A floating TV unit looks simple on a rendering and complicated on site. The cabinet appears to hover, the screen disappears into a panel, and the cables are nowhere to be seen. Getting that result depends less on the joinery than on what procurement recorded before production started. This guide lists the documentation that keeps wall-hung media cabinetry from becoming a site problem.

Why floating TV units create more documentation work than freestanding ones

A floating TV unit carries its own weight and the weight of the screen, drawers and shelving through a hidden support system into the wall behind it. Nothing about that load path is visible once the finish panels are on. A freestanding cabinet, by contrast, simply sits on the floor and can be moved if the plan changes.

That difference is why we ask procurement teams to treat a floating unit as an assembly of five separate trades: the substrate or framing that carries the load, the carcass and its hardware, the screen mounting and its service loop, the low-voltage and power wiring, and the decorative finish that ties the whole thing to the surrounding wall. Each one needs its own line on the drawing and its own name against it. If any of the five is only implied, somebody will improvise on site.

1. Wall substrate, load path and fixing method

Before a quotation can be trusted, the wall condition has to be stated in writing. The same unit fixed into a concrete wall, a steel-stud partition or a timber stud wall with plasterboard needs completely different blocking, brackets and fixings.

  • Substrate type and its thickness, confirmed by site survey rather than from the architectural drawing alone
  • Position of studs, noggins or existing framing, marked on the setting-out drawing
  • Total hanging load: carcass, doors and drawers, screen, soundbar and any display items
  • Fixing specification — bracket type, fixing centres, anchor type and embedment depth
  • Who supplies the blocking or reinforcement, and who installs it

For larger formats and for full-height compositions such as our Integrated TV Panels, we ask the site team to confirm the substrate before we release the carcass drawings. It is cheaper to add a plate in the framing than to rebuild a finished wall.

2. Dimensions, projection and clearances

Made-to-measure sizing means every dimension is a decision rather than a catalogue number. Our listings state made-to-measure sizing, material and finish options and layouts tailored to the project, so the drawing pack needs to be explicit.

DimensionWhat to record
Overall width and height of the unitTied to a grid line or datum, not to an approximate room measurement
Carcass depth and projection from finished wall faceFinished face dimension, including any shadow gap or reveal
Height of the unit off finished floor levelMeasured from finished floor, with the floor build-up stated
Screen centre height and viewing axisSet from the seating layout, then cross-checked against head clearance
Door and drawer swing or travelClear of the sofa arm, the coffee table and adjacent cabinetry
Service gap behind the screenEnough depth for the bracket arm plus connector clearance

Record the floor build-up explicitly. A 20 mm difference in screed or tile thickness moves every hanging dimension, and it is the error we see most often when a unit arrives and does not sit where the drawing says it should.

3. Screen type, mounting bracket and service access

The screen specification changes the carcass. Note the model or at least the size range, the VESA pattern, the weight and whether the installation calls for a fixed, tilt or full-motion arm. A pull-out arm needs a deeper recess than a flush fitting, and it changes where the carcass side panels can sit.

  • Screen size, weight and VESA pattern
  • Bracket type: fixed, tilting or articulating arm
  • Cable routing from screen to equipment, and whether connectors are reachable after installation
  • Whether the TV sits inside a panel aperture or in front of a finished surface
  • Aperture dimensions with a stated tolerance

Where the brief calls for the screen to be concealed, our Sliding Panel TV Systems are configured with the panel travel and stacking side drawn out in advance. Concealment adds a mechanism, and mechanisms need clearance documented before the panels are cut.

4. Cables, power and equipment storage

The clean look depends entirely on what is buried. Procurement should hand over a first-fix drawing that matches the joinery drawing exactly, not two separate documents produced by different consultants.

  • Position of power outlets and data points relative to the unit's datum lines
  • Conduit or trunking routes, with diameters and bend radii for HDMI and speaker cable
  • Location and ventilation of any equipment housed inside the carcass
  • Remote-control line of sight where equipment sits behind a door or panel
  • Lighting circuits if integrated LED media units are part of the package

Equipment that runs warm needs ventilation provisions and access for servicing. We would rather see this resolved on paper than discover during handover that a set-top box inside a closed compartment cannot be reached or cooled.

5. Materials, finishes and the surrounding wall

A floating unit usually reads as part of the wall rather than as furniture, so its finish has to reconcile with the panelling, flooring and joinery around it. Specify the substrate, the surface material, the colour or decorative reference, the edge treatment and the direction of any grain.

Where the media composition continues into other surfaces — veneer panels, stone, textured wall panels or shelving — record which supplier owns each element and where the junctions fall. If the same wall carries integrated lighting, note the driver locations and how they will be accessed, because drivers fail before panels do.

6. Scope split, delivery and installation sequence

Wall-hung cabinetry sits at the boundary between joinery contractor, electrician and the fit-out team. A written scope split prevents the gap where nobody takes responsibility.

  • Who prepares and approves the wall substrate and reinforcement
  • Who carries out first-fix wiring and who tests it before closing up
  • Delivery point, packaging and container loading plan for oversized panels
  • Sequence: substrate sign-off, first-fix inspection, then unit installation
  • Inspection points and snag list before handover
  • Spare-parts and after-sales contact recorded with the asset register

A practical sign-off order

Substrate and load path approved → first-fix wiring inspected and tested → carcass installed and levelled → screen mounted and commissioned → finish panels fitted → snag list closed. Each arrow is a point where work behind the wall becomes expensive to change.

7. How we work with procurement on these packages

SANTERSON has manufactured furniture and building materials since 2008, supplying project customers in hospitality, villas and offices. For media walls and built-in cabinetry we take the specification through design consultation and space planning, material selection and product specification, manufacturing with quality control, then project management and site coordination through to installation and handover.

Because the same team produces cabinetry, wall panelling, doors, vanities and lighting for a project, finishes can be matched across trades instead of approximated from separate samples. That is where the coherent look in the photograph actually comes from. Our Custom & OEM Service covers bespoke dimensions, materials and finishes, and our logistics team arranges freight with customs paperwork and door-to-door delivery.

Documentation checklist to attach to your enquiry

  • Setting-out drawing with datum lines, projection and off-floor heights
  • Wall substrate report with stud or framing positions marked
  • Hanging load schedule including the screen
  • Screen model, VESA pattern and bracket type
  • First-fix electrical drawing showing outlets, conduit and driver locations
  • Finish schedule with material references and edge details
  • Written scope split between trades
  • Inspection and sign-off sequence

All dimensions, materials, hardware and technical provisions for a floating TV unit are confirmed project by project. The figures and arrangements described here are the items we ask buyers to specify, not fixed product specifications.

Send us your setting-out drawing and wall condition.

We will return carcass drawings, a fixing specification and an itemised quotation for Floating TV Units and the surrounding media wall. Contact PHILLIP on +86-13928214007, email santerson@qq.com, or use our contact page.