A swim spa specification looks simple on a product page: a model code, three dimensions and a short feature list. In practice, the same Outdoor Swim Spa WS-115EⅢ-U can be ordered in very different ways, and those choices — not the model code alone — decide whether it works on site. If you are specifying a plunge-and-swim unit for a villa terrace, a resort garden or a private clubhouse, this is what has to be settled before an enquiry goes out.

Start with the room around the shell, not the shell

The catalogue envelope for WS-115EⅢ-U is 5280 × 2200 × 1250 mm. That figure is the footprint of the unit; it does not include steps, plant access, handrails or the clearance a technician needs to reach the pumps and the filter. A deck drawing that shows only the outer rectangle will look fine on paper and fail on site.

Before anything else, confirm three measurements on your own drawings:

  • Total length including access steps, plus the direction the steps face — this determines which side of the unit becomes the arrival route and where guests or residents approach from.
  • Structural bearing line. A filled shell carries several tonnes of water. The deck, slab or plinth has to bear the load along the perimeter the manufacturer states, not merely sit under it.
  • Lift and access route. A 5.28 m shell rarely passes through a standard side gate. Crane, gantry or a pre-cleared route has to be planned while the surrounding landscape and paving are still open.

Match the equipment set to how the spa will actually be used

The standard specification for this model lists one control system, three water pumps, one filter pump, a total of 24 jets, two LED lights and a total power figure of 9.65 kW, with water jets, LED lighting and ozone shown as the featured functions. Compare that with the shorter variant in the same series, WS-115AⅢ-U at 3880 × 2200 × 1250 mm: four water pumps, 23 jets, one LED light and a total power figure of 11.85 kW. The longer unit is not the more powerful one.

Specification shown in catalogueWS-115EⅢ-UWS-115AⅢ-U
Catalogue dimensions (mm)5280 × 2200 × 12503880 × 2200 × 1250
Water pumps3 pcs4 pcs
Filter pump1 pc1 pc
Jet total24 pcs23 pcs
LED lights2 pcs1 pc
Total power9.65 kW11.85 kW
Swim training systemNot listedNot listed

Two things in that table should change the way you write the specification. First, no swim training system is listed for either model. If a project needs continuous-current swimming rather than hydrotherapy jets, ask explicitly what propulsion equipment is supplied with the chosen configuration and how it is controlled; do not assume it comes with the shell. Second, jet count alone does not tell you how the spa feels. What matters for a wellness brief is where the jets sit, what pressure they run at and whether the seating positions match the number of users the client expects.

Treat every figure above as a catalogue entry to be re-confirmed on your quotation. Included equipment, jet layout and electrical requirements vary with the configuration selected, and the option list differs between markets and production batches.

Decide the options early, because they change the services you need on site

The catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options. Each one has a consequence beyond the price line:

  • Heat pump. Determines the electrical load and whether the supply, protection and any dedicated circuit are sized for year-round use rather than summer use only.
  • Insulation. Relevant wherever night temperatures drop; it affects running cost more than most buyers expect, and it should be specified with the heat pump decision, not after it.
  • Sand filtration versus the standard filter pump. Affects where plant equipment is located, how it is screened from view and how it is reached for backwashing.
  • UV sterilisation and ozone. Both relate to water treatment. Confirm what combination is included in your specification so you are not quoted two systems doing the same job.
  • Steps and control system. These fix the geometry of the approach and the position of the user interface, which is worth settling while the paving design is still movable.

Confirm the electrical and water supply scope in writing

Total power is stated as 9.65 kW for this model. That number covers the spa's own equipment; it does not cover the supply cable, distribution board, protective devices, isolators or the work of a local electrician. Those are site-side items and are usually carried by the main contractor.

Put the boundary in writing before production starts: who supplies the dedicated circuit and to what specification, who handles drainage and overflow, who commissions the unit at handover, and which local regulations and inspections apply at your location. Ask the manufacturer for the wiring schedule, connection points and required clearances for the configuration you have chosen, then have your electrical contractor review them against local requirements. Getting this reversed is one of the most common reasons a delivered spa sits in its crate for weeks.

Coordinate delivery, packaging and installation as one sequence

For an imported unit, the practical chain looks like this: production slot, then packaging and container loading, freight by sea, air or rail, customs paperwork, delivery to the address, then setting, connection and commissioning. The dates only work if the site is ready when the container arrives.

SANTERSON's logistics and door-to-door delivery service covers freight forwarding, customs documentation, packaging and loading, shipment tracking and delivery to the site. Confirm for your specific order which Incoterms apply, who acts as importer of record, what duties and taxes fall where, and whether cargo insurance is included or arranged separately. Then work backwards from the delivery date to the deck completion date, allowing time for the crane or lift.

On the installation side, installation and after-sales support covers on-site setting, inspection with a snag list, warranty coverage, spare parts and ongoing maintenance. Two points to clarify for your project before ordering: which items are covered by the warranty and for how long, and what response time applies in your region once the unit is commissioned. Both should appear in the contract documents rather than in correspondence.

Specify it as part of the wider outdoor scheme

A swim spa rarely stands alone. On a villa terrace or resort garden it sits next to loungers, shade structures, storage for towels and chemicals, wet paving and lighting — all of which have to be drawn together so that levels, materials and drainage agree. Where the spa is one line in a larger outdoor package, coordinating it with outdoor furniture collections at specification stage avoids the usual clashes: lounger bases landing on an inspection hatch, a pergola post blocking the filter, or paving levels that leave no fall away from the shell.

If your project needs a different footprint — a spa set into a curved terrace, or a shape that follows a pool deck edge rather than a rectangle — ask about customised-shape outdoor spas before you commit to a catalogue model. Changing a shell geometry is a factory decision; adapting a site around the wrong shell is a construction decision, and it costs far more.

Before you send the enquiry, confirm:

  • Deck dimensions with access steps, plant clearance and the bearing line marked
  • The lift route and lifting method for a 5280 mm shell
  • Whether a swim propulsion system is required and what is supplied
  • Jet layout and seating positions against the expected number of users
  • Heat pump, insulation, sterilisation and filtration choices as one package
  • Electrical supply scope, protection and who commissions the unit
  • Incoterms, importer of record, duties and insurance for delivery
  • Warranty terms, exclusions and after-sales response in your region

Send us your drawings. Share the deck layout, target user profile and the options you are considering for WS-115EⅢ-U, and we will confirm the configuration, included equipment, electrical requirements and a delivered price for your location — with turnkey coordination across production, logistics and installation if the project needs it.