A toilet that arrives on site with the wrong outlet orientation stops a guest-room floor. On hospitality projects, most avoidable sanitary-ware problems trace back to a specification line that said only "toilet, white, ceramic". The Two Piece Washdown Toilet 1038A is a useful test case, because it can be installed either way — floor outlet or wall outlet — and every one of those choices has to appear on the purchase document before production starts. Below is the line-by-line method our project team uses when a buyer writes that specification.

Start With the Outlet, Not the Style

Designers usually pick a bowl shape first and drainage last. On a hotel fit-out the order reverses, because the waste run is already cast into the slab or boxed into a shaft by the time sanitary ware reaches the procurement list. The 1038A supports both arrangements: an S-trap with a floor outlet and a P-trap with a wall outlet. That flexibility is an advantage only if you state which one applies to each room type.

Two figures decide whether the unit actually fits. For the wall-outlet option, the reference rough-in measured from the finished wall face is 180 mm. For the floor-outlet option, the reference distance from the finished back wall to the centre of the waste outlet is 250 mm. Both numbers come from our product page, and both must be re-checked against the technical sheet issued for your order before you sign off — on a refurbished building, existing pipework rarely matches a catalogue drawing exactly.

Write the measurement together with its reference surface. "250 mm" is meaningless; "250 mm from finished wall face to outlet centre, floor waste" is a specification. Both figures above are the references published on the product page; if your site dimension falls outside them, raise it at quotation stage rather than on delivery day.

The Six Lines a Hotel Specification Needs

Use this structure for every sanitary-ware item in your bill of quantities. It is short enough for a consultant to review and specific enough that two factories quote the same thing.

Specification lineWhat to record for the 1038A
Model and seriesTwo piece washdown toilet, model 1038A. Note that it belongs to a wider range of ceramic suites, so state whether you want the matching look across floors.
Body material and finishVitreous china ceramic with a smooth glazed surface. Name the colour explicitly; "white" should be confirmed against a physical sample, not a screen image.
Drainage type and rough-inS-trap floor outlet at 250 mm, or P-trap wall outlet at 180 mm. One option per room type, confirmed against as-built drawings.
Flushing action and cisternWashdown flushing with a separate close-coupled cistern on the two-piece body. Record flush capacity and the water-saving target your project applies, then confirm what the supplied cistern is set to.
Seat, lid and fixing kitState whether the seat and cover ship with the pan, and whether floor fixings and the wax ring or connector are included. Missing accessories are the most common cause of a stalled installation.
Quantity split and packingSplit quantities by drainage type, not one lump figure. Confirm carton marking per room type so the wrong outlet never reaches the wrong floor.

Why the Two-Piece Format Suits Guest Bathrooms

A two-piece pan keeps the cistern as a separate component bolted to the bowl. On a guest-room corridor that repeats the same layout across many rooms, this matters in three practical ways. Replacement parts stay available: if a cistern mechanism wears out after years of daily use, you service the component instead of replacing the whole suite. Height and stance suit a wide range of users, which is what a mixed-guest property needs. And the units pack and handle more easily on site than a single-body one-piece unit, which reduces breakage during a staged handover.

The trade-off is visible: a joint line between tank and bowl, and a slightly deeper footprint. Where a project calls for a seamless silhouette or an empty floor line, our Wall Hung Toilet 1038W covers that look with concealed cistern and wall drainage. Where a one-piece body is preferred, washdown one-piece models in the range carry the same dual P-trap and S-trap flexibility. Specifying the right format per room type — guest bathrooms on a two-piece pan, accessible or compact bathrooms on a wall-hung unit — is normal practice on hospitality work.

Specifying a Coordinated Suite

Hotels rarely buy one ceramic item. When the pan, basin and any bidet share a family look, the bathroom reads as designed rather than assembled from whatever was in stock. The 1038 series extends to a floor-standing bidet that matches the same bowl profile, and the range also covers wall-hung basins and pedestal basins in coordinating shapes. List each item with its own model code on the schedule; a supplier can match a look across codes, but only if each line is written out.

For a broader view of what goes into a guest bathroom package, our Bathroom Fixtures for Hotel Projects category page groups the ceramic ranges by fixture type.

Cleaning and Maintenance Notes Worth Putting in the Handover File

The glazed surface on this pan is designed to resist dirt adhesion, which is why housekeeping can keep a washdown toilet looking correct with routine cleaning. Two instructions protect that glaze over years of daily scrubbing:

  • Use neutral pH cleaners and soft cloths or brushes. Abrasive powders, hydrochloric-acid based descalers and rough scouring pads dull the glaze, and a dulled surface then holds staining — the opposite of what the specification intended.
  • Log the drainage type and rough-in figure in the asset register for each room type. When a replacement is needed years later, that record prevents someone ordering the wrong outlet.

Ordering for Multiple Rooms: What to Agree Before Production

For a project order, we support bulk supply and project-level customisation. Three points settle themselves before production rather than after:

  • Sample approval. Approve one physical unit per drainage type against the as-built dimension on site. Photograph the installed sample and keep it as the reference for the batch.
  • Mixed-quantity split. It is normal for one order to combine S-trap and P-trap quantities across different floors or refurbishment phases. declare that split in the enquiry so each quantity is produced to the right outlet.
  • Delivery packaging and sequence. Sanitary ware is fragile and heavy. Confirm carton strength, pallet configuration and whether delivery is staged by floor for a phased handover — see our notes on logistics and door-to-door delivery.
Send us the room-by-room schedule, not just a total quantity. A list that pairs each room type with its drainage type and rough-in figure lets us quote accurately in one round instead of three.

A Short Pre-Order Checklist

Confirm before the purchase order is issued

  • Drainage type selected per room type: floor S-trap or wall P-trap.
  • Rough-in figure verified on site against as-built drawings, with the reference surface named and the value taken from the technical sheet for your order.
  • Colour and glaze approved from a physical sample.
  • Seat, cover, fixings and waste connector confirmed as included or excluded.
  • Flush capacity and cistern setting recorded against the project's water target.
  • Coordinated basins and any bidet listed with their own model codes.
  • Quantities split by drainage type, carton marking agreed per room type.
  • Technical sheet for the order read against your plumbing drawings — not only the website figures.
Two Piece Washdown Toilet 1038A with dual S trap and P trap options for hotel bathroom projects
Two Piece Washdown Toilet 1038A, vitreous china ceramic, offered with floor S-trap and wall P-trap drainage options.

Send us your bathroom schedule

SANTERSON supplies ceramic sanitary ware alongside furniture, lighting, cabinetry, flooring and finishes as one procurement package for hotel, villa and office projects. Share your room-by-room fixture list, drainage details and target programme as part of your wider Furniture and Building Materials Project Procurement package, and we will return a quotation with the specification lines confirmed.