A swim spa quote only becomes useful when every supplier is pricing the same thing. Because Outdoor Swim Spa WS-115Fⅴ is sold as a configurable outdoor swim and hydrotherapy unit rather than a fixed catalogue item, the information you supply in your request for quote decides whether you receive a comparable price or an incomplete one. This guide sets out what to include so that suppliers respond with firm, like-for-like numbers.
Start With the Model and Its Published Baseline
Name the model in full — WS-115Fⅴ — in the subject line and the first paragraph. Suppliers manage several similar swim spa shells, and a quote that does not state the model cannot be compared with a competitor's. Then confirm what the published specification already covers, so your request adds options instead of restating defaults.
The catalogue entry for this model lists the following baseline:
| Item | Published figure |
|---|---|
| Catalog dimensions | 5000 × 2200 × 1250 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump | 1 pc |
| Filter pump | 1 pc |
| Jet total | 24 pcs |
| LED lights | 4 pcs |
| Total power | 8.05 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Treat these as the starting point and ask the supplier to confirm them in writing for your configuration. The product page itself instructs buyers to confirm included equipment and electrical requirements for the selected configuration, because options change what leaves the factory.
Specify the Options That Change the Price
The catalogue lists optional accessories for this range: control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so state which of these you want quoted and which you do not. A quote that bundles a heat pump and one that omits it can differ by more than the difference between two suppliers.
- Heating: state whether you want a heat pump included, and what water temperature you expect to hold. An unheated shell is a different product from a year-round swim spa.
- Water treatment: ozone appears in the published feature list; UV sterilization and sand filtration are catalogue options. Say which combination you want priced.
- Insulation: relevant for cooler climates and for running cost, and it affects transport volume as well.
- Steps and access: state whether steps are required and on which side, since this relates to your site layout.
- Pumps and controls: confirm the pump and control set quantities rather than assuming an upgrade is included.
Give the Site Conditions That Affect Installation
The unit's catalog footprint of 5000 × 2200 × 1250 mm is only part of the picture. Tell the supplier how the spa will sit and be reached, because these details change both the product configuration and the delivery plan.
- Whether the installation is above ground, partially recessed or fully recessed, and whether a platform, plinth or pit has already been built.
- Access route from the delivery vehicle to the final position, including gate widths, overhead obstruction and whether a crane is needed.
- Drainage, waterproofing and any local trades you will appoint yourself.
You do not need engineering drawings in the first request. A short description of the site condition is enough to stop a supplier from quoting an unsuitable variant.
State the Electrical Supply You Can Provide
The published total power for this model is 8.05 kW, and options such as a heat pump raise the connected load. A useful request for quote states what your site can actually deliver: single-phase or three-phase supply, available service capacity, distance from the consumer unit to the spa position, and whether an electrician will handle final connection. Ask the supplier to confirm the electrical requirement of the configuration they are quoting, not of the base model.
Set Out the Commercial Terms You Need
For a project purchase, the commercial block matters as much as the product block. Include:
- Quantity and whether you are buying for one property or several units.
- Delivery address and the delivery term you want quoted. SANTERSON's logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packaging and container loading; ask for the term being quoted (for example FOB or delivered) so prices are comparable.
- Required delivery window and any site access restrictions on the delivery date.
- Payment terms you can offer, and whether you need a proforma invoice for a bank transfer.
- Whether installation support is required. The company lists installation and after-sales support among its services; ask what is included in the quote and what is charged separately.
A practical format. Send the request as one email with five short sections: 1) model and quantity; 2) options wanted and not wanted; 3) site conditions and access; 4) electrical supply available; 5) delivery address, term and required date. Ask each supplier to reply against the same list so you can read two quotes side by side.
Questions Worth Asking in the Same Message
Which items are included at the quoted price?
Ask for an itemised packing list. Jet count, LED count, pump quantities and the swim training system should appear as line items, so nothing is silently substituted.
What electrical requirement applies to my configuration?
Request the figure for the quoted build, including any heat pump or extra pump you have added, and confirm whether final connection is your electrician's scope.
How is the spa transported and what packaging is used?
Ask for the package dimensions and container type. Insulation and steps change volume, which affects freight cost.
What happens if a component needs replacement later?
Ask what spare parts are stocked for the pumps, jets, controls and lights, and how they are shipped. This is where quotes differ most after the sale.
If the Swim Spa Is Part of a Larger Fit-Out
Where the spa sits within a villa or hospitality project, buyers often source poolside furniture, outdoor furniture, wall and floor finishes and lighting at the same time. Coordinating these through one supplier reduces interface problems between trades. SANTERSON is a China-based manufacturer and one-stop supplier for furniture and building materials, with turnkey solutions covering villas, hospitality and office projects, and design through production coordination under one contract. Mention the wider scope in your request so the quotation can be grouped rather than issued piecemeal.
Before You Send
Check three things: the model name is exact, every option you care about is either included or excluded in writing, and the delivery term and electrical supply are stated. Those three points account for most of the difference between a quote you can act on and one you have to chase.
SANTERSON — furniture and building materials manufacturer, operating since 2008, with offices in China, Vietnam, Singapore and South Africa.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Send your five-section request for quote and ask for the itemised configuration of WS-115Fⅴ.
Request a Quote