A wood tone open wardrobe looks effortless on a mood board and far less forgiving on site. Because the carcass, shelves and hanging rails are all visible, every dimension, edge band and wall junction is part of the finished look. That is exactly why we build them to project dimensions rather than to a standard module size. The difference between a clean installation and an expensive rework usually comes down to what was agreed on paper before production started.

This guide walks through the coordination we ask for on residential wardrobe projects, from the drawing set to the final site check. It applies to our Wood Tone Open Wardrobes and to the wider open wardrobe range, including freestanding, wall mounted and metal frame variants.

What makes an open wardrobe harder to coordinate than a closed one

With a hinged or sliding door wardrobe, the front hides the internals. Tolerance issues move to the door reveal, where they are easier to absorb. Remove the doors and the internals become the elevation. Three things follow from that:

  • Proportions carry the design. Shelf heights, hanging lengths and vertical dividers are read as a composition. A rail placed 50 mm off a planned line is visible from across the room.
  • Every edge is exposed. Carcass edges, shelf fronts and any transition to plasterboard or skirting need a defined detail before cutting begins.
  • The wall becomes part of the product. Open wardrobes are frequently built into niches or between existing walls. Out-of-plumb walls and uneven floors show up immediately unless the setting-out drawing accounts for them.

The drawing set we work from

We can start from a designer's sketch, but production needs a coordinated set. On a typical project these are the documents that prevent rework:

DrawingWhat it must showWhy it matters for open wardrobes
Room plan with setting-out dimensionsNiche width, height and depth; position of doors, switches, sockets and radiators near the runDetermines where vertical dividers can sit without blocking services or a door swing
Elevations of each wardrobe faceShelf grid, hanging rail heights, drawer banks, open display bays, lighting positionsThis is the finished appearance. Sign it off as an interior elevation, not a furniture detail
Cross-sections at junctionsRelation to floor finish build-up, skirting, ceiling line, cornice and any adjacent joineryFixes scribe and filler widths so exposed edges resolve cleanly against the wall
Service locationsElectrical outlets, switch plates, downlights, air conditioning diffusers, data pointsCut-outs in an exposed shelf or back panel cannot be hidden later
Finish scheduleBoard material, wood tone and sheen, edge treatment, hardware, drawer frontsWood tone samples read differently at shelf depth than on a small swatch; specify the applied finish, not a colour name alone

Where drawings are still developing, our design and production coordination service works through layout, 3D visualisation and specification with you before anything is cut. That route is described on our Interior Design Services page.

Site requirements to verify before measurements are taken

Take dimensions after the room is fixed in level, not before. The checks below are the ones that most often change a wardrobe design once a project is already on site:

  • Finish levels. Confirm the final floor build-up and ceiling line. A 30 mm difference between screed level and finished floor moves every shelf height on the elevation.
  • Wall plumb and square. Measure at several points along the run and at both heights. Record the deviation instead of averaging it; scribing is designed from the worst point, not the average.
  • Niche depth consistency. Check depth at top, middle and bottom. Older villas and renovated apartments rarely hold a constant depth over a 2,400 mm run.
  • Load path for wall mounted units. Confirm the substrate behind the plasterboard and its capacity for the intended shelf spans. If the wall cannot take the load, switch to a freestanding or floor-supported configuration rather than adding brackets on site.
  • Clearances that stay clear. Bed, door swing, curtain return, dressing table and walkway widths should be shown on the plan against the wardrobe face, including the depth of anything left on an open shelf.
  • Dust and daylight exposure. Open storage faces more cleaning than a closed one. Note window orientation and traffic, because it affects both layout choices and the practicality of shallow display bays.

Send us the survey record, not only the architectural dimensions. We design to the site as measured, which is what keeps an exposed run tight against an imperfect wall.

Deciding the layout with the end user in mind

Once the shell is fixed, layout decisions follow how the room is used. Before drawings are issued, we ask clients to confirm:

  • Hanging split: short hanging for shirts and jackets versus long hanging for dresses and coats, and in what proportion.
  • Drawer count and type: shallow for accessories, deep for knitted wear, and whether any bank sits behind a display bay.
  • Open display bays: what will actually be stored there, since styling shots assume less clutter than daily life produces.
  • Shoe and luggage storage: floor-level bays need different heights from general shelving.
  • Integrated lighting: shelf or rail lighting requires wiring to reach each fitting before the carcass is closed up.

Sample, sign-off and production sequence

For wood tone finishes we recommend approving an applied sample rather than a laminate swatch. Shelf fronts and carcass edges are produced from the same material batch and finished to the approved reference, so a physical sample seen in the room's light is worth more than a code number on a drawing.

The practical sequence we follow on residential wardrobe work:

  • Layout agreed against drawings and site survey; made-to-measure dimensions confirmed for each unit.
  • Finish sample approved, including edge treatment and hardware.
  • Production with material and finish options fixed to the signed specification.
  • Packaging and shipment coordinated as part of the wider furniture and building materials order, so joinery arrives with the rest of the fit-out rather than in a separate delivery window.
  • On-site installation and inspection against the approved elevations.

Because the wardrobes are made to measure, dimensions, material and finish are specified per project. Confirm them for each unit before release to production; that single step prevents most coordination problems we see reported on site.

Common coordination failures and how to avoid them

Problem on siteRoot cause in the drawingsPrevention
Gaps at wall junctions, filled with siliconeSingle nominal dimension used for an uneven wallSurvey deviations recorded; scribe detail drawn at each junction
Shelf cuts around a socket in the middle of an exposed bayServices not shown on joinery elevationsService locations coordinated onto the wardrobe elevation before issue
Rails too low for long garments, shelves re-drilledGeneric hanging heights copied from a standard moduleHanging split confirmed with the user; heights drawn per bay
Wood tone reads lighter or warmer than intendedColour name specified without an applied sampleSample approved in site conditions and referenced on the finish schedule
Wall mounted unit deflects over timeSubstrate and span not verifiedLoad path confirmed at survey; floor-supported option where the wall is inadequate

A pre-production checklist

  • Survey record attached: levels, plumb deviations, niche depths at multiple points.
  • Elevations signed off as the finished appearance, with shelf grid and rail heights per bay.
  • Sections drawn at floor, ceiling and side wall junctions.
  • Services located on joinery drawings, with cut-outs dimensioned.
  • Applied wood tone sample approved, edge treatment included.
  • Hardware, drawer fronts and any integrated lighting specified in writing.
  • Delivery sequence agreed against the rest of the fit-out programme.

Bringing the wardrobe into a single procurement package

Wardrobes rarely fail alone; they fail where they meet flooring, wall panels, doors and lighting. Coordinating those items with one supplier keeps the junction details on one drawing set instead of three. As a one-stop furniture and building materials supplier, we produce open wardrobes alongside cabinetry, doors, wall panelling, flooring and lighting for villa and hospitality projects, which is where the coordination rules above matter most.

Can you make an open wardrobe to non-standard dimensions?

Yes. Sizing is made to measure for each project, and layout, material and finish are specified against the approved drawings and site survey.

What information do you need to quote accurately?

A room plan with setting-out dimensions, elevations of each wardrobe face, the site survey record including wall deviations and finish levels, and the intended hanging and drawer split. A sketch is enough to start; we coordinate the rest.

When should measurements be taken on a renovation?

After floor and ceiling finishes are set and services are fixed in position. Measuring earlier means designing to tolerances that the finished room will not hold.

If you have drawings and a site survey for a wardrobe run, send both and we will review them against our production requirements before you commit to the layout. Share your project details through our contact page and we will confirm dimensions, finishes and configuration for each unit.