A swim spa that arrives on site with the wrong jet layout, an unsupported electrical load or a shell that cannot be lifted into place turns a good idea into a costly problem. The Outdoor Swim Spa WS-115AⅢ is one model in SANTERSON's configurable outdoor swim and hydrotherapy range, and this guide walks procurement teams, builders and villa owners through the checks that make an overseas order of it predictable: what the catalogue actually lists, which details must be confirmed before payment, and how design, production, freight and handover fit together.

What the WS-115AⅢ Is Built For

The WS-115AⅢ is a compact plunge-and-swim unit rather than a full lap pool. The catalogue footprint of 3880 × 2200 × 1250 mm means it can sit on a terrace, a deck, a courtyard or a resort podium where a conventional pool would never fit, while still giving you a swim training station at one end and a jetted seating area for hydrotherapy at the other. That combination is why projects specify this class of unit: exercise capacity in a small footprint, without excavation or pool construction.

The listed features are water jets, LED lighting, ozone sanitisation and a swim training system. In practice these map to three daily jobs — swimming against the current for training, sitting in the jetted area for recovery and muscle relief, and keeping the water clear with an ozone system plus filtration rather than heavy chemical dosing.

Reading the Specification Sheet Correctly

Before you compare prices, put every candidate model into the same table. The published catalogue data for this model reads as follows.

ModelWS-115AⅢ
Catalogue dimensions3880 × 2200 × 1250 mm
Control system1 set
Swim training system1 set
Water pump1 pc
Filter pump1 pc
Jet total24 pcs
LED lights4 pcs
Total power8.05 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Two of those lines deserve attention from the buyer's side of the table. Total power is an electrical load, not a marketing number: 8.05 kW has to be matched by your supply, breaker sizing and cable run, and it is the figure your local electrician works from. The jet total of 24 pcs tells you the hydrotherapy zone is substantial, but jet layout matters more than jet count — ask for a drawing that shows where the jets sit relative to the seating moulds, because that determines whether the massage hits the back, shoulders or legs.

A note on catalogue figures. Dimensions and equipment counts above are transcribed from the product listing. Because this is a configurable range, what ships on your order depends on the configuration you confirm in writing. Treat the sheet as a starting point for a quotation, not as the final build specification.

Decide the Configuration Before You Ask for a Price

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option should appear as its own line on the quotation with a quantity and a specification.

Heat pump and insulation

If the spa will be used outside of warm months, heating and heat retention become the dominant running costs. A heat pump sized for the water volume, plus insulation on the shell and a proper cover, is what keeps an outdoor unit usable in cooler weather. Specify both together; insulating a shell without adequate heating, or heating an uninsulated shell, wastes budget either way.

Water treatment

The base listing includes ozone. UV sterilisation and sand filtration are listed options in the range. Decide what your maintenance routine looks like — a hotel or resort unit with heavy daily use is a different sanitisation question from a private villa unit used a few times a week — and let that drive the option list rather than taking the biggest package by default.

Access and installation hardware

Steps, access platform and any lift or crane requirement should be settled at quotation stage. A unit of this size has to reach its final position: measure gate widths, deck loadings, overhead clearance and the path from the delivery point before you choose the placement, not after.

Working With an Overseas Manufacturer

Sourcing a swim spa direct from a China-based factory usually means buying through a supplier who also handles furniture and building materials for the same project. That is where real savings appear — one coordination chain instead of several — but only if the workflow is explicit. SANTERSON has operated since 2008 as a manufacturer and one-stop solution provider, with stated services covering custom/OEM work, logistics and door-to-door delivery, installation and after-sales support.

Stage 1 — Brief and specification

Send the model reference (WS-115AⅢ), the site photo or drawing, the placement dimension, and your supply voltage. Ask for a configuration sheet back that lists every component, pump, jet set, light and control unit included in your price. If the returned sheet differs from the catalogue table above, get the difference explained in writing.

Stage 2 — Quotation and detail confirmation

A usable quotation separates the spa shell, equipment, options, packaging, freight and any insurance. It should state Incoterms clearly so you know where your responsibility starts. Compare two or three quotations on identical configuration lines; a cheaper total usually hides a smaller pump, fewer jets or no heat pump.

Stage 3 — Production and inspection

Agree what you will see before shipment: photographs of the completed shell, an equipment list checked against the order, and a factory fill-and-run test showing pumps, jets, controls and lighting operating. For project quantities this is also the point to confirm finish colour and cabinet cladding against the design intent.

Stage 4 — Freight and customs

Sea freight is normal for a unit of this size, with packaging and container loading arranged by the factory. Ask for the commercial invoice, packing list and certificate of origin in advance so your customs broker can pre-clear rather than react. If you are also ordering outdoor furniture or other fixtures for the same project, consolidating shipments reduces both freight cost and the number of deliveries to coordinate.

Stage 5 — Installation and handover

Confirm who does what on site: base preparation and load-bearing support, electrical connection by a licensed local electrician, levelling and connection of the spa, then commissioning and snag inspection. Get written warranty terms and an agreed spare-parts position for pumps, jets, controls and lighting before the unit ships. Replacing a control board from overseas months later is a very different problem if nothing was agreed in advance.

A Procurement Checklist Before You Sign

  • Configuration sheet confirms every component against the catalogue listing, with any difference explained.
  • Electrical supply on site matches the total power figure of 8.05 kW, verified by your electrician.
  • Site access measured: gate width, turning space, overhead clearance, deck or slab loading capacity.
  • Heat pump, insulation and cover specified together if the unit will be used in cool weather.
  • Jet layout drawing reviewed, not just the jet count.
  • Incoterms, freight, insurance and delivery address stated on the quotation.
  • Customs documents agreed before production finishes.
  • Warranty terms, response process and spare-parts supply confirmed in writing.
  • Base preparation, electrical connection and commissioning responsibilities assigned by name.

When This Model Is Not the Right Fit

Not every site needs this footprint. If the brief is a long, continuous swim channel with a separate relaxation area, a longer unit such as a long outdoor swim spa with hydrotherapy and relaxation pool fits better. If the space is irregular or the design calls for a specific shape, a customizable-shape outdoor spa allows square, round, oval and curved configurations in an acrylic shell. And where the requirement is seating and massage rather than swimming against a current, a round outdoor hot tub spa with hydrotherapy jets is the simpler answer. The swim spa range covers all of these, so model selection should follow the site and the usage pattern rather than the other way around.

Frequently Asked Questions

Can I order a single unit for a private villa?

Yes. Single-unit orders for villas and residences are normal for this range; the same configuration-confirmation process applies as for a project order.

What information speeds up an accurate quotation?

Model reference, a site photo or plan with dimensions, your supply voltage and phase, whether heating is required, and the delivery address with an Incoterm you are comfortable with.

Do I need a crane?

Not always. Some installations are possible with a clear path and adequate manpower, but overhead obstruction or an elevated terrace can make lifting necessary. Send site photos early and the answer comes back before production.

Are the catalogue dimensions final?

They are the published catalogue figures for this model. Because the range is configurable, the shipped specification is the one confirmed on your signed quotation — request the configuration sheet and check it line by line.

Talk to us about your site. Send the model reference WS-115AⅢ, a photo of the intended location and your supply details, and we will return a configuration sheet with an itemised quotation. Contact PHILLIP by phone or WhatsApp on +86 13928214007, email santerson@qq.com, or through our contact page.