A floating TV unit looks simple on a wall and complicated on site. The cabinet appears to hover, the screen sits clean and centred, and every cable has disappeared. None of that happens by accident. Before a single bracket is fixed, an installation plan needs to settle where the load goes, what sits behind the plasterboard, how the screen connects to power and signal, and who signs off each step. Below is the working checklist we use when a floating TV unit moves from a drawing into a living room, media wall or villa project.
1. A survey of the wall before any load is assumed
The first decision is not about style; it is about what the wall can carry. Record the wall construction, the stud or framing centres, the clear height and width, and whether the surface is plasterboard, masonry or an existing panel system. A floating cabinet transfers its weight plus the screen into the substrate, so the fixing route has to be decided from the build-up, not guessed on site.
- Confirm wall type, thickness and framing layout, and mark the solid fixing lines before setting out the unit.
- Measure clearances: skirting, cornices, switches, air grilles, door swings and any return wall that limits how far a drawer can open.
- Note floor-to-floor height and seating distance, because these set the screen centre line and therefore the cabinet height.
- Photograph the site condition, including cracks or unevenness that will need packing or making good before panels go up.
Where the wall is not suitable for a direct fix, say so early. A change of substrate, an added batten frame or a move to wall mounted media walls with their own support frame is far cheaper as a drawing revision than as a site variation.
2. Made-to-measure dimensions and the fixing method
Our floating TV units are made to measure, so the plan should carry final dimensions rather than a catalogue size. Depth matters more than it looks: cabinet depth, screen depth and the recess behind the unit have to work together or the screen ends up proud of the carcass. Confirm the opening width, drawer and door clearances, and the projection from the finished wall face.
- State the finished dimensions against the completed wall finish, not the structural wall, so plasterboard thickness is already accounted for.
- Agree the fixing system and load path with us before production, including bracket type and whether a concealed batten frame is required.
- Record the combined weight of the cabinet, screen and any soundbar or speaker shelf in the same zone.
- Confirm hardware choices — soft-close drawers, handleless fronts, hinge type — because these affect the clearance each front needs to operate.
Layout is tailored to the project as well. A media wall that carries shelving either side behaves differently from a single floating cabinet, and full-height arrangements such as full height media walls usually need their setting-out drawn across the whole elevation instead of one unit at a time.
3. Cable routes, power and signal points on a drawing
This is where most floating installations fail visually. The plan should show every cable route as a drawn line: mains outlet for the screen, low-voltage runs for players and consoles, aerial or network feed, and any speaker cabling. Positions are given in millimetres from a fixed corner and floor level, so the electrician and the joiner work to the same numbers.
- Place the power and signal points inside the cabinet zone or behind a service void, never below the unit where leads become visible.
- Leave a pull-through route with enough bend radius for HDMI and fibre; avoid sharp 90-degree trunking.
- Decide now whether devices sit in the floating unit or in a separate cabinet, because that determines cable length and ventilation needs.
- Check access: sockets and connections must stay reachable for servicing without removing the carcass.
If integrated lighting is part of the design, treat it as an electrical item on the same drawing. Integrated LED media units need driver positions, a switching point and accessible drivers — details that have to be confirmed for the selected design before the panel is cut.
4. Screen mounting and viewing geometry
A bracket fixed at the wrong height cannot be corrected later without patching. Set the screen centre line from actual seating, then check it against the cabinet top and any open shelving above. Note the bracket type, whether a full-motion arm is needed, and the space behind the screen for connectors.
- Confirm the screen size and VESA pattern before the carcass is built, so the plate lands on solid framing.
- Allow ventilation around the screen where it sits in a recess or between closed fronts.
- Decide whether the screen sits on top of, in front of, or inside the joinery line — each has a different fixing detail.
5. Storage layout: what goes open and what goes closed
A floating unit that only looks good in a render is not finished. Agree what has to be stored — consoles, games, board games, blankets, documents — and split it between open display and closed fronts. Open & closed combo units are the usual answer in family rooms, because everyday clutter disappears while the things you reach for stay within arm's reach of the sofa.
- Keep heavy items in lower zones; a floating cabinet is not a place for dense storage at height.
- Set shelf spans to suit what they carry, and confirm shelf adjustability where the collection will change.
- Check that open niches do not cut across the fixing lines the carcass depends on.
6. Finish, material and how the unit meets the wall
Material and finish are project decisions with site consequences. A veneer or lacquered front needs a different protection routine on site than a textured laminate panel, and the reveal between cabinet and wall has to be resolved: square set, shadow gap, or a feature panel behind. If the media wall continues into wall panel systems, the two trades should share one setting-out drawing so the joints line up.
- Approve a finish sample against the room's actual light before production, especially for dark and high-gloss surfaces.
- Agree who makes good the wall after fixing, and what happens to fixings that miss their mark.
- Record edge treatment where the carcass is visible from the side or from an adjacent room.
7. Sequence, access and responsibilities
The plan should read as a timeline with names against each step: first fix and electrical rough-in, wall make-good, cabinet fixing, screen mounting, then final inspection. A made-to-measure unit arrives late in the programme, so any change to wall position or socket location after that date carries cost.
- Confirm delivery route and access — lift, stair width, corridor turns — before a long carcass reaches the door.
- Agree storage on site; a floating unit leaning against a wall in a wet room is a claim waiting to happen.
- Set out who marks the wall, who fixes, who connects, and who signs off at handover.
- Book a snag list walk with photographs before the site is handed over.
Before production starts, confirm in writing
Final dimensions against finished wall levels; wall construction and fixing method with load figures; positions of all power, signal and lighting points; screen size, bracket and centre height; storage layout and hardware; finish sample approval; and the installation sequence with responsibilities. Anything left open at this point becomes a site variation later.
A short version for the site file
- Wall survey, framing lines and clearances recorded and signed.
- Made-to-measure dimensions issued against finished floor and wall levels.
- Fixing system and combined load confirmed with the manufacturer.
- Power, signal and lighting positions dimensioned on a drawing.
- Screen bracket, size and centre height fixed.
- Storage split, hardware and finish sample approved.
- Delivery access, installation sequence and handover sign-off agreed.
Common questions
Can a floating TV unit go on plasterboard?
Only when the framing behind it is identified and the fixings are routed into solid members or an added batten frame. The plan should show that route before the board is closed up; otherwise the wall has to be opened again.
How early should the unit be specified?
Before first-fix electrical work. Cable and socket positions are set from the cabinet layout, so specifying late means either visible leads or a second visit to move outlets.
Is a floating unit better than a floor-standing one?
It depends on the wall and on storage needs. Where the substrate cannot carry the load, or where you want a full-height arrangement with display shelving, freestanding TV cabinets and full-height systems avoid structural work entirely.
Working from one plan through to handover
SANTERSON manufactures floating TV units and matching media walls to project dimensions, with material and finish options selected for each space. As part of our turnkey project solutions, the same team handles production coordination, door-to-door delivery and installation support, so the setting-out drawing, the joinery and the fixing sequence come from one source. Send us your wall survey, screen size and storage requirements and we will return a layout with dimensions, finish options and a fixing method for review.