drawings themselves rather than described in correspondence. If any of those three is missing, the package is not yet a submittal.
How we support this as one package
SANTERSON has operated since 2008 as a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects. Bedroom joinery is produced alongside the rest of our interior fixtures — Interior Fixtures covers cabinetry, doors, wall systems and storage walls such as our full height storage walls — which means one drawing set, one revision sequence and one production schedule instead of several suppliers each maintaining their own details.
Our Custom & OEM Service covers custom furniture design and prototyping, bespoke material finishes and textures, and OEM manufacturing with flexible minimum order quantities. Logistics & Door-to-Door Delivery handles freight forwarding by sea, air and rail together with the associated customs paperwork, and Installation & After-sales Support covers on-site installation, inspection and snag lists. Published project references include villa and apartment work in Willoughby, Perth, North Turramurra, Melbourne and Sydney.
Material availability, minimum order quantities, transit terms and warranty scope vary by configuration and destination, so we confirm all of them for the specific project rather than quoting them as standard.
Send us your room schedule and architectural drawings. We return dimensioned elevations, internal layouts and a finish direction for each bedroom wardrobe, and price the package once the drawings are signed off.