Why Interior Doors Are Specified Differently From Cabinetry

A classic panel hinged door looks simple on a drawing elevation: a frame, two or four field panels, a stile width, a swing direction. The information that actually determines whether the door arrives fitting its opening is rarely on the elevation at all. It sits in the wall build-up, the floor finish, the frame detail and the schedule of who measures, who supplies the architrave and who hangs the leaf.

Because our doors are made to order rather than stocked in fixed sizes, every one of those details changes what we manufacture. Classic Panel Hinged Doors can be produced with project-specific dimensions, materials and finishes, which means the specification you send is the specification we build. This guide sets out the measurements and project inputs that let us quote, produce and deliver a door set that fits on site the first time.

Part One: The Measurements That Define the Door

Send us dimensions taken from the built opening, not from the architectural drawing alone. Drawing dimensions describe design intent; openings as built vary with blockwork tolerances, plaster thickness and floor levels. Where an opening is still to be built, tell us that too, so we can quote against the drawing and confirm a site check before production.

1. Structural opening: width, height and wall thickness

Record the clear width and clear height of the finished opening at three points across each dimension (top, middle and bottom for width; left, centre and right for height) and give us all three figures rather than an average. Out-of-square openings are common, and the spread between readings tells us whether to build the frame to suit or to flag packing adjustments.

Wall thickness, measured through the completed wall including plaster, tile or cladding on both faces, sets the depth of the frame we produce. A door in a partition that will be tiled differs from the same door in a painted stud wall, and the difference is not visible until the frame arrives.

2. Clear opening versus frame size

State which dimension you are giving us. A structural opening and the leaf size that fits inside it are not the same number, and once the frame profile is chosen the gap between them is fixed. If you have a target clear passage width (for accessibility, for moving furniture through, or to match an existing door line), say so explicitly, and we will work back from it.

3. Floor finish and clearance under the leaf

Tell us the finished floor level on both sides of the opening and what the floor covering is: engineered timber, tile with adhesive and screed, carpet with underlay, or a raised access floor. Undercut and bottom-rail height are set from that information, not from a default. A door measured before the screed goes in will sit too high or drag once the finish is laid.

4. Swing direction, hinge hand and approach

For each opening, confirm which side the hinges sit on when you stand facing the door from the room you approach it from, and whether the leaf opens into or out of that room. For double-leaf or paired doors, state which leaf is active and which is fixed. Where a corridor, a stair nosing, a vanity or a wall return limits the arc, send the sketch, because this is where doors get changed on site.

5. Hardware interface

Hinges, lock body, handle set and any door closer determine the prep we machine into the leaf and frame. Either tell us the hardware you intend to use (make, model and backset) or ask us to prepare for a standard set and confirm it before cutting. Strike-and-plate position on the frame is part of the same decision.

6. Architrave, lining and reveal detail

Confirm whether architraves are included in our scope or supplied locally, their profile and width, and whether the door is to be flush with the wall face or set into a reveal. For tighter, cleaner lines, doors that sit aligned with the finished wall are specified differently again, so tell us which detail you are working to before we size anything.

Part Two: The Project Inputs That Shape Production

Dimensions get the door into the opening. These six inputs decide whether it matches the rest of the project, and they are the ones most often missing from an early enquiry.

InputWhat to sendWhy it changes production
Door scheduleA numbered list of openings with sizes, quantities and room namesFixes the production batch and lets us flag repeated identical leaves for efficiency
Panel layoutNumber of field panels, raised or recessed profile, rail and stile widthsDetermines the frame build and how the panel proportions read at the actual leaf height
Material and finishCore construction, surface material, colour or grain reference, sheen levelSets machining, finishing sequence and lead time; a sample reference avoids colour disputes later
Matching joineryWardrobes, cabinetry or panelling the doors must sit alongsideLets us match grain direction, edge profile and sheen across trades from one factory
Site conditionsHumidity exposure, proximity to bathrooms or pools, underfloor heatingInfluences construction and finish specification for the environment the door lives in
Delivery planSite address, phasing, container preference, storage available on arrivalDetermines packing, labelling by room and how the order is split across shipments

Finish references need a physical sample on multi-room projects

A colour name or a screen proof is not enough once doors, wardrobes and wall panelling have to read as one scheme. On villa and hospitality work we usually recommend approving a finished sample of the panel profile and surface before full production runs, because the same lacquer reads differently on a flat surface and on a moulded panel edge.

Coordinate doors with the joinery package

Where the project already includes custom built-in wardrobes, kitchen cabinetry or wall panelling from us, send the door schedule with that package rather than as a separate order. Panel profiles, edge detailing and sheen are then set once for the whole interior instead of being matched after the fact. Related styles in the same family, such as wood veneer hinged doors or decorative interior doors, can be specified room by room while keeping one construction and finish standard.

Confirm who measures and when

Decide at the outset whether you will send us measured openings or whether we work from drawings with a confirmation stage before production. Both approaches are used on projects; what causes rework is starting production while that question is still open.

A Practical Specification Checklist

  • Clear width and height at three points each, with the wall thickness through the finished build-up
  • Finished floor levels either side of the opening and the floor covering to be installed
  • Swing direction, hinge hand, active leaf for paired doors, and any obstruction limiting the arc
  • Hardware make, model and backset, or written confirmation that we prepare for a standard set
  • Architrave scope, profile and whether the door sits flush to the wall face or in a reveal
  • Panel count and profile, rail and stile widths, and the approved finish sample reference
  • Quantities by room, site address, delivery phasing and storage available on arrival

One point worth confirming before you send dimensions: our door pages describe made-to-measure sizing with material and finish options, and each order is confirmed against the project's own drawings and site conditions. Published product images show one possible configuration, not a fixed catalogue size, so treat them as a starting reference for the detail you want.

How This Fits Into Ordering From Us

SANTERSON has been manufacturing furniture and building materials in China since 2008, supplying project customers in hospitality, villas and offices. Doors travel as part of a wider fit-out: interior fixtures, joinery, flooring, lighting and ceramics can be produced and shipped together under one project coordination.

Once the schedule above is confirmed, production follows the sequence on our service pages: detail confirmation, manufacturing and quality control, then packing and shipping coordinated with the rest of the package. Freight by sea, air or rail, export paperwork and door-to-door delivery are arranged with a dedicated coordinator for the project.

Frequently Asked Questions

Should I give you drawing dimensions or site-measured dimensions?

Site measurements from the completed opening are preferred. If the openings are not yet built, send drawing dimensions and mark them as such; we will confirm a measurement stage before production starts.

Can you match an existing door on a renovation?

Yes, in most cases. Send the panel profile measured across rail and stile widths, a photograph of the elevation, and a physical finish sample or the closest reference you have. Matching grain and sheen to existing joinery is easier when we see a sample rather than a description.

What if my openings are not square?

Send all three readings for each dimension. We will tell you whether the frame can be built to suit the variation or whether packing on site is needed, and we will flag it before production rather than after.

Can doors be ordered together with wardrobes and cabinetry?

Yes, and that is usually the better route. One schedule covering doors, wardrobes and cabinetry lets us set panel profiles, edge details and finishes consistently across the interior.

Send Your Door Schedule

If you have a door schedule or a set of elevations ready, send them with room names and quantities and we will come back on feasibility, specification options and pricing. For a project still in early design, tell us the openings you expect and we will work through the details above with your team before anything goes into production.

Start with the Classic Panel Hinged Doors product page for the range overview, or send your drawings directly through our contact page.