A decorative interior door only looks finished once the wall around it agrees with it. That is why an installation plan for Santerson Decorative Interior Doors needs more than a door schedule and a fixing detail: it has to coordinate opening sizes, wall build-up, finish levels, hardware and the sequence of wet trades. The doors in this range are made to measure for residential projects, with finish, layout and dimensions specified per space, so the plan is where those specifications become buildable. Below is the working checklist we use when a decorative door package moves from shop drawings to site.
Rule of thumb: if a single drawing does not show the opening, the frame, the wall finish and the ironmongery in one section, the detail is not finished. Everything on this list exists to close that gap before doors arrive on site.
1. A door schedule that states what is actually being installed
The schedule is the reference document for every other decision, so each opening needs its own line rather than a generic "internal door" entry. For this collection the useful fields are:
- Opening tag and room, so site teams can match a leaf to a location without interpretation.
- Leaf size and wall thickness as confirmed from site survey, not from the architectural drawing alone.
- Collection and finish reference — for example a decorative interior door in the Interior Doors range versus a concealed leaf that has to disappear into the wall.
- Opening type: hinged, sliding, pocket or folding. The hardware and the wall cavity depend on this choice, so changing it late changes more than the door.
- Handing, swing direction and latch side, confirmed against furniture layouts and circulation.
Where a door is intended to read as part of the wall rather than as an object in it, note that on the schedule too. A Santerson Decorative Concealed Door and a decorative interior door can share a finish but need different framing, so the schedule has to distinguish them before anyone orders. The same applies when the choice is between a leaf that sits proud with trim and a Flush Wall Aligned Door whose edge must sit true to the plasterboard line.
2. Site-verified openings, taken after the rough-in is fixed
Made-to-measure sizing only helps if the measurements come from the built condition. Record structural opening width, height and out-of-plumb deviation, wall thickness at several points, and floor build-up levels relative to a stated datum. Doors ordered against design dimensions get adjusted on site; doors ordered against surveyed dimensions usually fit.
- Survey date, surveyor and the drawing revision the measurements relate to.
- Tolerance range for each opening, agreed with the site contractor rather than assumed.
- Confirmation that screed, plasterboard and floor finishes are at their final level before the leaf height is fixed.
- Photographs of each opening with a tape in frame, filed against the opening tag.
For sliding and pocket types, survey the run as well as the opening. Track length, ceiling junction and any skirting interruption all affect what can be built into the wall.
3. Wall build-up and framing details drawn to scale
Decorative doors are unforgiving of a thin or unstable substrate. The plan should include a horizontal section through each opening type showing the frame, the fixing method, the cavity (if any) and the finished wall line. For flush and concealed types this is where the project either succeeds or becomes a snag list.
- Frame material and profile, and how it ties into studwork or masonry.
- Wall lining build-up and total thickness, matched to the selected frame depth.
- Concealed hinge pockets and, for a handleless concealed detail, the reveal or route that lets a hand reach the leaf.
- Architrave decision: no architrave with a shadow gap or flush trim, drawn at the actual gap dimension.
- Cavity reinforcement where heavy leaves, concealed closers or long sliding tracks will load the wall.
If the door shares a wall with panelling, resolve them together. Integrated Door & Paneling lets a door leaf sit in the same panel grid as the surrounding wall, which means the panel module, joint positions and door width must be dimensioned from one drawing rather than two.
4. Finish schedule that accounts for on-site painting and joins
The finish decision is not only aesthetic — it determines who paints what, and when. Specify the selected material and finish per opening, then state how the door meets the wall finish: painted flush, pre-finished leaf with protective tape, or a trim line that hides the junction.
| Finish approach | What the plan must state |
|---|---|
| Painted on site, door flush with wall | Primer and topcoat system, who paints the leaf versus the frame, and how hardware is masked or refitted after painting. |
| Pre-finished leaf installed last | Protection method during remaining works, and the reveal that accommodates the wall finish thickness. |
| Door matched to panelling or veneer wall | The grain direction, panel module and colour reference shared between door and wall supplier. |
Wood-veneer doors deserve an extra line: state the veneer match against the flooring or joinery in the same room. Santerson Wood Veneer Hinged Doors and engineered oak floors read well together only when the tone and grain direction were decided together.
5. Hardware, ironmongery and interface schedule
Hardware is where most decorative door packages fail visually: a specified handle defeats a concealed detail. List for each opening the hinges or pivot set, lock case or latch, handles or pull, door closer if required, and any threshold or floor guide for sliding types.
- Confirm hinge pocket depth and load rating against the actual leaf weight and size.
- For handleless details, agree how the leaf is opened — edge pull, integrated route or push hardware — and show it on the drawing. Concealed and flush sliding types in particular need the opening method fixed before the frame is produced.
- Check whether ironmongery is supplied with the door package or by a local supplier, and who is responsible for compatibility.
- Record acoustic or privacy expectations per room if they affect seals, drops or leaf construction.
6. Trade sequence and access plan
A door installation plan without a sequence is a wish list. Fix the order of operations in writing, with hold points where one trade cannot proceed until another signs off.
| Stage | Hold point before the next stage |
|---|---|
| Framing and cavity | Openings surveyed and confirmed plumb, level and at final line. |
| Wet trades and linings | Wall finishes complete and dry; floor levels at datum. |
| Door package delivery to site | Storage area agreed, off-ground, covered, and secure from weather. |
| Hanging and hardware fitting | Painting or finishing sequence agreed with the decorating contractor. |
| Snagging and handover | Operation checked leaf by leaf against the schedule. |
Delivery timing matters as much as delivery date. Made-to-measure doors arrive late in the programme, so a plan that has them stored in a wet or busy area creates damage before installation even starts.
7. Documentation, responsibilities and spare allowance
Name the owner of each item on the plan: who surveys, who signs off shop drawings, who supplies ironmongery, who protects the doors after hanging, who carries out snagging. Ambiguity here costs more than any technical detail.
- Approved shop drawings with revision numbers, countersigned before production starts.
- A spare allowance for leaves and matching hardware on multi-unit projects, so future replacements still match the wall finish.
- Care and cleaning guidance handed to the client with the door schedule.
- Written confirmation of dimensions and selected specifications for each opening before manufacture — the standard check for made-to-measure work.
A short pre-installation checklist
- Every opening has its own schedule line with type, size, handing and finish.
- Measurements taken from built conditions, dated and tied to a drawing revision.
- Section drawings show frame, wall build-up, lining level and trim detail at real dimensions.
- Hardware list confirmed against the concealed or handleless detail for each opening.
- Paint versus pre-finished decision recorded, with protection method stated.
- Trade sequence with hold points agreed and signed by the site contractor.
- Storage location, spare allowance and snagging responsibility assigned in writing.
How the supplier side supports this plan
These details decide production, not just installation, which is why we ask for them early. As a one-stop furniture and building materials supplier, SANTERSON manufactures doors in the same Windows & Doors programme as the joinery, wall panelling, flooring and fixtures that surround them, so a coordinated package avoids the tone and level mismatches that appear when each trade is bought separately. Custom & OEM service covers bespoke sizes, materials and finishes; logistics and door-to-door delivery handles freight and packaging for the whole package; and installation and after-sales support covers on-site fitting, inspection and snags. Send opening schedules and drawings for review before production begins.
Common questions before the plan is signed off
Should concealed and decorative interior doors share one detail drawing? No. They may share a finish reference, but framing, hinges and wall lining differ, so each type needs its own section.
When should door dimensions be finalised? After studwork, linings and floor levels are complete and verified on site, since made-to-measure sizing depends on the built condition rather than the design drawing.
What is the most common snag with flush decorative doors? A wall finish that moves past the frame line, or ironmongery that defeats a handleless detail. Both are resolved on paper before manufacture.